Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204H728 + (Rev 2 to Procedure RDW 5.2, Shipment of Limited Quantities of Radioactive Matls)
- ML20204H776 + (Rev 2 to Procedure RDW 5.6, Marking & Labeling Requirements for Shipments of Radioactive Matl Packages)
- ML093431237 + (Rev 2 to Procedure RE-CS-012, Routine Chemistry Specs & Frequency)
- ML20083N900 + (Rev 2 to Procedure RTP-34, Contamination Radiation Monitoring - Post-Accident)
- ML20114B731 + (Rev 2 to Procedure RWS-0207, Radwaste Shipping Criteria)
- ML20147B149 + (Rev 2 to Procedure S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation)
- ML20129F414 + (Rev 2 to Procedure SA-AP-ZZ-004(Q), Station Operations Review Committee)
- ML20074A503 + (Rev 2 to Procedure SOP-SG-2, Secondary Plant Chemistry Control)
- ML20210E829 + (Rev 2 to Procedure SP-505, Bisco Flexible Boots. Boot Clamp Chart Encl)
- ML20202A821 + (Rev 2 to Procedure STA-901, Personnel Screening Program. Related Info Encl)
- ML20138F718 + (Rev 2 to Procedure STS IC-275B, Analog Channel Operational Test Containment Purge Sys Radiation Monitor GTRE33)
- ML20151D155 + (Rev 2 to Procedure St-3-097-350-0, Annual Inventory of Snm)
- ML20151D147 + (Rev 2 to Procedure St-3-097-350-0, Annual Inventory of Snm)
- ML20129F716 + (Rev 2 to Procedure T-FND-90-15, Method Visual)
- ML20080P501 + (Rev 2 to Procedure TDR 406, Steam Generator Tube Rupture Procedure Guidelines)
- ML20151J105 + (Rev 2 to Procedure TDR 494, TMI-1,Post-Accident Sampling Radiological Analysis)
- ML20210C995 + (Rev 2 to Procedure TE-FVM-CS-003, Field Verification Method Unit 2 Cable Tray Hanger As-Built & Design Adequacy Verification Program)
- ML20088A277 + (Rev 2 to Procedure Toprp, Turbine Overspeed Protection Reliability Program)
- ML20202E400 + (Rev 2 to Procedure WVDP-146, Preface - Table 1 Cross-Ref Between Osr/Trs & Psrs)
- ML20149D718 + (Rev 2 to Procedure for Establishing Acceptance Criteria for Anchor Installations,Diablo Canyon Power Plant)
- ML20214W011 + (Rev 2 to Procedures Generation Package)
- ML20151N603 + (Rev 2 to Procedures Generation Package for Hope Creek Generating Station)
- ML20133F799 + (Rev 2 to Process Control Program)
- ML20212E075 + (Rev 2 to Process Control Program Description)
- ML20215L287 + (Rev 2 to Process Control Program Description)
- ML20236B006 + (Rev 2 to Process Control Program Manual)
- ML20069D785 + (Rev 2 to Process Control Program for Cnsi Mobile Solidification Units Using Dow Process & for Dewatering Resin)
- ML20073P623 + (Rev 2 to Process Control Program,Packaging of Low Level Radwastes)
- ML20141E748 + (Rev 2 to Process Review,Cmp Horizontal Slice)
- ML18003B295 + (Rev 2 to Procurement & Matl Control Procedure PMC-001, Procurement & Cataloging of Parts,Matl,Equipment & Svcs)
- ML20196C852 + (Rev 2 to Procurement Engineering Assessment Plan)
- ML20148N773 + (Rev 2 to Program Instruction PI2 Risk Significance Determination)
- ML20138J283 + (Rev 2 to Programmatic Level Description of AP600 Human Factors V&V Plan)
- ML20083A216 + (Rev 2 to Proicedure 1040-001-025, Emergency Ventilation Sys)
- ML20210C936 + (Rev 2 to Project Instruction PI-11, Cable Tray Sys Analysis & Qualification Closeout)
- ML20203M901 + (Rev 2 to Project Procedure WP-03, Evaluation & Analysis of Employee Concerns)
- ML20071C686 + (Rev 2 to Project QA Plan for Independent Design Const & Verification Program)
- ML20133J723 + (Rev 2 to Proposed Amend 110 to License DPR-54,deleting All Refs to Current Reactor Vessel Matl Surveillance Requirements from Tech Specs)
- ML20133J725 + (Rev 2 to Proposed Amend 110 to License DPR-54,deleting All Refs to Current Reactor Vessel Matl Surveillance Requirements from Tech Specs)
- ML20195G420 + (Rev 2 to Proposed Amend 138,revising Tech Specs to Reflect Addl Organizational Changes Due to Need for Addl Mgt Staffing for Present Outage & from Expansion of long-term Mgt Function)
- ML13326A803 + (Rev 2 to Proposed Change 216 to License DPR-13,consisting of Suppl 2 to Amend Application 176,correcting Typos & Editorial Oversights,Including Administrative Change to Section 6.4.1, Training)
- ML20151X867 + (Rev 2 to Proposed TS Bases,Changing Name of Cooling Sys to Modular Spent Fuel Pool Cooling & Cleanup Sys & Updates Spent Fuel Pool Heat Up Info to 3 1/2 Years After Plant Shutdown)
- ML20097C107 + (Rev 2 to Proposed Tech Specs for Michigan State Univ Triga Reactor)
- ML20149E066 + (Rev 2 to Proposed Tech Specs from 870814 Application for Amend to License DPR-22,changing Plant Organization & Requirements for Senior Reactor Operator Requirements for Mgt & Support Staff)
- ML20101F590 + (Rev 2 to Proposed Ts,Consisting of Change Request 203, Allowing Restart from Current Refueling Outage)
- ML18102A666 + (Rev 2 to Pse&G Simulation Facility Certification Program)
- ML20203L830 + (Rev 2 to Pump & Valve IST Program Plan,2nd Ten-Year Interval, for LaSalle County Nuclear Station.W/158 Oversize Drawings)
- ML20112E388 + (Rev 2 to Pump & Valve Inservice Test Plan)
- ML20236D895 + (Rev 2 to Pump & Valve Inservice Test Plan)
- ML17277B081 + (Rev 2 to Pump & Valve Inservice Test Program plan.W/21 Oversize Drawings.Aperture Cards Are Available in PDR)
- ML20082B873 + (Rev 2 to Pump & Valve Inservice Testing Plan)