Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML043060231 + (Relief Request, Use of a Later Edition of the ASME Section XI Code for the Remainder of the Third 10-year Inspection Interval RR-03-001. TAC No MC2767)
- ML031920148 + (Relief Request, Witholding Information from Public Disclosure,)
- ML063540620 + (Relief Request, from ASME ISI Requirements RPV Welds - 1-ISI-21)
- ML12325A612 + (Relief Request-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (Safety Injection-837) for Fifth 10-Year Inservice Inspection Program)
- ML13191A930 + (Relief Request-08 from ASME Code Root Mean Square Error Value for the Fifth 10-Year Inservice Inspection Program Plan)
- ML12174A018 + (Relief Request-1 for the Fifth 10-Year Interval Inservice Testing Program)
- ML12314A288 + (Relief Request-2 for the Fifth 10-Year Interval Inservice Testing Program Plan)
- ML12181A126 + (Relief Request-4 for the Fifth 10-Year Interval Inservice Inspection Program Plan)
- ML25021A140 + (Relief Request-71: Resubmittal of Relief Request-30)
- LIC-04-0093, Relief Request: Alternative Test Requirements for Containment Repairs + (Relief Request: Alternative Test Requirements for Containment Repairs)
- ML12341A278 + (Relief Request: American Society of Mechanical Engineers (Asme), Code Case N-770-1)
- RBG-47456, Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves + (Relief Request; ASME Code Case OMN-17, Alternative Rules for Testing ASME Class 1 Pressure Relief/Safety Valves)
- RA-24-0290, Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 & 2 Components + (Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 & 2 Components)
- RA-22-0238, Relief Requested in Accordance with 10 CFR 50.55a(z)(2) for Pressurizer Power Operated Relief Valve (PORV) Block Valve 2NC-31 B Inservice Testing + (Relief Requested in Accordance with 10 CFR 50.55a(z)(2) for Pressurizer Power Operated Relief Valve (PORV) Block Valve 2NC-31 B Inservice Testing)
- EPID:L-2020-LLR-0061 + (Relief Requested in Accordance with 10 CFR 50.55a(z)(2) for Pressurizer Power Operated Relief Valve (PORV) Block Valve 2NC-31 B Inservice Testing)
- EPID:L-2020-LLR-0062 + (Relief Requested in Accordance with 10 CFR 50.55a(z)(2) for Pressurizer Power Operated Relief Valve (PORV) Block Valve 2NC-31 B Inservice Testing)
- RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head + (Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head)
- RA-22-0024, Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components + (Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components)
- ML032250432 + (Relief Requests)
- ML15125A361 + (Relief Requests (1-RR-5-7 and 2-RR-5-7) for the Fifth 10-Year Interval for the Inservice Inspection Program)
- ML090680290 + (Relief Requests (RR 31 and RR 32))
- ML022240590 + (Relief Requests (RR) 02-02 and RR 02-03)
- ML042330480 + (Relief Requests (RR) 04-MN-02, 04-MN-03, and 04-MN-04)
- ML100491856 + (Relief Requests - IST Program - RAI - PRR-004, PRR-005, PRR-007, and PRR-010 - ME2552, ME2553, ME2554, ME2559)
- ML052650312 + (Relief Requests - the Previsions of ASME Section XI, IWA-5244, Buried Components, RR-1-26 and RR-2-34)
- ML032721404 + (Relief Requests 02-005 and 02-004)
- ML073100991 + (Relief Requests 07-001-RR and 07-002-RR Regarding Weld Repairs)
- 3F0307-10, Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 0 + (Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 0)
- NL-09-090, Relief Requests 08 and 09 for Fourth Ten-Year Inservice Inspection Interval + (Relief Requests 08 and 09 for Fourth Ten-Year Inservice Inspection Interval)
- ML100640084 + (Relief Requests 09 001 II, 09 002 II, and 09 003 II, Third 10-year Interval Inservice Inspection Program Plan)
- ML060330251 + (Relief Requests 1, 2, and 3 Approval)
- ML15079A002 + (Relief Requests 1-RR-5-2 and 2-RR-5-2 for Fifth 10-Year Interval for the Inservice Inspection Program)
- ML15079A003 + (Relief Requests 1-RR-5-5 and 2-RR-5-5 for Fifth 10-Year Interval for the Inservice Inspection Program)
- ML20079F816 + (Relief Requests 1-TYP-4-C2.21-1 and 1-TYP-4-RA-1 Regarding Weld Examination Coverage for the Fourth Inservice Inspection Interval)
- ML032200460 + (Relief Requests 1/2-ISI-17, 1/2-ISI-18, 1/2-ISI-19, 2-ISI-20, 2-ISI-21 and 2-ISI-22 Associated with Inservice Testing Requirements During Cycle 10)
- ML13071A082 + (Relief Requests 12-ON-001 and 12-ON-002, MF0648 and MF0649, Acceptance Review)
- ML13228A263 + (Relief Requests 12-ON-001 and 12-ON-002, Request for Additional Information Response)
- ML063390103 + (Relief Requests 13R-01 for Alignment of Inservice Inspection and Containment Inservice Inspection)
- ML14321A864 + (Relief Requests 13R-08, Reactor Pressure Vessel (RPV) Interior Attachments and 13R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval)
- ML16055A464 + (Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737))
- ML120790647 + (Relief Requests 13R-20 Regarding Alternative Requirements for Repair of Reactor Vessel Head Penetrations)
- PLA-5805, Relief Requests 1RR05 and 2RR05 for Third Ten-year Interval Inservice Testing Program Plans for Susquehanna Ses Units 1&2 + (Relief Requests 1RR05 and 2RR05 for Third Ten-year Interval Inservice Testing Program Plans for Susquehanna Ses Units 1&2)
- PLA-5960, Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans + (Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans)
- PLA-7065, Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Programs Plans + (Relief Requests 1RR07 and 2RR07 for Third Ten-Year Interval Inservice Testing Programs Plans)
- ML20080J789 + (Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval)
- ML20206K865 + (Relief Requests 2-TYP-4-RV-06 and 2-TYP-4-RV-07 from the Requirements of the ASME Code (EPID L-2020-LLR-0053 and EPID L-2020-LLR-0054 (COVID-19)))
- ML031470003 + (Relief Requests 23 and 33 Regarding Sleeved full-nozzle Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal)
- ML030500349 + (Relief Requests 3 and 6 for Fourth 10-Year Interval of Inservice Inspection Examination Plan)
- ML22262A314 + (Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code)
- ML111100996 + (Relief Requests 4216, 4217, 4218, 4219, 4220, and 4222 for Inservice Inspection Program Relief Regarding Examination Coverage for the Second 10-Year Inservice Inspection Interval)
- ML15098A478 + (Relief Requests 4RR-01: Use of a Risk-Informed Inservice Inspection Alternative for the Fourth 10-Year Inservice Inspection Interval)