UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 17. 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 SUB"IECT:
CLINTON POWER STATION, UNIT NO.1 - RELIEF REQUESTS (RRs) 4216, 4217,4218,4219,4220,4221, AND 4222 REGARDING EXAMINATION COVERAGE FOR THE SECOND 10-YEAR INSERVICE INSPECTION (lSI)
INTERVAL (TAC NOS. ME4183, ME4184, ME4185, ME4186, ME4187, ME4188 AND ME4189)
Dear Mr. Pacilio:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated July 1, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101870190), as supplemented by letter dated February 1, 2011 (ADAMS Accession No. ML110320387), Exelon Generation Company, LLC (EGC, the licensee), submitted RRs 4216, 4217,4218,4219,4220, 4221, and 4222 for the second 10-year lSI interval for the Clinton Power Station (CPS),
Unit NO.1. The reliefs requested approval to use proposed alternatives to the 1989 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),
Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," with no addenda on the basis that compliance with the speCified examination coverage requirements is impractical due to the CPS design.
The details of the NRC staff review is included in the enclosed safety evaluation. The NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations, Section 50.55a(g)(6)(i).
Therefore, the NRC staff grants relief for the examinations of the components contained in the RRs for CPS for the second 10-year lSI.
Sincerely,
- .1 W£.-:,
ob I. Z' merman, Chief lant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
,-V'R REGU/
- UNITED STATES
.;:,V
~
0.,.
NUCLEAR REGULATORY COMMISSION
,L WASHINGTON, D.C. 20555-0001 j..;
Of 0
~
CI>
~
~
~
~
+')
..,0
- -i' SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ON THE SECOND 10-YEAR INTERVAL INSPECTION PROGRAM RELIEF REQUESTS 4216,4217,4218,4219,4220,4221, AND 4222 EXELON GENERATION COMPANY, LLC CLINTON POWER STATION, UNIT NO.1 DOCKET NO. 50-461
1.0 INTRODUCTION
By letter to the U.S. Nuclear Regulatory Commission (NRC, the Commission) dated July 1, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101870190), as supplemented by letter dated February 1,2011 (ADAMS Accession No. ML110320387), Exelon Generation Company, LLC (EGC, the licensee), submitted relief requests (RRs) 4216, 4217, 4218,4219,4220,4221, and 4222 for the second 10-year Inservice Inspection (lSI) Interval for the Clinton Power Station (CPS), Unit No.1. The reliefs requested approval to use proposed alternatives to the 1989 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," with no addenda on the basis that compliance with the specified examination coverage requirements is impractical due to the CPS design.
The RRs were requested for the residual heat removal (RHR) pump 'A' casing weld (RHR-A-2),
the reactor pressure vessel (RPV) head-to-flange weld (CH-C-2), the RPV shell-to-f1ange weld (RVP-C5), 20 RPV nozzle-to-shell welds, 10 percent of the peripheral RPV control rod drive housing (CRDH) pressure retaining welds, the piping integrally welded attachments (1-MS-B-1) and (1-MS-D-10), and the reactor core isolation cooling (RCIC) pump (RCIC-1A-(1-4>> integrally welded attachment. All of these welds fall under the requirements of the 1989 Edition of the ASME Code with no addenda. The second 10-year lSI Interval for CPS ended on June 30,2010.
2.0 REGULATORY EVALUATION
Pursuant to Title 10 of the Code ofFederal Regulations (10 CFR), Section 50.55a(g)(4), ASME Code Class 1, 2 and 3, components (including supports) must meet the requirements, except for the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that the lSI of components and system pressure tests conducted during the first 10-year intervals and subsequent intervals to comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, which was incorporated by reference in 10 CFR 50.55a(b),
12-months prior to the start of the 120-month interval. The ASME Code of record for CPS is the 1989 Edition ofthe ASME Code,Section XI, with no addenda. Accordingly, the ASME Code Enclosure
-2 Case N-460, approved unconditionally in Regulatory Guide 1.147, Revision 16, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1," allows that "a reduction in examination coverage for any Class 1 or Class 2 weld may be acceptable provided that the reduction in coverage for that weld is less than 10%."
Section 50.55a(g)(6)(i) of 10 CFR states that "the Commission will evaluate determinations under paragraphs (g)(5) of this section that code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the faCility."
3.0 TECHNICAL EVALUATION
The NRC staff has evaluated the information provided by EGC in support of the request for relief from, or alternative to, the ASME Code requirements and the bases for disposition are documented below.
A number of the subject welds had received examination relief from the NRC staff for the first 10-year lSI interval, specifically, those called out in RRs 4216,4217,4218,4219, and 4222. As a group, these subject welds were examined with at least equal, and mostly greater, degree of coverage in the second 10-year lSI interval than in the first 10-year lSI interval. The licensee indicated in the letter dated February 1, 2011, that all examinations had already been performed for the second 10-year lSI interval.
3.1 Relief Request (RR)-4216: Residual Heat Removal (RHR) Pump "A" Casing Weld (RHR-A-2) 3.1.1 ASME Code Requirement ASME Code,Section XI, Table IWC-2500-1, Item No. C6.10, component examinations require a surface examination of the pump casing welds. The extent of the examination is "100% welds in all components." ASME Code Case N-460 states that 90 percent coverage is adequate to meet the ASME Code requirement.
3.1.2 System/Component for which Relief is Requested The licensee requested relief from examining the required 100 percent inspection coverage of the ASME Code requirements of the RHR pump "An (RHR-A-2) casing weld.
3.1.3 Licensee's Basis for Relief Request The licensee stated that:
A permanently installed instrument line interferes with the surface examination of this weld. To perform a full Code required examination of this weld, the instrument line would have to be cut out to gain access.
-3 3.1.4 Licensee's Proposed Alternative Examination The licensee stated that:
Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from performing the required examination on 100% ofthe examination area. [... ] CPS proposes to perform the surface examination of the accessible area to the maximum extent feasible without removing the permanently installed instrument line, which would be approximately 87% of the required examination area.
3.1.5 NRC Staff Evaluation The ASME Code requirement for the RHR pump "A" casing weld (RHR-A-2) requires a surface examination of "1 00% welds in all components." The ASME Code Case N-460 requires a 90 percent coverage of the examination area. The licensee achieved an approximate coverage of 87 percent of the examination area with no indications. EGC documented the examination obstruction in several diagrams and pictures provided in the submittal and supplemental information response, making clear the impediment to reaching the required surface examination coverage.
The NRC staff concurs that removal of the obstructing instrument line would be impractical and that ultrasonic (UT) examination cannot be used to satisfy the ASME Code requirements. The NRC staff noted that a nearly identical RR was approved for this weld during the first 10-year lSI interval. The NRC staff concludes that, if significant service-induced degradation had occurred, there is reasonable assurance that evidence of degradation would have been detected by examinations performed by the licensee within the examined area. Accordingly, the NRC staff grants relief from further action in examining the RHR pump "A" casing weld (RHR-A-2) for the CPS second 10-year lSI interval.
3.2 Relief Request (RR)-4217: Reactor Pressure Vessel (RPV) Head-to-Flange Weld (CH-C2) 3.2.1 ASME Code Requirement ASME Code,Section XI, Table IW8-2500-1, Item No. 81.40, component examinations require a volumetric and surface examination of the head-to-flange weld. The extent of the examination is "100% of the weld length." ASME Code Case N-460 states that 90 percent coverage is adequate to meet the ASME Code requirement.
3.2.2 System/Component for which Relief is Requested The licensee requested relief from examining the required 100 percent inspection coverage of the ASME Code requirements of the RPV head-to-flange weld (CH-C-2).
- 4 3.2.3 Licensee's Basis for Relief Request The licensee stated:
CPS evaluated to determined if remote auto UT system could be utilized to increase the examination volume. It was concluded that due to the size of the auto UT equipment the examination volume would have been less. [... ] It should be noted that during the initial plant construction, the entire weld was radiographed and the results were acceptable.
The weld was also ultrasonically examined in accordance with the Preservice Inspection Plan, and the results of that examination were also acceptable.
3.2.4 Licensee's Proposed Alternative Examination The licensee stated:
Pursuant to 10 CFR SO.SSa(g)(S)(iii), relief is requested from performing the required examination on 100% of the examination area. [... ] CPS proposes to perform the UT examination from the RPV head side only and perform UT examination on this weld to the maximum extent feasible.
The licensee further stated that the examination as performed achieved a S3.8 percent coverage from 0 to 120 degrees, a 79.S percent coverage from 120 to 240 degrees, and a 84.0 percent coverage from 240 to 360 degrees.
3.2.S
NRC Staff Evaluation
The ASME Code requirement for the subject weld requires a volumetric examination of"1 00%
of the weld length." The subject weld was examined in three segments and the licensee achieved an approximate coverage of 72 percent of the weld length. The NRC staff questioned why the coverage for the subject weld varied so much between the first and subsequent segments. The licensee documented through supplemental information that the low coverage in the 0 to 120 degrees scan (S3.8 percent) was due to the procedures and equipment and techniques capabilities in place during the 2002 inspection. The other two-thirds of the subject weld were inspected in 2006 and 2010 with superior results (79.S percent and 84.0 percent, respectively) due to advancement in both procedures and equipment. Despite the low 2002 coverage, the NRC staff considers that the examination is a significant and representative percentage of the total weld volume and therefore provides reasonable assurance that any service-induced degradation would have been detected by examinations performed to date.
Additionally, the licensee documented the impediment to examination in several diagrams provided in the submittal and supplemental information response, convincingly illustrating the problematic geometry of the subject weld. The NRC staff concurs with the licensee's conclusion that modifying the RPV head-to-flange weld to increase the examination coverage is impractical.
The NRC staff noted that a nearly identical RR was approved for this weld during the first 10-year lSI interval. Accordingly, the NRC staff grants relieffrom further action in examining the RPV head-to-flange weld (CH-C-2) for the CPS second 10-year lSI interval.
-5 3.3 Relief Reguest (RR)-4218: Reactor Pressure Vessel (RPV) Shell-to-Flange Weld (RPV-C5) 3.3.1 ASME Code Requirement ASME Code,Section XI, Table IWB-2500-1, Item No. B1.30, component examinations require a volumetric examination of the RPV shell-to-flange weld. The extent of the examination is "100%
of the weld length." ASME Code Case N-460 states that 90 percent coverage is adequate to meet the ASME Code requirement.
3.3.2 System/Component for which Relief is Requested The licensee requested relief from examining the required 100 percent inspection coverage of the ASME Code requirements of the RPV shell-to-flange weld (RPV-C5).
3.3.3 Licensee's Basis for Relief Request The licensee stated:
CPS evaluated to determine if a remote UT system could be used to increase the examination volume. It was concluded that due to the size of the UT equipment, the examination volume would have been less. [... ] CPS has performed UT examination on this weld to the maximum extent feasible. It should be noted that during initial plant construction, the entire weld was radiographed and the results were acceptable. The weld was also ultrasonically examined in accordance with the Preservice Inspection Plan, and the results of the examination were also acceptable.
3.3.4 Licensee's Proposed Alternative Examination The licensee stated:
Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from performing the required examination on essentially 100% of the examination area. [... ] The RPV Shell Flange configuration/geometry does not allow UT examination form the flange side. CPS proposes to perform the UT examination from the RPV shell side only and perform UT examination on this weld to the maximum extent feasible.
The licensee further stated that the examination as performed achieved a 52 percent coverage from 0 to 180 degrees, and 75 percent coverage from 180 to 360 degrees.
3.3.5
NRC Staff Evaluation
The ASME Code requirement for the subject weld requires a volumetric examination of "100%
of the weld length." The licensee achieved an approximate coverage of 64 percent of the weld length. The subject weld was examined in two segments, and the NRC staff questioned why the coverage for the subject weld varied so much between the segments. The licensee documented through supplemental information that the low coverage in the 0 to 180 degrees
-6 scan (52 percent) was due to the procedures and equipment and technical capabilities in place during the 2002 inspection. The other half of the subject weld was inspected in 2010 with superior results due to advancements in both procedures and equipment (75 percent coverage).
Despite the low 2002 coverage, the NRC staff considers that the examination is a significant and representative percentage of the total weld volume and therefore provides reasonable assurance that any service-induced degradation would have been detected by examinations performed to date.
Additionally, the licensee documented the impediment to examination in several diagrams, provided in the submittal and supplemental information response, convincingly illustrating the problematic geometry of the subject weld. The NRC staff concurs with the licensee's conclusion that modifying the RPV shell-to-flange weld to increase coverage is impractical. The NRC staff noted that a nearly identical RR was approved for this weld during the first 10-year lSI interval.
Accordingly, the NRC staff grants relief from further action in examining the RPV shell-to-flange weld (RPV-C5) for the CPS second 10-year lSI interval.
3.4 Relief Request (RR}-4219: Reactor Pressure Vessel (RPv) Nozzle-to-Shell Welds 3.4.1 ASME Code Requirement ASME Code,Section XI, Table IWB-2500-1, Item No. B3.90, component examinations require a volumetric examination of the nozzle-to-shell welds. The extent of the examination is "all nozzles. n ASME Code Case N-460 effectively states that 90 percent coverage is adequate to meet the ASME Code requirement.
3.4.2 System/Component for which Relief is Requested The licensee requested relief from meeting the required volumetric inspection coverage of the following RPV nozzle-to-shell welds, B3.90 components: N1 B, N2B, N2C, N2D, N2E, N2F, N2G, N3A, N3C, N4A, N4B, N4C, N4D, N5A, N6B, N7, N8, N9A, N10, and N16.
3.4.3 Licensee's Basis for Relief Request The licensee stated:
Code requirement is impractical for the subject components due to nozzle configuration and therefore portions of the Code required examinations volume can not be completely examined with ultrasonic techniques. The curvature of the blend radius of nozzle prevents ultrasonic scanning of the weld from the nozzle side. [... ] Remote auto ultrasonic examinations were performed to the maximum extent practical with no reportable indications.
3.4.4 Licensee's Proposed Alternative Examination The licensee stated:
Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from performing the required examination on essentially 100% of the examination area. [... ] Performance of ultrasonic
-7 examination of the welds to the maximum extent feasible is sufficient for confirming weld integrity and therefore, provides an acceptable level of quality and safety.
The licensee also stated that the examinations performed using remote UT achieved the following coverage:
Component Exam Code Number Coverage Achieved N1B UT 82.7 N2B 81.1
.--+-~
~------
~-
~--
~
N2E UT 81.0 N2F LIT 65.3 N2G UT 65.3 N3A UT 59.0 N3C UT 59.0 N4A UT 65.6 N4B UT 78.5 N4C UT 78.5 N4D UT 65.6
~
~
~~~----------------
N5A UT 56.5
~-~
~
N6B UT 77.9
~-~-~---------------
-~~-.----------------
N9A UT 55.7 N10 UT 84.9 N16 UT 68.1 3.4.5
NRC Staff Evaluation
The ASME Code requirement for the subject welds requires a volumetric examination of "all nozzles," translating to essentially 1 00 percent of each nozzle (90 percent with ASME Code Case N-460). This coverage was not achieved by the licensee in any of the nozzles. Half the nozzle examinations achieved roughly 80 percent coverage, while the other half achieved between 56 percent and 66 percent coverage. The NRC staff questioned why the coverage for the subject welds varied in this manner. The licensee documented through supplemental information that the lower coverage values were achieved with the procedures and equipment and techniques capabilities in place during the 2000 and 2002 inspections. The other half of the subject welds were inspected in 2006 and 2010 with superior results due to advancement in both procedures and equipment. A single outlier, the N8 weld, was examined in 2008 but coverage of only 66 percent was achieved due to curved geometry on one-half of the nozzle. In aggregate, the NRC staff considers that a significant percentage of the total weld volume was examined and that the likelihood that a pattern of degradation was present and unidentified in the weld areas is acceptably low.
-8 Additionally, the licensee documented the impediment to examination in several diagrams, provided in the submittal and supplemental information response, convincingly illustrating the problematic geometry of the subject welds. The NRC staff concurs with the licensee's conclusion that modifying the RPV or nozzle configurations to increase coverage would be impractical. The NRC staff noted that a nearly identical RR was approved for this weld during the first 10-year lSI interval. Accordingly, the NRC staff grants relief from further action in examining the RPV nozzle-to-shell welds for the CPS second 10-year lSI interval.
3.S Relief Request (RR)-4220: Control Rode Drive Housing (CRDH) 10 Percent of Peripheral Reactor Pressure Vessel (RPV) Pressure Retaining Welds 3.S.1 ASME Code Requirement ASME Code,Section XI, Table IWB-2S00-1, Item No. B14.10, component examinations require a surface or volumetric examination of 10 percent of the peripheral CRDH pressure retaining welds.
3.S.2 System/Component for which Relief is Requested The licensee requested relief from examining the required 10 percent inspection coverage for the ASME Code requirements of the CRDH pressure retaining welds.
3.S.3 Licensee's Basis for Relief Request The licensee stated:
There are two (2) welds on each CRDH, CRDH-2 (flange to pipe refer to lower weld) and CRDH-3 (pipe to pipe refers to upper weld). Upper welds are accessible and examined 100%. Lower welds are partially accessible and could be examined only SO%.
Limited access to all forty (40) lower welds on peripheral CRDH are due to inherent obstructions caused by surrounding cables, tubing, and permanent foundation beams, which are not practical to remove or replace.
3.S.4 Licensee's Proposed Alternative Examination The licensee stated:
Pursuant to 10 CFR SO.SSa(g)(S)(iii), relief is requested from performing the required examination on 100% ofthe examination area. [... ] Clinton Power Station is proposing to examine four welds completely 100% and 10 more welds partially, such that the aggregate total is greater than or equal to full examination coverage (Le., 720 total percentage points). [... ] Completely examining four (4) upper welds and partially examining on ten (10) lower welds (total of 900 percentage points) will essentially meet the Code requirements.
The licensee further stated that the examination as performed achieved a 100 percent coverage on four upper welds, and a SO percent coverage on the 10 lower welds, for a total of 900 percentage points.
-9 3.5.5
NRC Staff Evaluation
The ASME Code requirement for the subject welds requires a surface or volumetric examination of 10 percent of the peripheral CRDH pressure retaining welds, including functionally 100 percent of each CRDH upper and lower weld chosen for the sampling. The licensee achieved 100 percent coverage for all upper welds examined, but only 50 percent for lower welds. The licensee attempted to compensate by inspecting additional upper welds to achieve an overall weld coverage percentage greater than 10 percent of the CRDH pressure retaining weld volume.
The licensee demonstrated the difficulties inherent in conducting surface examinations of the peripheral CRDH welds, in particular, the lower welds. The NRC staff concurs that access to the lower welds is severely limited by obstructions. In addition, the NRC staff concurs with the licensee's conclusion that modifying these obstructions is impractical. The examination of extra upper weld material by CPS provides acceptable reassurance that any generic degradation mechanisms would have been detected in the examined surfaces. Accordingly, the NRC staff grants relief from further action in examining the CRDH pressure retaining welds for the CPS second 10-year lSI interval.
3.6 Relief Request (RR)-4221: Piping Integrally Welded Attachments (1-MS-B-11) and (1-MS-D-10) 3.6.1 ASME Code Requirement ASME Code,Section XI, Table IWB-2500-1, Item No. B10.20, component examinations require a surface or volumetric examination "as applicable" for essentially 100 percent of the pump integrally welded attachments.
3.6.2 System/Component for which Relief is Requested The licensee requested relief from examining the required 100 percent inspection coverage for the ASME Code requirements of the of the piping integrally welded attachments (1-MS-B-11) and (1-MS-D-10).
3.6.3 Licensee's Basis for Relief Request The licensee stated:
This is a containment penetration fitting to the main steam Class 1 piping integrally welded attachment. Weld located outside the containment penetration is accessible and examined. However, weld located inside the containment penetration is not accessible and not examined. Code required surface examination coverage is impractical due to the component configuration and accessibility to the required examination surface. [... ]
In order to examine the inaccessible weld Clinton Power Station (CPS) would have to cut out this containment penetration weld.
-10 3.6.4 Licensee's Proposed Alternative Examination The licensee stated:
Pursuant to 10 CFR SO.SSa(g)(S)(iii), relief is requested from performing the required examination on 100% of the examination area. [... ] Based on the current UT procedures, mockups, and calibration standard, UT examination can not be demonstrated or qualified to the satisfaction of the ASME Code requirements to produce meaningful and reliable results.
The licensee further stated that the examination as performed achieved SO percent coverage due to the obstruction.
3.6.S NRC Staff Evaluation The ASME Code requirement for the subject welds requires a volumetric examination of 100 percent of the subject welds. The licensee was able to examine the portion of the welds exterior to the containment penetration. The licensee provided a visual and textual synopsis of the difficulties inherent in conducting surface examinations of the subject welds. The obstruction of the weld volume located inside the containment penetration by the containment wall and associated structures is a clear hindrance to any examination due to lack of clearance inside containment penetrations.
The NRC staff concurs with the licensee's conclusion that cutting out the containment penetration weld to examine it is impractical. The NRC staff noted that a nearly identical RR was submitted and approved for a similar case. The NRC staff also concludes that, if Significant service-induced degradation had occurred, there is reasonable assurance that evidence of degradation would have been detected by examinations performed by the licensee within the examined area. Accordingly, the NRC staff grants relief from further action in examining the piping integrally welded attachments welds (1-MS-B1) and (1-MS-D-10) for the CPS second 10-year lSI interval.
3.7 Relief Request (RR)-4222: Reactor Core Isolation Cooling (RCIC) Pump (RCIC-1A(1-4))
Integrally Welded Attachment 3.7.1 ASME Code Requirement ASME Code,Section XI, Table IWC-2S00-1, Item No. C3.30, component examinations require a surface examination of 100 percent of the "required areas" of pump integrally welded attachments.
3.7.2 System/Component for which Relief is Requested The licensee requested relief from examining the required 100 percent inspection coverage for the ASME Code requirements of the RCIC pump (RCIC-1A(1-4>> integrally welded attachment.
- 11 3.7.3 Licensee's Basis for Relief Request The licensee stated:
There are four (4) welds identical lugs (Le., integral attachments) welded to the Reactor Core Isolation Cooling (RCIC) system which are utilized to mount the pump to its pedestal. Once the pump is installed, the lower side of the weld on either side of the four lugs is inaccessible for examination. [... ]
In order to perform the examination on the lower side of the lugs, the pump would have to be removed from the pedestal. This would require disconnecting the welded piping from the pump, re-installing the pump on pedestal, reconnecting the piping by welding, and verifying that everything is installed properly and meets design requirements.
The licensee also stated that the significant welding work would result in unnecessary radiation exposure (estimated to be approximately 2 person-rem) of dose.
3.7.4 Licensee's Proposed Alternative Examination The licensee stated:
Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from performing the required examination on 100% of the examination area. [... ] [CPS proposes to]
perform the surface examination of the accessible area to the maximum extent feasible.
The licensee further stated that the examination as performed achieved 84 percent coverage.
3.7.5
NRC Staff Evaluation
The ASME Code requirement for the subject weld requires a surface examination of 100 percent of the 'required areas' of the subject weld (illustrated in Figure IWC-2500-5 of the ASME Code). The licensee achieved an approximate coverage of 84 percent. The licensee RR demonstrated the difficulties inherent in conducting surface examinations of the subject weld.
The obstruction of the lower weld surface due to the pump installation is a clear hindrance to any examination.
The NRC staff noted that a nearly identical RR was approved for this weld during the first 10-year lSI interval. The NRC staff considers it unlikely that any degradation would be visible in the inaccessible lower portion of the weld and not in the examined portion and that therefore the examination provides reasonable assurance of the material integrity of the subject weld.
Accordingly, the NRC staff grants relief from further action in examining the RCIC pump (RCIC-1A(1-4>> integrally welded attachment for the CPS second 10-year lSI interval.
4.0 CONCLUSION
Due to a variety of configurational issues at CPS, the ASME Code requirements with respect to the subject welds are impractical. The weld coverages achieved, provided reasonable assurance of the structural integrity of the subject welds. The NRC staff has determined that
-12 granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life, or property, or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed. Therefore, the licensee's requests for relief are granted pursuant to 10 CFR 50.55a(g)(6)(i) for the CPS second 10-year lSI interval.
All other ASME Code,Section XI, requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Dan Widrevitz Date of issuance: June 17, 2011
ML110320387), Exelon Generation Company, LLC (EGC, the licensee), submitted RRs 4216,4217,4218,4219,4220, 4221, and 4222 for the second 10-year lSI interval for the Clinton Power Station (CPS),
Unit No.1. The reliefs requested approval to use proposed alternatives to the 1989 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),
Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," with no addenda on the basis that compliance with the specified examination coverage requirements is impractical due to the CPS design.
The details of the NRC staff review is included in the enclosed safety evaluation. The NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations, Section 50.55a(g)(6){i).
Therefore, the NRC staff grants relief for the examinations of the components contained in the RRs for CPS for the second 10-year lSI.
Sincerely, IRA!
Jacob I. Zimmerman, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosures:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3*2 RlF RidsNrrDor1Lpl3-2 Resource RidsNrrPMClinton ResourceRidsNrrSRohrer Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDor1Dpr Resource RidsAcrsAcnw_MailCenter Resource DWidrevitz, NRR ADAMS Accession No' ML111100996 "Via SE Memo OFFICE LPL3*21PM LPL3-21PM LPL3-21LA DCIICVlBlBC*
LPL3-21BC NAME ABiliochCol6n NDiFrancesco SRohrer MMitchell JZimmerrnan DATE 6115/11 6/15111 6/15111 3115111 6117111