Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19321A096 + (Refs EIS & Requests Info Re Positive & Negative Effects of Using Other Decontaminating Agents That Might Not Contribute to Increased Radionuclide Mobility)
- ML13326A136 + (Refs Licensee Forwarding Scope & Objectives for Plant Annual Emergency Plan Exercise Scheduled for 930915. Concludes That Exercise Scope & Objectives Consistent W/ Emergency Plan Goals & Requirements)
- ML20070E633 + (Refs Westinghouse in Response to RA Clark 821108 Request for ECCS Evaluation Model Addressing Two Loop Upper Plenum Injection Plants.Calculations for Worst Case Large Break & Sensitivity Studies Will Be Submitted by 830225)
- ML021140225 + (Refuel 13, April 8, 2002 Pre-Outage Presentation)
- ML20149J458 + (Refuel 2 Inservice Insp Rept for 860419-871115)
- RA-19-0391, Refuel 23 (C2R23) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report + (Refuel 23 (C2R23) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report)
- RA-19-0092, Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report + (Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report)
- EPID:L-2019-LRO-0015 + (Refuel 24 (C1R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report)
- RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections + (Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections)
- RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report + (Refuel 25 (C2R25) Inservice Inspection (ISI) Report)
- RA-22-0021, Refuel 26 (C1 R26) Inservice Inspection (ISI) Report + (Refuel 26 (C1 R26) Inservice Inspection (ISI) Report)
- RA-24-0208, Refuel 26 (C2R26) Inservice Inspection (ISI) Report + (Refuel 26 (C2R26) Inservice Inspection (ISI) Report)
- RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report + (Refuel 27 (C1 R27) Inservice Inspection (ISI) Report)
- ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval + (Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval)
- RA-18-0138, Refuel 29 (03R29) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval + (Refuel 29 (03R29) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval)
- EPID:L-2018-LRO-0030 + (Refuel 29 (03R29) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval)
- RA-25-007, Refuel 29 (M2R29) Inservice Inspection (ISI) Report + (Refuel 29 (M2R29) Inservice Inspection (ISI) Report)
- RA-19-0394, Refuel 29 (O2R29) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval + (Refuel 29 (O2R29) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval)
- EPID:L-2020-LRO-0005 + (Refuel 29 (O2R29) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval)
- RA-25-0176, Refuel 30 (M1 R30) Inservice Inspection (ISI) Report + (Refuel 30 (M1 R30) Inservice Inspection (ISI) Report)
- RA-22-0066, Refuel 30 (O2R30) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval + (Refuel 30 (O2R30) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval)
- RA-22-0123, Refuel 30 (O2R30) Steam Generator Tube Inspection Report + (Refuel 30 (O2R30) Steam Generator Tube Inspection Report)
- EPID:L-2022-LRO-0069 + (Refuel 30 (O2R30) Steam Generator Tube Inspection Report)
- RA-19-0396, Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval + (Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval)
- EPID:L-2021-LRO-0002 + (Refuel 31 (O1R31) Inservice Inspection (ISI) and Steam Generator Inservice Inspection (SG-ISI) Reports, Fifth 10-Year ISI Interval)
- RA-22-0255, Refuel 31 (O3R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval + (Refuel 31 (O3R31) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval)
- RA-22-0334, Refuel 31 (O3R31) Steam Generator Tube Inspection Report + (Refuel 31 (O3R31) Steam Generator Tube Inspection Report)
- EPID:L-2022-LRO-0152 + (Refuel 31 (O3R31) Steam Generator Tube Inspection Report)
- RA-19-0094, Refuel 31 (R231) Owners Activity Report, Fifth 10-Year Inservice Inspection Interval + (Refuel 31 (R231) Owners Activity Report, Fifth 10-Year Inservice Inspection Interval)
- RA-23-0052, Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval + (Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval)
- RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report + (Refuel 32 (O1R32) Steam Generator Tube Inspection Report)
- EPID:L-2023-LRO-0037 + (Refuel 32 (O1R32) Steam Generator Tube Inspection Report)
- RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owners Activity Report + (Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owners Activity Report)
- RA-25-0088, Refuel 33 (O1R33) Steam Generator Tube Inspection Report + (Refuel 33 (O1R33) Steam Generator Tube Inspection Report)
- RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owners Activity Report and Analytical Evaluations + (Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owners Activity Report and Analytical Evaluations)
- RA-25-0017, Refuel 34 (R2R34) Inservice Inspection Program Owners Activity Report + (Refuel 34 (R2R34) Inservice Inspection Program Owners Activity Report)
- ML20063L080 + (Refuel 6 ISI Summary Rept)
- ML20087F402 + (Refuel 7 ISI Summary Rept)
- TSTF-232 + (Refuel Equipment Interlocks Applicability Change)
- ENS 43753 + (Refuel Floor Exhaust Hi-Hi Radiation Alarms During Reactor Reassembly)
- 05000388/FIN-2016004-03 + (Refuel Floor Radiation Monitor Inoperable Due to being Improperly Calibrated)
- ML051470077 + (Refuel Outage 1R28 Resident Inspector Coverage)
- ML20248B860 + (Refuel Outage 7 Inservice Insp Exam Summary Rept)
- ML20078F186 + (Refuel Outage B1R05 RHR HX Nozzles Ultrasonic Indication Summary)
- ML20031A745 + (Refuel/Maint Outage Final Rept,1980)
- ML20266H580 + (Refueling & Drywell Seal Bellows for Primary Containment)
- ML19095A366 + (Refueling & Spent Fuel Storage Information & Monthly Operating Report for May 1978)
- ML051020397 + (Refueling 10, Outage (U3R10) Steam Generator Tube Inspection Request for Additional Information (RAI) Response)
- NRC-2007-0011, Refueling 28 Steam Generator Examination Report + (Refueling 28 Steam Generator Examination Report)
- NRC 2010-0050, Refueling 32 Analytical Evaluation Report for the Reactor Vessel + (Refueling 32 Analytical Evaluation Report for the Reactor Vessel)
- NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report + (Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report)
- ML19031A495 + (Refueling Accident Inside Containment No. 2 Unit. Responds to Letter Dated March 16, 1977 Which Requested That PSEG Provide an Evaluation of Potential Consequences of a Refueling Accident)