Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML092300520 + (RAI, License Amendment Request Regarding Correction to TS Table 3.7-1 Operator Action 3.b)
- ML13122A219 + (RAI, License Amendment Request Regarding Atmospheric Relative Concentration Values for Use in Control Room Envelope Radiological Dose Analysis)
- ML040140041 + (RAI, License Amendment Request Relating to the Control Room Emergency Air Treatment System Modification)
- ML063330215 + (RAI, License Amendment Request for Application of the Alternate Source Term Methodology)
- ML041340003 + (RAI, License Amendment Request for Technical Specification Tables 3.2.1 and 3.2.4)
- ML041380415 + (RAI, License Amendment Request to Delete Surveillance Requirements for Power Range, Intermediate Range, and Source Range Neutron Flux Monitors)
- ML020720735 + (RAI, License Amendment Request to Extend the Allowed Outage Time for a Division I or Division II Emergency Diesel Generator (Tac No. MB3041))
- ML051440846 + (RAI, License Amendment Request to Revise Cooper Specifications to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation)
- ML093560104 + (RAI, License Amendment Request to Revise Technical Specification 3.4.12, Reactor Coolant System Specific Activity. (TSTF-490-A, E-Bar))
- ML092310748 + (RAI, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit)
- ML042990452 + (RAI, License Amendment Request to Use Alternate Decay Heat Removal in Mode 6 Refueling)
- ML101110635 + (RAI, License Amendment Request, Approval of Final Safety Analysis Report Change for Leak-Before-Break of the Pressurizer Surge Line)
- ML030640867 + (RAI, License Amendment for Power Uprate)
- ML092020012 + (RAI, License Renewal Application)
- ML041830088 + (RAI, License Renewal Application)
- ML042470393 + (RAI, License Renewal Application)
- ML042110308 + (RAI, License Renewal Application)
- ML061720212 + (RAI, License Renewal Application)
- ML042930422 + (RAI, License Renewal Application)
- ML041400073 + (RAI, License Renewal Application Dated 10/31/2003)
- ML041280554 + (RAI, License Renewal Application, Section 3.3 Auxiliary Systems)
- ML051180405 + (RAI, License Transfer Application)
- ML030030863 + (RAI, Licensee Identified Material Wastage)
- ML051050484 + (RAI, Licensing Basis for Control of Heavy Loads)
- ML040700295 + (RAI, Limiting Conditions for Operations, Increase Completion Time)
- ML062200308 + (RAI, Liquid Control Pumps)
- ML031960668 + (RAI, Low Pressurizer Pressure Safety Injection Setpoint)
- ML051320083 + (RAI, MC5750, RR II-09 and RR II-10)
- ML081060148 + (RAI, MD7420- Draft - Request for Additional Information)
- ML040780982 + (RAI, Main Steam Tunnel Temperature)
- ML032870520 + (RAI, Measurement Uncertainty Recapture Power Uprate)
- ML023430208 + (RAI, Minimum Critical Power Ratio Safety Limits & Reference Changes)
- ML040490683 + (RAI, Mixed Oxide Lead Fuel Assemblies)
- ML042430027 + (RAI, Modify Technical Specification 2.3.(4))
- ML040720002 + (RAI, NDE Examination of RPV Nozzle-to-Vessel Welds and Nozzle Blend Radii)
- ML042540171 + (RAI, NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized- Water Reactors)
- ML042470354 + (RAI, NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors)
- ML042740719 + (RAI, NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication Connections at Pressurized-Water Reactors)
- ML060260259 + (RAI, Nominal Trip Setpoints)
- ML051260464 + (RAI, Normal Trip Setpoints Using Revised Method 3 (Tac No. MC4408, MC4409) (TVA-SQN-TS-02-01))
- ML003674398 + (RAI, On-site Fuel Storage Requirements for the Emergency Diesel Generators)
- ML042310442 + (RAI, One-Cycle Steam Generator (SG) Tube Inspection Criteria Using Westinghouse W* Methodology)
- ML021370595 + (RAI, One-Time Extension of Containment Integrated Leakage Rate Test Frequency)
- ML040200750 + (RAI, One-Time Extension of Steam Generator Tube Inservice Inspection Interval)
- ML042400161 + (RAI, One-time Extension of Diesel Generator Allowed Outage Time)
- ML061070154 + (RAI, One-time Extension of the Integrate Leakage Rate Test)
- ML062220537 + (RAI, Oscillation Power Range Monitor (TS-443))
- ML042780222 + (RAI, Oscillation Power Range Monitors)
- ML042110326 + (RAI, Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan)
- ML042110390 + (RAI, Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan)
- ML042110182 + (RAI, Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan)