RAI, NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication Connections at Pressurized-Water Reactors
ML042740719
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/01/2004
From: Chandu Patel
NRC/NRR/DLPM/LPD2
To: Scarola J
Carolina Power & Light Co
Patel C P, NRR/DLPM, 415-3025
References
BL-04-001
Download: ML042740719 (4)


Text

October 1, 2004 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING NRC BULLETIN 2004-01, INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED-WATER REACTORS

Dear Mr. Scarola:

The Nuclear Regulatory Commission (NRC) staff has reviewed and evaluated your response dated July 27, 2004, to NRC Bulletin 2004-01, 60-day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). We have determined that more information is needed to complete our review. Our Request for Additional Information (RAI) for HNP is enclosed. We request that you to respond to the RAI within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-3025.

Sincerely,

/RA/

Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

RAI cc w/enclosure:

See next page

ML042740719 Nrr-088 OFFICE PM:PDII/S2 LA:PDII/S2 SC:PDII/S2 SC:EMCB NAME CPatel EDunnington MMarshall SCoffin DATE 9/27/04 9/24/04 10/01/04 9/27/04 COPY Yes/No Yes/No Yes/No Yes/No

REQUEST FOR ADDITIONAL INFORMATION FOR NRC BULLETIN 2004-01 RESPONSE Shearon Harris Nuclear Power Plant, Unit 1 Carolina Power & Light Company Docket No. 50-400 The NRC staff has completed its review of your response dated July 27, 2004, to NRC Bulletin 2004-01, 60-day Response to NRC Bulletin 2004-01 for the Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. Based on the NRC staffs review, please provide a supplemental response that addresses the following question.

Your response to Bulletin 2004-01 Question (1)(c) did not clearly communicate your intentions with respect to ensuring that an appropriate dialogue would be established with NRC technical staff in the event that circumferential primary water stress corrosion cracking (PWSCC) is identified at any locations covered under the scope of Bulletin 2004-01. The NRC staff addressed this issue, in part, on page 5 of Bulletin 2004-01 stating,... the NRC staff believes that the topic of NDE scope expansion should be discussed with the NRC if circumferential PWSCC is observed in either the pressure boundary or non-pressure boundary portions of any locations covered under the scope of this bulletin to ensure that the licensee has performed an adequate extent-of-condition evaluation.

Because of the potential plant-specific and generic significance of circumferential PWSCC at locations covered under the scope of Bulletin 2004-01, it is the NRC staffs position that cognizant members of the Office of Nuclear Reactor Regulations Materials and Chemical Engineering Branch (EMCB) should be promptly made aware of any emerging issue regarding this degradation phenomena at your facility.

This is important not only for the reason cited in the passage above from Bulletin 2004-01, but also so that the NRC staff can evaluate any such information and fulfill its obligation to inform other U.S. nuclear power plant licensees of new operational experience that may be relevant to the continued safe operation of their facilities.

It is the NRC staffs expectation that if you obtain inspection results in the future that indicate that circumferential PWSCC may be occurring at any location covered under the scope of Bulletin 2004-01, you should contact your NRC Headquarters Project Manager (PM) and request a teleconference or meeting with EMCB technical staff. Notification of your NRC PM should allow ample time for you to incorporate any insights from the aforementioned teleconference or meeting into your plans for evaluating the extent of condition at your facility prior to the end of the outage during which the degradation was discovered.

In order to document your intent to follow the guidance provided above, please provide a supplement to your Bulletin 2004-01 item (1)(c) response that states:

If circumferential cracking is observed in either the pressure boundary or non-pressure boundary portions of any locations covered under the scope of this bulletin, [we] will develop plans to perform an adequate extent-of-condition evaluation and [we] will discuss those plans with cognizant NRC technical staff prior to restarting the affected unit.

Enclosure

Mr. James Scarola Shearon Harris Nuclear Power Plant Carolina Power & Light Company Unit 1 cc:

Steven R. Carr Associate General Counsel - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Resident Inspector/ Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Chris L. Burton Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Benjamin C. Waldrep Plant General Manager Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165 Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.

Washington, DC 20037-1128 Mr. Robert J. Duncan II Director of Site Operations Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Mr. Terry C. Morton, Manager Support Services Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. John R. Caves, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165