ML042110326
| ML042110326 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/23/2004 |
| From: | Chernoff M NRC/NRR/DLPM |
| To: | Harris N TXU Generation Co, LP |
| Chernoff, M H, NRR/DLPM, 301-415-4041 | |
| References | |
| TAC MC2906, TAC MC2907 | |
| Download: ML042110326 (3) | |
Text
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties July 23, 2004 Mr. Neil Harris TXU Generation Company Comanche Peak Steam Electric Station, Units 1 and 2 FM56 5 Miles North of Glen Rose Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: PHYSICAL SECURITY PLAN, SECTION 9.4.1 AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS.
Dear Mr. Harris:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Comanche Peak Steam Electric Station, Units 1 and 2.
The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt. If circumstances result in the need to revise the target response date, please contact me at (301)415-1952.
Sincerely,
/RA/
Margaret Chernoff, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
Enclosure:
As stated cc w/o encl: See next page NOTICE: The Enclosure contains Safeguards Information. Upon separation from the Enclosure, this letter is DECONTROLLED.
July 23, 2004 Mr. Neil Harris TXU Generation Company Comanche Peak Steam Electric Station, Units 1 and 2 FM56 5 Miles North of Glen Rose Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: PHYSICAL SECURITY PLAN, SECTION 9.4.1 AND SAFEGUARDS CONTINGENCY PLAN (TAC NOS.
Dear Mr. Harris:
In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for Comanche Peak Steam Electric Station, Units 1 and 2.
The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Physical Security Plan, Section 9.4.1 and Safeguards Contingency Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt. If circumstances result in the need to revise the target response date, please contact me at (301)415-1952.
Sincerely,
/RA/
Margaret Chernoff, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-445 and 50-446
Enclosure:
As stated cc w/o encl: See next page DISTRIBUTION:
SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS M. Thadani R. Gramm H. Berkow A. Howell, RIV ADAMS Accession Number: ML042110326 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME MChernoff CHawes JPeralta JNakoski DATE 7/23/04 7/20/04 7/23/04 7/23/04 OFFICIAL RECORD COPY
June 2004 Comanche Peak Steam Electric Station cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 2159 Glen Rose, TX 76403-2159 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. Fred W. Madden Regulatory Affairs Manager TXU Generation Company LP P. O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq.
Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004 County Judge P. O. Box 851 Glen Rose, TX 76043 Environmental and Natural Resources Policy Director Office of the Governor P. O. Box 12428 Austin, TX 78711-3189 Mr. Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P. O. Box 13087 Austin, TX 78711-3087 Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Program P. O. Box 12157 Austin, TX 78711 Mr. M. R. Blevins Senior Vice President
& Principal Nuclear Officer TXU Energy ATTN: Regulatory Affairs P. O. Box 1002 Glen Rose, TX 76043