Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML110610741 + (R.E Ginna, Response to Request for Additional Information Regarding Relief Request ISI-04, Alternate Depth Sizing Qualification)
- ML18143A956 + (R.E Ginna, Unit 1, Letter Refering to June 02, 1975 Letter Concerning Main Steam Isolation Valves (Msivs))
- ML12227A569 + (R.E. Fitzpatrick Nuclear Power Plant - Acceptance Review for Amendment Request for Approval of Cyber Security Plan Implementation Schedule)
- 05000244/LER-2018-001, R.E. Gina Nuclear Power Plant Regarding Leakage in Reactor Coolant System Pressure Boundary Through an Existing Weld in Original Installation Equipment Due to Orifice Wear/Erosion Resulting in Progressively Increasing System + (R.E. Gina Nuclear Power Plant Regarding Leakage in Reactor Coolant System Pressure Boundary Through an Existing Weld in Original Installation Equipment Due to Orifice Wear/Erosion Resulting in Progressively Increasing System .)
- ML13066A171 + (R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events)
- NRC-2015-0249, R.E. Ginna Nuclear Power Plant - Final Environmental Assessment Fonsi for Preemption Authority Request (CAC No. MF2618 and MF2623) + (R.E. Ginna Nuclear Power Plant - Final Environmental Assessment Fonsi for Preemption Authority Request (CAC No. MF2618 and MF2623))
- NRC-2013-0252, R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment + (R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment)
- ML16328A088 + (R.E. Ginna Nuclear Power Plant - Problem Identification and Resolution Sample Inspection Report 05000244/2016405 (Cover Letter Only))
- IR 05000244/2016405 + (R.E. Ginna Nuclear Power Plant - Problem Identification and Resolution Sample Inspection Report 05000244/2016405 (Cover Letter Only))
- ML22108A248 + (R.E.. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes)
- EPID:L-2022-LLA-0057 + (R.E.. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes)
- ML040680907 + (R.E.Ginna - Application for Technical Specification Change Regarding Mode Change Limitations)
- ML051260236 + (R.E.Ginna - License Application Request Regarding Main Feedwater Isolation Valves)
- ML20092M768 + (R.E.Ginna - Withdrawal of Requested Alternative to Supplemental Valve Position Indication Testing Frequency)
- ML110880297 + (R.E.Ginna Nuclear Power Plant, Request for Additional Information Fourth Interval Inservice Inspection Program Relief Requests Nos. ISI-02 and ISI-03 (ME5248 & ME5249))
- ML16292A449 + (R.E.Ginna, Three Mile Island-License Amendment Request to Revise Technical Specification Requirements for Inservice Testing Program(Cac Nos. MF8238-MF8256))
- ML072600127 + (R.Thomson-FEMA Ltr to A. Feeney-NY State Emergency Management Office Dated 09/12/07 Regarding Indian Point Alert and Notification System)
- ML20125E310 + (R0 2-80-1/1P:on 800103,drywell Ventilation Isolation Valve Was Fully Open at Time When Valve Should Have Been Limited to 37 Degree Opening.Caused by Lack of Proper Control to Maintain Valve at Less than 37 Degree Opening)
- GO2-16-021, R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report + (R02 15-5462, Revision a, Expedited Seismic Evaluation Process (ESEP) Report)
- ML25071A310 + (R06063 - Final Completion Review Report)
- ML24276A049 + (R06063 Termination Request)
- ML020600485 + (R09 Steam Generator Tube Special Report)
- ML20052B407 + (R0:on 811201-820307,reactor Operated Under Supervision of Senior Reactor Operator W/License That Expired 811201.Caused by Operator Oversight.Reactor Operating Under Supervision of Other Operator.Renewal Application for License Submitted)
- ML051260275 + (R1-17 and R1-31 Draft RAIs)
- L-03-157, R10 Steam Generator Tube Plug Special Report + (R10 Steam Generator Tube Plug Special Report)
- L-05-076, R11 Steam Generator C-3 Report + (R11 Steam Generator C-3 Report)
- L-05-083, R11 Steam Generator Tube Plug Special Report + (R11 Steam Generator Tube Plug Special Report)
- NL-10-1252, R14 Inservice Inspection Summary Report + (R14 Inservice Inspection Summary Report)
- L-03-059, R15 Steam Generator C-3 Report + (R15 Steam Generator C-3 Report)
- L-03-067, R15 Steam Generator Tube Plug Special Report + (R15 Steam Generator Tube Plug Special Report)
- ML13184A269 + (R16 Inservice Inspection Report Summary)
- ML14224A575 + (R17 Steam Generator F* (F Star) Report)
- NL-14-1081, R18 Inservice Inspection Report Summary + (R18 Inservice Inspection Report Summary)
- ML24159A270 + (R1900-0024-001, Rev. 16, NFPA 805 Nuclear Safety Capability Assessment)
- ML22340A213 + (R1900-0024-001, Revision 13, NFPA 805 Nuclear Safety Capability Assessment)
- ML16154A030 + (R2.1 Seismic -- PVNGS Data Request and Draft Request for Additional Information)
- NL-19-0204, R21 Steam Generator Tube Inspection Report + (R21 Steam Generator Tube Inspection Report)
- EPID:L-2019-LRO-0079 + (R21 Steam Generator Tube Inspection Report)
- ML22081A147 + (R22 (March 2022) - Steam Generator Tube Inspection Discussion Points 11 March 2022)
- EPID:L-2022-NFO-0000 + (R22 (March 2022) - Steam Generator Tube Inspection Discussion Points 11 March 2022)
- ML052020002 + (R23 Outage Slide - NRC Category C-3 Phone Call and NRC Discussion Points May 17, 2005)
- ML061440363 + (RA 06-076, Response to Kaplowitz Regarding Indian Point)
- ML061350046 + (RA 06-078, NRC Response to V. Fox Regarding Concerns Raised at 3/28/06 Indian Point Meeting)
- ML061630290 + (RA 06-080, NRC Response to S. Shapiro Regarding NRC Definitions of Reasonable Assurance and Adequate Protection)
- ML071910251 + (RA 07-0113 Ltr from Tom Gurdziel to Mr. Collins Dated June 20, 2007 Reference Entergy/Indian Point Performance)
- RA-08-191, RA 08-191, Response to D. Lochbaum Regarding Beaver Valley Generic Letter 2008-01 + (RA 08-191, Response to D. Lochbaum Regarding Beaver Valley Generic Letter 2008-01)
- ML083470023 + (RA 08-191, Response to D. Lochbaum Regarding Beaver Valley Generic Letter 2008-01)
- ML21165A007 + (RA DG 4030 for RG 4.28 Rev 0)
- ML101940451 + (RA Drop-In Briefing Sheet - Hatch, Dated August 20, 2008)
- ML20150C401 + (RA Gasser Statement on 781101 Re Proposed Salt Water Cooling Tower for Subj Facil.Believes Ocean County Is Unsuitable for Siting Addl Energy Facils,Especially for What Would Be the Tallest Struc in Nj)
- ML19329E510 + (RA Jablon & Jc Pollock Motion to Withdraw as Counsel on Behalf of Portland,Mi.Affidavit & Certificate of Svc Encl)