Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML041200072 + (Procedure 2403.24, Perform 2D11 Station Battery Quarter)
- ML20126H151 + (Procedure 25, Survey of Old Cell Area After Removal of Old Cell)
- ML20126H161 + (Procedure 26, Vacuuming of External Block of Old Cell)
- ML20126H177 + (Procedure 27, Release of Carts & Semi-Live Skids)
- ML20126H216 + (Procedure 28, Release of Block from New Cell)
- ML20126H233 + (Procedure 29, Vent Sys Characteristics & Monitoring)
- ML17347B295 + (Procedure 3-EOP-ECA-0.1, Turkey Point Nuclear Plant Unit 3 Loss of All AC Power)
- ML20126H263 + (Procedure 30, Waste Consolidation in Labyrinth Area. Supporting Documentation Encl.Record of 840410 Telcons Encl)
- ML20126H455 + (Procedure 31, Preparation for Cask Use in Old Cell Source Storage Pool)
- ML20126H503 + (Procedure 32, Transfer of Waste Drums to & from Encl Area)
- ML20126H535 + (Procedure 33, Source Storage Pool Water Sampling. Handwritten Undated Procedure 34, Roof Shield Adaptation on Roof Area, Encl)
- ML20126H557 + (Procedure 34, Roof Shield Adaptation on Cell Area)
- ML20126H544 + (Procedure 35, Mod of Labyrinth Shielding)
- ML20126H597 + (Procedure 36, Prefilter Changeout for Vent Sys)
- ML20126H656 + (Procedure 37, Cell & Pool Area Decontamination)
- ML20126H675 + (Procedure 38, Const of Sampling Vault in Encl)
- ML20059D716 + (Procedure 3885-GEN-R-01-08028-00, Generic Procedure for Const Period Analyses of Radon Barrier Designs)
- ML20126H700 + (Procedure 39, Waste Drum Preparation for Exclusive Use Shipment)
- ML17277A981 + (Procedure 3900-76, MEB-50 Phase II Study)
- ML20126H732 + (Procedure 40, Installation of Water Supply for Source Storage Pool)
- ML20126H757 + (Procedure 42, Release of Matl & Equipment for Unrestricted Use)
- ML20126H779 + (Procedure 43, Temporary Release of Equipment from Facility Bldg)
- ML17305A321 + (Procedure 43OP-3ZZ16,RCS Drain Operations,Not Appropriate for Circumstances)
- ML18142A096 + (Procedure 466, Remote Multiplexer Integrated Functional Test Procedure)
- ML20210T812 + (Procedure 47-1159449-00, Main Feedwater Pump Trip Reduction Program, Final Rept)
- ML20052D804 + (Procedure 5.7.27,early Warning Sys)
- ML20087A998 + (Procedure 503-8500000-27, Safety Parameter Display Sys Implementation Plan)
- ML20087A964 + (Procedure 503-8500000-51, Verification & Validation Plan)
- ML20135A958 + (Procedure 5101.2, Project Classification of Equipment)
- ML20024A683 + (Procedure 5960-3 Responses to NRC Request for Info,Mark I Torus Program Plant Unique Rept)
- ML20205E176 + (Procedure 62, Health Physics Coverage for Activities Outlined in Nusosc Procedure 7071-08 During De-Sludging & Solidification of Old Co-60 Source Pool)
- ML20205D935 + (Procedure 62, Procedure to Remove Pool Water from New Source Storage Pool)
- ML20028G491 + (Procedure 6210-ADM-2550.01, Control of Exams for Units 1 & 2, Rev 0)
- ML20148H016 + (Procedure 64704, Fire Protection/Prevention Program Implementation. Same Procedure Issued on 810815 Encl)
- ML20024C739 + (Procedure 67-1003781-00 Plant Limits & Precautions)
- ML18107A512 + (Procedure 71151, Performance Indicator Verification)
- ML20086S729 + (Procedure 74-1125531-00, Abnormal Transient Operating Guidelines,Part II-Vol 2 Discussion of Selected Transients)
- ML20086S721 + (Procedure 74-1125531-00, Abnormal Transient Operating Guidelines,Part I Procedural Guidelines)
- ML20086S725 + (Procedure 74-1125531-00, Abnormal Transient Operating Guidelines,Part II-Vol 1 Fundamental of Reactor Control for Abnormal Transients)
- ML20076D489 + (Procedure 8.7.3, Secondary Containment Leak Rate Test, Containment Results of Leak Rate Tests Performed on 910505 & 0620)
- ML20045H538 + (Procedure 8.7.3,Secondary Containment Leak Rate Test)
- ML19340C946 + (Procedure 80A0482,Revision 4, Preservice Insp Program Plan)
- ML20059C579 + (Procedure 88-6, Acnp Inspectors Manual,1988 Edition. Related Info Encl)
- ML19324B482 + (Procedure 9.101, Radioactive Matls for Transport)
- ML20210U086 + (Procedure 91-614-04-123, Human Factors Integration of Zion Nuclear Generating Station Reg Guide 1.97 Program)
- RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes + (Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes)
- ML20080N033 + (Procedure AD.NP.16, Nuclear Production Directive Emergency Procedure Generation Program)
- 05000390/FIN-2011003-02 + (Procedure AOI-30.2 C.36, Fire Safe Shutdown Room 737-A1A, Non-feasible Operator Manual Action)
- 05000390/FIN-2012002-01 + (Procedure AOI-30.2 C.36, Fire Safe Shutdown Room 737-A1A, NON-FEASIBLE Operator Manual Action)
- ML20098G992 + (Procedure AP 0154, Post-Trip Review)
- ML071770460 + (Procedure AP 05-005, Rev. 11A, Design, Implementation & Configuration Control of Modifications)