Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Preliminary Rept - Incomplete Rcca Insertion". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML101241216  + (Preliminary RAIs for Watts Bar Unit 2 FSAR Section 3.10)
  • ML101190041  + (Preliminary RAIs for Watts Bar Unit 2 FSAR Section 5.5.11)
  • ML101180498  + (Preliminary RAIs for Watts Bar Unit 2 FSAR Section 9.3.2)
  • ML101330381  + (Preliminary RAIs on FSAR Sections 5.2.3 Through 6.1.1)
  • ML21274A182  + (Preliminary Radioisotope Screening for Off-site Consequence Assessment of Advanced Non-LWR Systems (SAND2021-11703))
  • ML20062D281  + (Preliminary Radiological ETS Re Channel Function Test Requirement on Liquid & Gaseous Effluent Monitors & Deletion of Channel Calibr & Functional Test Requirements for Pvs Flow Rate Measuring Device)
  • LIC-05-0063, Preliminary Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications  + (Preliminary Reactor Operator (RO) and Senior Reactor Operator (SRO) License Applications)
  • ML052700488  + (Preliminary Reactor Operator License Application with Waiver)
  • ML19304A039  + (Preliminary Recommendations for Modernization of the NRCs Digital I&C Regulatory Infrastructure)
  • ML20128M205  + (Preliminary Regulatory Analysis for 10CFR39, Licenses & Radiation Safety Requirements for Well Logging Operations)
  • ML20128M161  + (Preliminary Regulatory Analysis for 10CFR39, Licenses & Radiation Safety Requirements for Well Logging Operations)
  • ML20128M028  + (Preliminary Regulatory Analysis for 10CFR39, Licenses & Radiation Safety Requirements for Well Logging Operations)
  • ML22297A269  + (Preliminary Renewal Package for the NAC-MPC System, CoC 1025)
  • ML22297A273  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 1)
  • ML22297A274  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 2)
  • ML22297A280  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 8)
  • ML22297A279  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 7)
  • ML22297A276  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 4)
  • ML22297A278  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 6)
  • ML22297A275  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 3)
  • ML22297A272  + (Preliminary Renewed Certificate of Compliance No 1025, Renewed Initial Certificate)
  • ML22297A277  + (Preliminary Renewed Certificate of Compliance No. 1025, Renewed Amendment 5)
  • ML20206J849  + (Preliminary Reply Opposing Util Motion to Implement ASLB 860611 Order.Motion Directly Contradicts & Challenges Order. Ltrs Giving Supportive Background Info & Certificate of Svc Encl)
  • ML101930545  + (Preliminary Report Oconee Nuclear Station)
  • ML18127A838  + (Preliminary Report on System Disturbance, May 16, 1977)
  • ML20134J940  + (Preliminary Rept - Incomplete Rcca Insertion)
  • ML20133D783  + (Preliminary Rept - Orise Support of NRC License Insp at Fsv on 960930-1003)
  • ML20147G488  + (Preliminary Rept Rancho Seco Piping Vibration Tdi Diesels a & B)
  • ML20054C004  + (Preliminary Rept Zion Steam Generator Impacted Tube Ends Recovery Evaluation)
  • ML20197C712  + (Preliminary Rept of Deterministic Failure Consequence Analysis for Instrument Air Sys. Draft Preliminary Instrument & Svc Air Sys Status Rept Encl)
  • ML20090L621  + (Preliminary Rept of Fuel Cask Drop Accident Analysis)
  • ML20235K272  + (Preliminary Rept of Helium Circulator S/N C-2101 Damage Including Licensing Assessment)
  • ML20235H473  + (Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification for Returning to Power Operation)
  • ML19254F757  + (Preliminary Rept of Power Distribution Episode)
  • ML19322C535  + (Preliminary Rept of Safety Concerns Following Completion of 0.04 Square Ft Small Break Analysis at Pump Discharge on Smud Facility.Results Reveal Substantial Core Uncovery.B&W 780412 Memo Encl)
  • ML20024B569  + (Preliminary Rept of Safety Concerns Re Small Break LOCA Not Conforming to 10CFR50.46 Requirement)
  • ML20141N204  + (Preliminary Rept of Seismological & Geological Investigations Conducted in Epicentral Area of 860131 Earthquake in Northeastern Ohio. Equipment Seismic Qualification Evaluation & One Oversize Map Encl)
  • ML20033A600  + (Preliminary Rept of Structural Evaluation of Pilgrim Station Core Spray Sparger Based Upon Results from Oct 1981 Remote Visual Insp)
  • ML20209E977  + (Preliminary Rept of non-routine Occurence Re Identification of Possible Single Failure for Safety Related Temperature Sys on 990706.Low Temperature Auto Rundown Proposed & Problem Rept Initiated to Document Review of Event)
  • ML20086T598  + (Preliminary Rept on Analysis of Data Generated During Prototype PORV Block Valve Steam Blowdown Isolation Testing for NUREG-0737,Item II.D.1 Issues)
  • ML20027A694  + (Preliminary Rept on Calvert Cliffs Unit 1 Loss of Svc Water on 800520)
  • ML16341E992  + (Preliminary Rept on Empirical Studies of Horizontal Strong Ground Motion for Diablo Canyon Site,Ca)
  • ML19326A453  + (Preliminary Rept on Environ Considerations Re Suspension of Const Activities Per CPPR-80 for Davis-Besse)
  • ML19210A557  + (Preliminary Rept on Examination of Crystal River 3 Decay Heat Pump Shaft)
  • ML19320A577  + (Preliminary Rept on Geologic Drilling & Investigation San Onofre Nuclear Generating Station Units 2 & 3)
  • ML19309A727  + (Preliminary Rept on Hydrogeology of Low Level Radwaste Disposal Site Near Sheffield,Il, Open-File Rept 79-1545)
  • ML13330A759  + (Preliminary Rept on IE Bulletin 79-17,Insp of Stainless Steel Safety-Related Piping Containing Stagnant,Oxygenated, Borated Water)
  • ML20236J291  + (Preliminary Rept on Impact of Fort St Vrain 871002 Fire)
  • ML20211D396  + (Preliminary Rept on Main Steam Bypass Piping Fatigue Analysis & Life Expectancy)
  • ML20084P951  + (Preliminary Rept on Meeting Concerning Nine Mile Point Core Spray Nozzles & Related Piping Sys)
  • ML20210A377  + (Preliminary Rept on NPP Y2K Readiness)