Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211F699 + (Preliminary Evaluation of Effects of Alkaline Plume Migration on Near-Field Environ of HLW Geologic Repository)
- ML20154S410 + (Preliminary Evaluation of Effluent Radioactivity Monitoring Systems for BWR Plants)
- ML19323B153 + (Preliminary Evaluation of FLECHT-SEASET Sys Effects Test Facility as Natural Circulation & Reflux Mode Experiment, Preliminary Assessment Rept)
- ML20034G610 + (Preliminary Evaluation of Low Upper Shelf Energy for C-E NSSS Reactor Pressure Vessels)
- ML18249A379 + (Preliminary Evaluation of OPC Voluntary Industry Initiative (VII) Initial Inspection Results)
- ML18271A111 + (Preliminary Evaluation of OPC Voluntary Industry Initiative (VII) Initial Inspection Results)
- ML20050D592 + (Preliminary Evaluation of PWR Safety & Relief Valve Test Program Results,Point Beach Nuclear Plant. One Oversize Drawing Encl.Aperture Card Is Available in PDR)
- ML20102C394 + (Preliminary Evaluation of Perry Nuclear Power Plant H Control Sys)
- ML20234E038 + (Preliminary Evaluation of Piezometer Responses at DC-19, DC-20 & DC-22,during Const of DC-23W)
- ML093631248 + (Preliminary Evaluation of Possible Effects on Fish & Shellfish of Operation of Proposed Indian Point Nuclear Generating Unit 2)
- ML20038A838 + (Preliminary Evaluation of Possible Effects on Fish & Shellfish of Operation of Proposed Indian Point Unit 2)
- ML20114E761 + (Preliminary Evaluation of Sequoyah Unit 1 Flaw Indication, Supplemental Rept, Prepared by Southwest Research Inst)
- ML20036A112 + (Preliminary Evaluation of Snubber Single Failures)
- ML20002B681 + (Preliminary Executive Licensing Review Summary)
- ML030910624 + (Preliminary FENOC Submission Titled Responses to NRC Staff Comments and Questions on Davis-Besse Safety Significance Assessment (SIA-W-DB-O1Q301) Submitted April 8, 2002)
- ML19220C180 + (Preliminary FSAR Has Been Reviewed & Accepted Although 5% of Required Info Is Missing.Recommends Deficiencies Be Discussed During Technical Meetings)
- ML19351G259 + (Preliminary Failure Mode Predictions for the Ssmrp Reference Plant (Zion 1).Seismic Safety Margins Research Program)
- ML030360047 + (Preliminary Feedback on Inspection of North Anna, Unit 2, Design and Reconciliation Activities for the Reactor Pressure Vessel Head Replacement)
- ML20132H187 + (Preliminary Fes,Durango,Co Section 6 Re Public & Agency Comments for U Mill Tailings Remedial Action)
- ML20209E096 + (Preliminary Field Study of Indoor Average Radon-Daughter Estimation Methods)
- ML20046A933 + (Preliminary Final DOE/AL/62350-36PF, Long-Term Surveillance Plan for Lowman,Id,Disposal Site)
- ML20247G869 + (Preliminary Final Decommissioning Plan for Fermi 1)
- ML20202B335 + (Preliminary Final RAP & Site Design for Stabilization of Inactive U Mill Tailings Site at Falls City,Tx, Including Attachments 1 - 4 of App B of DE-FC04-85AI0533.Complete Rept Number UMTRA-DOE/AL 050520.0000)
- ML20198E806 + (Preliminary Final, Comparative Analysis of Disposal Site Alternative Rept for Umtra Project Falls City Site Located at Falls City,Texas)
- ML20203K169 + (Preliminary Final, Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings, Vol I - Text, Appendices A-C;Vol II - Appendices D & E & Vol III - App F, Subcontract Documents)
- ML20024B294 + (Preliminary Generic Plant Comparison)
- ML20027C079 + (Preliminary Geological,Hydrological & Geotechnical Evaluation of Coke Oven Site,Montrose County,Co)
- ML19320D721 + (Preliminary Geotechnical Investigation of Proposed Spring Creek Mesa Tailings & Effluent Disposal Site Near Uravan, Co)
- ML20206M952 + (Preliminary Guidelines for Evaluating Dose Assessments in Support of Decommissioning)
- ML22175A078 + (Preliminary HI-STORM 100 Amendment 17)
- ML22175A087 + (Preliminary HI-STORM 100 Amendment 17 User Need Memo)
- ML20214M946 + (Preliminary Hazards Summary Rept)
- ML20030A430 + (Preliminary Hazards Summary Rept for Big Rock Point)
- ML20008E424 + (Preliminary Hazards Summary Rept for Yankee Rowe.Includes Revisions Through 581201)
- ML20235B492 + (Preliminary Hazards Summary Rept,Bodega Bay Atomic Park, Unit 1)
- ML23017A154 + (Preliminary Hermes CP SE Chapter 10, Experimental Facilities and Utilizaiton for ACRS)
- ML23017A156 + (Preliminary Hermes CP SE Chapter 11, Radiation Protection and Waste Management for ACRS)
- ML23017A157 + (Preliminary Hermes CP SE Chapter 12, Conduct of Operations for ACRS)
- ML23017A159 + (Preliminary Hermes CP SE Chapter 14, Technical Specifications for ACRS)
- ML23017A160 + (Preliminary Hermes CP SE Chapter 16, Other License Considerations for ACRS)
- ML23017A162 + (Preliminary Hermes CP SE Chapter 17, Decommissioning and Possession-Only License Amendments for ACRS)
- ML23017A163 + (Preliminary Hermes CP SE Chapter 18, Highly Enriched to Low-Enriched Uranium Conversion for ACRS)
- ML23017A149 + (Preliminary Hermes CP SE Chapter 5, Reactor Coolant System for ACRS)
- ML23017A150 + (Preliminary Hermes CP SE Chapter 7, Instrumentation and Control Systems for ACRS)
- ML23017A151 + (Preliminary Hermes CP SE Chapter 8, Electrical Power Systems for ACRS)
- ML23017A152 + (Preliminary Hermes CP SE Chapter 9, Auxiliary Systems for ACRS)
- ML17212A369 + (Preliminary Human Engineering Assessment of St Lucie Unit 2 Nuclear Power Plant Control Room)
- ML20042G659 + (Preliminary Hydrogeologic Investigation Rept Cintichem Facility Long Meadow Road Tuxedo,Ny)
- ML20115K165 + (Preliminary Hydrogeological Investigation Saxton Nuclear Experimental Station Saxton,Pa)
- ML20128N237 + (Preliminary Idcor Task 23.1 - Integrated Containment Analysis)
- ML19220C867 + (Preliminary Info Re Plant Status as of 790402.Measurements Indicate Vol of Gases within Bubble Significantly Reduced)