Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030800604 + (Power Supplies and Failure Modes for Auxiliary Feedwater System Electrical Components)
- 05000220/LER-2008-003, Power Supplies for Drywell Pressure Indication Not Qualified for Required Post-Accident Operating Duration + (Power Supplies for Drywell Pressure Indication Not Qualified for Required Post-Accident Operating Duration)
- 05000321/LER-2008-004, Power Supply Card Failure Causes Loss of Feedwater Flow Resulting in Manual Reactor Scram + (Power Supply Card Failure Causes Loss of Feedwater Flow Resulting in Manual Reactor Scram)
- ENS 44863 + (Power Supply Failure Resulting in a Tech Spec Required Shutdown)
- ENS 48101 + (Power Supply Problems to Various Area Rad Monitors)
- ML19310F029 + (Power Sys Branch Has Reviewed Proposed Changes to Tech Spec Section 4.8.3.1.a.2,& Concurs w/10% Rotating Test Proposal for Molded Case Breakers & Recommends Change Be Incorporated Into STS)
- ML20040A664 + (Power Sys Branch Supplemental Second Round Questions)
- ML19339D047 + (Power Sys Coordination & Integration Agreement Between Sc Public Svc Authority & Central Electric Power Cooperative,Inc)
- ML20072P579 + (Power System Harmonic Study for Peach Bottom Nuclear Power Plant, Final Rept)
- ML20005B830 + (Power Train - Hybrid Computer Simulation of B&W Nuclear Power Plant)
- ML19270G019 + (Power Transfer,How & Why)
- ML20261L590 + (Power Transformers Index. Sheet 0)
- ML20261L630 + (Power Transformers Main Transformers A,B,And C Temp Process Instrumentation. Sheet 200)
- 05000400/FIN-2013003-01 + (Power Transient due to a Main Feedwater Pump Oil Leak)
- ML20148E944 + (Power Update Startup Test Rept for Cycle 11)
- Power Uprate Inspection (Browns Ferry 2019) + (Power Uprate)
- Power Uprate Inspection 2 (Browns Ferry 2019) + (Power Uprate)
- PLA-6264, Power Uprate Application Reactor Systems Technical Review Request for Additional Information Responses + (Power Uprate Application Reactor Systems Technical Review Request for Additional Information Responses)
- RS-03-014, Power Uprate Ascension Test Report + (Power Uprate Ascension Test Report)
- RS-02-137, Power Uprate Ascension Test Report + (Power Uprate Ascension Test Report)
- RS-02-067, Power Uprate Ascension Test Report + (Power Uprate Ascension Test Report)
- RS-03-019, Power Uprate Ascension Test Report for Quad Cities Nuclear Power Station, Unit 1 + (Power Uprate Ascension Test Report for Quad Cities Nuclear Power Station, Unit 1)
- ML031180079 + (Power Uprate License Amendment Request)
- ML24318C453 + (Power Uprate November 14 2024 NEI Public Meeting Slides - Industry Perspectives on Combined License Applications – Improved Efficiencies & Agility)
- ML24318C512 + (Power Uprate November 14, 2024 NRC Public Meeting Slides)
- ML20135C981 + (Power Uprate Project BOP Licensing Rept)
- ML20094P968 + (Power Uprate Safety Analsis Rept for BSEP Units 1 & 2)
- ML20125B503 + (Power Uprate Safety Analysis. Rept Partially Deleted)
- ML24249A115 + (Power Uprate September 5, 2024 Public Meeting Slides)
- RBG-46145, Power Uprate Startup Report + (Power Uprate Startup Report)
- ML20197J190 + (Power Uprate Startup Test Rept for Nov 1992-Mar 1993)
- 2CAN060203, Power Uprate Startup Testing Report + (Power Uprate Startup Testing Report)
- ML26023A001 + (Power Uprate and Extended Fuel Cycle Licensing Strategy Meeting for Vogtle 1&2 (Slides))
- ML19242A311 + (Power-Cooling-Mismatch Test PCM-7 Experiment Predictions, Thermal Fuels Behavior Program,Interim Rept)
- ML19332A033 + (Power-Cooling-Mismatch Test Series Test PCM-7, Quick Look Rept)
- ML19326E122 + (Power-Cooling-Mismatch Test Series Test PCM-4: Postirradiation Examination)
- ML19259B640 + (Power-Cooling-Mismatch Test Series Test PCM-7 Experiment Operating Specifications)
- ML19249E877 + (Power-Cooling-Mismatch Test Series,Test PCM-1,Fuel Rod Behavior Rept, Aug 1979)
- ML19209A174 + (Power-Cooling-Mismatch Test Series,Test PCM-3, Test Results Rept)
- ML19341B767 + (Power-Operated Relief Valve Failure Reduction Methods, Final Rept)
- ML20338A012 + (Power-Operated Valve Inspections Lessons Learned Public Meeting (Rev2))
- ML080280186 + (Power/Amag Issue Update from P. Snyder (NRR) to A. Stone (Riii), Et Al)
- ML20262K050 + (Powerhouse Auxiliary Building:Flow Diagram - Essential Raw Cooling Water System)
- ML20261A379 + (Powerhouse Common Equipment Functional Control Logic Diagram:Spent Fuel Cooling System)
- ML20260K520 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal Plant)
- ML20260K528 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal System)
- ML20260K514 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal System)
- ML20260K512 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal System)
- ML20260K507 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal System)
- ML20260K503 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal System)
- ML20260K499 + (Powerhouse Common Equipment Functional Control Logic Diagram:Waste Disposal System)