Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Power Plant Siting Policy Paper". Since there have been only a few results, also nearby values are displayed.

⧼showingresults⧽

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • 05000250/FIN-2013004-04  + (Power Operated Relief Valve Inoperable for Greater Than Allowed Outage Time Due to Lifted Leads)
  • ML18047A458  + (Power Operated Relief Valve Justification Rept)
  • ML20065B089  + (Power Operated Relief Valve Reliability Study & Setpoint Analysis for TVA & WPPSS, Final Rept)
  • ML18047A451  + (Power Operated Relief Valves (PORV) PWRs Safety & Relief Valve Test Program, Justification Rept SV-177,Revision 1)
  • ML20259D137  + (Power Operated Relief Valves Control Logic Diagram System:S-10. Sheet 4)
  • ML20083A199  + (Power Operation of Hatch 1 & 2 Reactors W/O Forced Recirculation)
  • Information Notice 1992-74, Power Oscillations at Washington Nuclear Power Unit 2  + (Power Oscillations at Washington Nuclear Power Unit 2)
  • ENS 47014  + (Power Outage Causing Loss of Battery Room Ventillation and Hydrogen Monitor)
  • ML20259B151  + (Power PLAN-SERVICE Building El 21 FT-6 Inches & HP Building El 22 FT-0 Inches & 35 FT-4 Inches, as-built.Sheet 3)
  • ML19274E541  + (Power Peaking Nuclear Reliability Factors, Nonproprietary Version)
  • ML20264E283  + (Power Piping. Actual Rev STATUS:9F)
  • ML15231A417  + (Power Plant Causal Turtles)
  • ML19323C531  + (Power Plant Condenser Tube Simulator Research Project Progress Rept, for 791201-800315)
  • ML19341A597  + (Power Plant Condenser Tube Simulator Research Project, Progress Rept for 800315-0615)
  • ML21326A251  + (Power Plant Engineering Manual, Pre-Study Chapter 1, Heat Transfer and Thermal Hydraulics Basics)
  • ML19276F358  + (Power Plant Entrainment Simulation Utilizing Condenser Tube Simulator:Results of Experimental Exposure of Striped Bass Early Life History Stages,Gammarus Spp & Neomysis Americana to Variations in Temp,Flow Rate & Biocide Concentrations)
  • ML19249A953  + (Power Plant Entrainment Simulation Utilizing Condenser Tube Simulator, Annual Rept Dec 1977-Nov 1978)
  • ML20031E088  + (Power Plant Entrainment Simulation Utilizing a Condenser Tube Simulator)
  • ML20024B260  + (Power Plant Exam Results Summary Sheets)
  • ML20024B231  + (Power Plant Exam Results Summary Sheets)
  • ML20024B232  + (Power Plant Exam Results Summary Sheets for Miscellaneous Facilities)
  • ML20132F889  + (Power Plant Exam Results Summary Sheets.Info Deleted)
  • ML19220C736  + (Power Plant Examination Results Summary Sheet for Various Plants for 1977-1979)
  • ML091350081  + (Power Plant Research Program Environmental Radionuclide Concentrations in the Vicinity of the Calvert Cliffs Nuclear Power Plant and the Peach Bottom Atomic Power Station: 2004-2005)
  • ML19024A104  + (Power Plant Simulator Conference Presentation - January 23, 2019)
  • ML19347C601  + (Power Plant Siting and Design:A Case Study of Minimal Entrainment and Inpingement Impacts at DAVIS-BESSE Nuclear Power Station)
  • ML20049J074  + (Power Plant Siting and Design:Intake and Discharge Effects at Point Beach Nuclear Plant on Lake Michigan Biota and Fisheries)
  • ML19338B920  + (Power Plant Staffing)
  • ML24268A099  + (Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance)
  • ML110460520  + (Power Plant, Unit 1, ME5683, Letter to Licensee Approval of Request for Extension of Submittal of Reactor Vessel Material Surveillance Capsule Report)
  • ML12332A179  + (Power Point Presentation by Entergy at the November 26, 2012 Meeting (TAC No. ME9706.))
  • ML042790387  + (Power Point Presentation on Wetland Reviews)
  • ML24065A477  + (Power Point Presentation: March 6, 2024, Partially Closed Meeting to Discuss NISTs Draft RAI Responses (License Renewal Application Dated August 8, 2023))
  • ML19203A169  + (Power Point Presentation: Mobile Source Transit Security System (Memorandum to C. Regan Summary of July 9, 2019 Public Meeting with Industrial Nuclear Company, Inc to Discuss the Model No. IR-100ST))
  • ML12124A078  + (Power Point Presentation: Peach Bottom - Timing and Criteria for RCS Failure)
  • ML19198A011  + (Power Point Presentation: Seminar on Advance Technology Fuel for LWRs and Non-LWR Technologies for NMSS Application)
  • ML18026A661  + (Power Point Presentations Related to NRC Liaison Report and Updates for Snubber User Group (Snug) Meeting in February 2018 at Baton Rouge, La)
  • ML19008A341  + (Power Point Slides for 1/10/2019 Public Meeting: Focused Self-Assessment of the Emergency Preparedness Significance Determination Process)
  • ML23171B080  + (Power Point Slides for Effluents Conference June 2023)
  • ML010370043  + (Power Purchase Agreement for NMP 1 and NMP 2)
  • ML20259B394  + (Power Range Channel (1 of 2), Detailed Schematic (22 of 50). Subassembly C)
  • ML20259B454  + (Power Range Channel (1 of 2),Detailed Schematic Diagrams (33 of 50). Subassembly D)
  • ML20259B398  + (Power Range Channel (1 of 2),Detailed Schematic Diagrams (1 of 50). Subassembly a)
  • ML20259B400  + (Power Range Channel (2 of 2),Detailed Schematic Diagrams (23 of 50). Subassembly C)
  • ML20259B447  + (Power Range Channel (2 of 2),Detailed Schematic Diagrams (34 of 50). Subassembly D)
  • ML20259B476  + (Power Range Channel (2 of 2),Detailed Schematic Diagrams (12 of 50). Subassembly B)
  • ML20259A981  + (Power Range Channel,Detailed Schematic Diagrams. Subassembly a)
  • ENS 46999  + (Power Range Monitor Channels Out of Alignment)
  • 05000456/LER-2007-002, Power Range N43 Positive Rate Trip Inoperable Due to Miscalibration of Time Constant  + (Power Range N43 Positive Rate Trip Inoperable Due to Miscalibration of Time Constant)
  • ML20261E152  + (Power Range Neut Mon System Computer Analog Inputs & Transient Test Outputs & APRM Recorders. Sheet B51)