Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263P679 + (Power Distribution and Motor Data Sheet 13.8kV Switchgear Bus RCP-SA & RCP-SB. Sheet 6)
- ML20263P677 + (Power Distribution and Motor Data Sheet 13.8kV Switchgear Bus A1 & B1. Sheet 5)
- ML20263P692 + (Power Distribution and Motor Data Sheet 4.16kV Switchgear A4 & B4. Sheet 10)
- ML20003B222 + (Power Division Administrative Organization, Reflecting 801231 Organizational Mod)
- ML20259C400 + (Power Escalation Test Logic. Sheet 68 of 68)
- ML20101F980 + (Power Excursion Analysis for High Burnup Cores)
- ML19261C405 + (Power Generation Control Complex Design Criteria & Safety Evaluation)
- ML20076J870 + (Power Generation Group ECCS Analysis Unit Jul Activities Rept)
- ML20076J863 + (Power Generation Group ECCS Analysis Unit Mar Activities Rept)
- ML20040C557 + (Power Histories for Fuel Codes)
- ML20260K225 + (Power House Functional Control Logic Diag:Aux Bldg Fuel Handling Area Environmental Control System)
- ML20260K221 + (Power House Functional Control Logic Diag:Aux Bldg Fuel Handling Area Environmental Control System)
- ML20244E184 + (Power Increase)
- ML20148H037 + (Power Insp,Inc QA Program)
- Regulatory Guide 1.49 + (Power Levels of Nuclear Power Plants)
- ENS 41434 + (Power Loss and Restored to Tone Alert Radio Notification System)
- ENS 51011 + (Power Lost to Control Room Normal Outside Air Intake Dampers During Testing)
- ENS 40078 + (Power Lost to Emergency Sirens.)
- ENS 48901 + (Power Lost to Meteorological Instrumentation)
- ENS 46092 + (Power Lost to the Emergency Operations Facility)
- 05000317/LER-1981-056-01, Power Operated Relief Valve Declared Inoperable.Valve Opened on Erroneous High Pressure Signal Caused by Bumping Pressurizer Transmitter. Configuration of Transmitter Modified + (Power Operated Relief Valve Declared Inoperable.Valve Opened on Erroneous High Pressure Signal Caused by Bumping Pressurizer Transmitter. Configuration of Transmitter Modified)
- 05000250/FIN-2013004-04 + (Power Operated Relief Valve Inoperable for Greater Than Allowed Outage Time Due to Lifted Leads)
- ML18047A458 + (Power Operated Relief Valve Justification Rept)
- ML20065B089 + (Power Operated Relief Valve Reliability Study & Setpoint Analysis for TVA & WPPSS, Final Rept)
- ML18047A451 + (Power Operated Relief Valves (PORV) PWRs Safety & Relief Valve Test Program, Justification Rept SV-177,Revision 1)
- ML20259D137 + (Power Operated Relief Valves Control Logic Diagram System:S-10. Sheet 4)
- ML20083A199 + (Power Operation of Hatch 1 & 2 Reactors W/O Forced Recirculation)
- Information Notice 1992-74, Power Oscillations at Washington Nuclear Power Unit 2 + (Power Oscillations at Washington Nuclear Power Unit 2)
- ENS 47014 + (Power Outage Causing Loss of Battery Room Ventillation and Hydrogen Monitor)
- ML20259B151 + (Power PLAN-SERVICE Building El 21 FT-6 Inches & HP Building El 22 FT-0 Inches & 35 FT-4 Inches, as-built.Sheet 3)
- ML19274E541 + (Power Peaking Nuclear Reliability Factors, Nonproprietary Version)
- ML20264E283 + (Power Piping. Actual Rev STATUS:9F)
- ML15231A417 + (Power Plant Causal Turtles)
- ML19323C531 + (Power Plant Condenser Tube Simulator Research Project Progress Rept, for 791201-800315)
- ML19341A597 + (Power Plant Condenser Tube Simulator Research Project, Progress Rept for 800315-0615)
- ML21326A251 + (Power Plant Engineering Manual, Pre-Study Chapter 1, Heat Transfer and Thermal Hydraulics Basics)
- ML19276F358 + (Power Plant Entrainment Simulation Utilizing Condenser Tube Simulator:Results of Experimental Exposure of Striped Bass Early Life History Stages,Gammarus Spp & Neomysis Americana to Variations in Temp,Flow Rate & Biocide Concentrations)
- ML19249A953 + (Power Plant Entrainment Simulation Utilizing Condenser Tube Simulator, Annual Rept Dec 1977-Nov 1978)
- ML20031E088 + (Power Plant Entrainment Simulation Utilizing a Condenser Tube Simulator)
- ML20024B260 + (Power Plant Exam Results Summary Sheets)
- ML20024B231 + (Power Plant Exam Results Summary Sheets)
- ML20024B232 + (Power Plant Exam Results Summary Sheets for Miscellaneous Facilities)
- ML20132F889 + (Power Plant Exam Results Summary Sheets.Info Deleted)
- ML19220C736 + (Power Plant Examination Results Summary Sheet for Various Plants for 1977-1979)
- ML091350081 + (Power Plant Research Program Environmental Radionuclide Concentrations in the Vicinity of the Calvert Cliffs Nuclear Power Plant and the Peach Bottom Atomic Power Station: 2004-2005)
- ML19024A104 + (Power Plant Simulator Conference Presentation - January 23, 2019)
- ML20058G671 + (Power Plant Siting Policy Paper)
- ML19347C601 + (Power Plant Siting and Design:A Case Study of Minimal Entrainment and Inpingement Impacts at DAVIS-BESSE Nuclear Power Station)
- ML20049J074 + (Power Plant Siting and Design:Intake and Discharge Effects at Point Beach Nuclear Plant on Lake Michigan Biota and Fisheries)
- ML19338B920 + (Power Plant Staffing)
- ML24268A099 + (Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance)