Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/FIN-2017002-02 + (Performance of Operations with Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment)
- 05000321/FIN-2016002-03 + (Performance of Operations with Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment)
- 05000321/FIN-2015002-03 + (Performance of Operations with Potential to Drain the Reactor Vessel (OPDRV) in Mode 5 Without Secondary Containment)
- 05000324/LER-1982-083-03, Performance of PT-20.6 Revealed That Drywell to Torus Vacuum Breakers X18A,C & E Were Leaking Excessively.Caused by Accumulation of Dirt, Scale & Silicone Base Sealant on Valve Seating Surfaces + (Performance of PT-20.6 Revealed That Drywell to Torus Vacuum Breakers X18A,C & E Were Leaking Excessively.Caused by Accumulation of Dirt, Scale & Silicone Base Sealant on Valve Seating Surfaces)
- ML20062M176 + (Performance of Portable Radiation Survey Instruments)
- 05000321/LER-1981-090-01, Performance of RCIC Turbine Exhaust Diaphragm Pressure Instrument Showed N012 A-D Switches Actuating Above Tech Spec.Caused by Setpoint Drift.Switches Recalibr.Design Changes Implemented + (Performance of RCIC Turbine Exhaust Diaphragm Pressure Instrument Showed N012 A-D Switches Actuating Above Tech Spec.Caused by Setpoint Drift.Switches Recalibr.Design Changes Implemented)
- ML20236M789 + (Performance of Remedial Response Activities at Uncontrolled Hazardous Waste Sites (Rem Ii),Epa Contract 68-01-6939,Work Plan for Maxey Flats Disposal Site Remedial Investigation/Feasibility Study,Fleming County,Ky)
- ML20214G982 + (Performance of Remote Visual Insp of Rigid Pipe Support, Nuclear Safety Review Staff Investigation Rept on 851011-23 Re Employee Concern XX-85-065-001)
- Information Notice 2009-18, Performance of Required Shutter Checks and Reporting of Gauge Shutter Failures + (Performance of Required Shutter Checks and Reporting of Gauge Shutter Failures)
- ML20246L962 + (Performance of Safety Injection Pumps W/Air Ingestion, Final Rept)
- 05000416/FIN-2018002-08 + (Performance of Surveillance Testing Following Maintenance on Containment Airlock)
- ML20045D335 + (Performance of Trojan Spent Fuel Pool Structure If Subj to Seismic Margin Earthquake Ground Motions)
- 05000456/FIN-2010002-03 + (Performance of Troubleshooting Leads to Auxiliary Building Ventilation Fan Fire)
- ML19309G207 + (Performance of York Model 299 Type 3G Demister Moisture Separator in Removing Droplets in Air-Steam Dispersion)
- ML17238A715 + (Performance of the Dresden Units 2 and 3 Emergency Core Cooling Systems)
- ML19332C778 + (Performance of the Liquid Reactivity Control System in Bwrs)
- Regulatory Guide 4.13 + (Performance,Testing & Procedural Specifications for Thermoluminescence Dosimetry:Environmental Applications)
- ML051590049 + (Performance-Based Approach for Associated Equipment in 10 CFR 34.20)
- RIS 2005-10, Performance-Based Approach for Associated Equipment in 10 CFR 34.20 + (Performance-Based Approach for Associated Equipment in 10 CFR 34.20)
- ML20085E651 + (Performance-Based Testing Proposal for Entergys Cyber Security Testing Plant (EPID P-2020-PRF-0000; CAC No. 001648))
- 05000390/FIN-2008005-03 + (Performing Non-Authorized Activities on Exciter Field Breaker Results in Reactor Trip)
- 05000482/FIN-2009004-06 + (Performing Prohibited Elective Maintenance on Safety Bus NB02 Channel 4 During Emergency Diesel Generator Maintenance)
- ML19337A593 + (Performing Visual Insp of Matls & Items)
- 05000482/FIN-2008002-02 + (Performing prohibited elective maintenance on offsite power during EDG maintenance.)
- ML23072A397 + (Period Review of Regulatory Guide 1.68, Initial Test Programs for Water-Cooled Nuclear Power Plants)
- NL-03-126, Period Summary Report of NRC Regulatory Commitment Changes + (Period Summary Report of NRC Regulatory Commitment Changes)
- ML063050556 + (Period of Enforcement Discretion During Implementation of National Fire Protection Association Standard 805, Cooper Nuclear Station)
- ML070590625 + (Period of Enforcement Discretion During Implementation of National Fire Protection Association Standard 805, Shearon Harris Unit 1, H. B. Robinson Unit 2, Brunswick Units 1 and 2, and Crystal River Unit 3)
- ML071000033 + (Period of Enforcement Discretion During Implementation of National Fire Protection Association Standard 805, Davis-Besse Nuclear Power Station, Unit No. 1)
- ML071310402 + (Period of Enforcement Discretion During Implementation of National Fire Protection Association Standard 805)
- ML061920018 + (Period of Enforcement Discretion During Implementation of National Fire Protection Association (NFPA) Standard 805, R. E. Ginna Nuclear Power Plant)
- ML062020258 + (Period of Enforcement Discretion Extension for Arkansas Nuclear One, Units 1 and 2, During Implementation of National Fire Protection Association Standard 805)
- ML062020265 + (Period of Enforcement Discretion Extension for Turkey Point Nuclear Plant, Units 3 and 4, During Implementation of National Fire Protection Association Standard 805)
- ML062020289 + (Period of Enforcement Discretion Extension for St. Lucie Nuclear Plant, Units 1 and 2, During Implementation of National Fire Protection Association Standard 805)
- ML062020316 + (Period of Enforcement Discretion Extension for Diablo Canyon Power Plant, Units 1 and 2, During Implementation of National Fire Protection Association Standard 805)
- PMNS20210148, Periodic Advanced Reactor Stakeholder Meeting. Topics Include Power Reactor Construction Permit Guidance Applicable to Both Light Water and non-light Water Reactor Applications and Other Advanced Reactor Stakeholder Topics + (Periodic Advanced Reactor Stakeholder Meeting. Topics Include Power Reactor Construction Permit Guidance Applicable to Both Light Water and non-light Water Reactor Applications and Other Advanced Reactor Stakeholder Topics)
- PMNS20210146, Periodic Advanced Reactor Stakeholder Meeting. Topics Include Power Reactor Construction Permit Guidance Applicable to Both Light Water and non-light Water Reactor Applications and Other Advanced Reactor Stakeholder Topics + (Periodic Advanced Reactor Stakeholder Meeting. Topics Include Power Reactor Construction Permit Guidance Applicable to Both Light Water and non-light Water Reactor Applications and Other Advanced Reactor Stakeholder Topics)
- PMNS20200148, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20200135, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20200229, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20200478, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20200636, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20200929, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20201081, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20201260, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20201411, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20210409, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20210636, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20210786, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20211054, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)
- PMNS20211191, Periodic Advanced Reactor Stakeholder Meeting + (Periodic Advanced Reactor Stakeholder Meeting)