Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Part 21 - Valve Assembly Nonconformance". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ENS 47990  + (Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars)
  • ENS 48379  + (Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars)
  • ML12283A243  + (Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars)
  • ML12255A054  + (Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars)
  • ML12157A311  + (Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars)
  • ENS 57304  + (Part 21 - Stress Corrosion Cracking in Control Rod Blades)
  • ENS 42591  + (Part 21 - Sulzer Pumps, Inc.)
  • ENS 52003  + (Part 21 - Switches Not Enviromentally Qualified)
  • ENS 48382  + (Part 21 - Temperature Switch Potentially Shipped Without Set Screw)
  • ML12283A244  + (Part 21 - Temperature Switch Potentially Shipped Without Set Screw)
  • ENS 57836  + (Part 21 - Thermal Overload of Voltage Regulators)
  • ENS 57753  + (Part 21 - Thermal Sleeve Defect)
  • ENS 49932  + (Part 21 - Thomas and Betts Printed Circuit Boards)
  • ML14113A370  + (Part 21 - Thomas and Betts Printed Circuit Boards)
  • ENS 56178  + (Part 21 - Tioga Pipe Purchased and Supplied Unqualified Piping)
  • ENS 43558  + (Part 21 - Two Commerical Grade Relays Contained Deficiencies)
  • ENS 50635  + (Part 21 - Type 67 Afr Regulators with Improperly Dedicated Diaphragm Valve Seats)
  • ML14337A093  + (Part 21 - Type 67 Afr Regulators with Improperly Dedicated Diaphragm Valve Seats)
  • ENS 47537  + (Part 21 - Uf6 Accumulator Tank Had Through Wall Cracks That Caused Leakage)
  • ENS 53246  + (Part 21 - Undersized Packing Glands in Certain Crane Gate Valves)
  • ENS 54506  + (Part 21 - Unknown Tightness of Cam Thrust Lock Nut Assembly)
  • ENS 49908  + (Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve)
  • ML14210A010  + (Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve)
  • ML14079A027  + (Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve)
  • ML25178A801  + (Part 21 - Valcor Solenoid Valve Defect Identified, EN 57785)
  • ENS 52537  + (Part 21 - Valve Assembly Nonconformance)
  • ENS 54301  + (Part 21 - Valve Manufacture Acceptance Criteria)
  • ENS 53422  + (Part 21 - Wear of Thermal Sleeve in Westinghouse Control Rod Drive Mechanisms)
  • ENS 48797  + (Part 21 - Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections)
  • ENS 55836  + (Part 21 - Westinghouse Actuator Full Voltage Reversing Contactors Deficency Report)
  • ENS 51492  + (Part 21 - Westinghouse Type Kir-60 Current Transformer)
  • ENS 48493  + (Part 21 - an Operating Mechanism Front Cover Failed During Licensee Receipt Inspection)
  • ML12318A039  + (Part 21 - an Operating Mechanism Front Cover Failed During Licensee Receipt Inspection)
  • ML20236J105  + (Part 21 30 Day Written Rept Re Refurbished DB-25 Circuit Breaker Returned W/Missing Pin in Operating Mechanism.Spare DB-25 Circuit Breaker Was Inspected,Tested & Installed to Restore B Service Water Pump to Service)
  • AEP-NRC-2025-39, Part 21 30-day Notification  + (Part 21 30-day Notification)
  • ENS 40962  + (Part 21 60-Day Interim Notification: Narrow Range Water Level Instrument Level 3 Trip)
  • ML12348A136  + (Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers)
  • ML061360465  + (Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking)
  • ML12271A314  + (Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculation Methodology)
  • ML112240142  + (Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance)
  • ML102700614  + (Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance)
  • ML102460537  + (Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance)
  • ML14072A328  + (Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV)
  • ML12347A308  + (Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology)
  • ML15169A007  + (Part 21 60-Day Interim Report Notification: Potential Failure of Electromatic Relief Valve Cutout Switch)
  • ML12158A447  + (Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld)
  • ML093290046  + (Part 21 Communication Involving Wartsila Type Sacm UD45 Emergency Diesel Generating Sets Big End Bearings Installed in the Us Nuclear Power Stations of Constellation Energy at Calvert Cliffs and Xcel Energy at Prairies Island)
  • ML052000333  + (Part 21 Communication: Circuit Breaker Replacement Primary Bushings Not Tested to ANSI Standards)
  • ML052910389  + (Part 21 Communication: Testing to ANSI Standards Complete on Circuit Breaker Replacement Primary Bushings)
  • ENS 43166  + (Part 21 Concerning Material Verifications on High Pressure and Temperature Steam and Water Globe Valves)
  • ENS 43378  + (Part 21 Defect - Brachytherapy Seeds Unable to Return to Transfer Device After Treatment)