Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18153B547 + (PRA Applications Program for Insp at Surry Nuclear Power Station,Unit 1, Draft Rept)
- ML20150F344 + (PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company))
- ML20246A359 + (PRA Applications Program for Inspection at Calvert Cliffs Unit 1 Nuclear Power Plant)
- ML20113C508 + (PRA Barrier Control Program)
- ML16092A032 + (PRA Change Summary for Reg Conf Letter 3-22 Final)
- ML24081A131 + (PRA Configuration Control OpESS 2023-02 Cross Regional Panel Charter)
- ML23187A063 + (PRA Configuration Control Status for July 2023 ROP Public Meeting)
- ML22263A477 + (PRA Configuration Control Tabletop ROP Meeting_28 SEP 22_Final)
- ML21326A145 + (PRA Configuration Control Workshop)
- PMNS20211509, PRA Configuration Control Workshop + (PRA Configuration Control Workshop)
- ML22031A255 + (PRA Configuration Control Workshop Public Meeting February 2, 2022)
- ML22094A198 + (PRA Configuration Control Workshop_5 Apr 2022_Final)
- ML22031A256 + (PRA Configuration Control Workshop_Feb 2022_Final)
- ML24312A153 + (PRA Counterpart Meeting 2024 - SPAR Model Updates)
- ML24311A185 + (PRA Counterparts - Pcc Update - 8 NOV 2024)
- ML20133J389 + (PRA Documentation for GESSAR-II Standardized Plant Design)
- ML20072S893 + (PRA Evaluation of Population Dose Risk from Severe Accidents at San Onofre Nuclear Generating Station Units 2 & 3)
- ML20072S935 + (PRA Evaluation of Risk Impact of Proposed One-Time Exemption from Requirements of 10CFR50,App J for ILRT Testing at San Onofre Nuclear Generating Station Units 2 & 3)
- ML20063D330 + (PRA Evaluation of Tornado-Generated Missile Impact on SONGS 2/3 AFW Sys)
- ML20064J450 + (PRA Evaluation:Proposed Changes in Primary Cooling Water Tech Spec 3.7.3)
- ML20065P476 + (PRA Evaluation:Proposed Changes in Svc Water TS 3.7.4)
- ML20115B098 + (PRA IPE, Summary Rept)
- ML17348A960 + (PRA Individual Plant Exam Final Rept, Vols 1 & 2)
- ML20210K645 + (PRA Insights)
- ML21138A805 + (PRA Lessons from Ope Uiuc)
- 05000315/FIN-2015003-05 + (PRA Model Errors)
- ML20070U251 + (PRA Procedures Guide.A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
- ML20070U255 + (PRA Procedures Guide.A Guide to the Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
- ML20031G797 + (PRA Procedures Guide:(Review Draft) Guide to Performance of Probabilistic Risk Assessments for Nuclear Power Plants)
- ML26006A147 + (PRA Realism Day 2 Updated Agenda)
- ML25272A200 + (PRA Realism Workshop -NRC All)
- ML25234A148 + (PRA Realism Workshop Agenda)
- ML25272A201 + (PRA Realism Workshop- Industry Combined)
- ML19080A041 + (PRA Reporting Requirement for 505 - February 2019)
- ML21154A176 + (PRA Reporting Requirement for 505 - February 2019)
- ML12159A103 + (PRA Requests for Additional Information, Request to Adopt National Fire Protection Association Standard NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition))
- ML20217E965 + (PRA Rev 2 Summary Rept. W/Disk)
- ML20209D547 + (PRA Review & Recommended Approach for Completion of Project, Status Rept as of 841101)
- ML20135H483 + (PRA Review Manual)
- ML030870737 + (PRA Update Project - Phase 2, Project Work Plan, Revision 0)
- ML18317A054 + (PRA Upgrade Definition (and Related Topics) Working Meeting - Pressurized Water Reactor Owners Group - Slides for 11/14/18 Public Meeting on Use of New Probabilistic Methods)
- ML21138A810 + (PRA and RIDM - UCLA)
- ML21138A779 + (PRA and RIDM INL Mev)
- ML21138A780 + (PRA and RIDM Mit)
- ML19309F616 + (PRA and RIDM Mit 2019-11-25 Rev. 1 Small)
- ML21138A781 + (PRA and RIDM NCSU)
- ML20293A370 + (PRA and Risk-Informed Decision Making at the NRC: Some Trends and Challenges (NCSU Lecture))
- ML20195B157 + (PRA and Risk-Informed Decision Making at the NRC: Some Trends and Challenges (Mev Lecture))
- ML20105A904 + (PRA for North Anna Power Station Svc Water Preservation Project,Part 1, Supplemental Rept)
- ML20094G157 + (PRA of Offsite Releases Initiated by Toxic Chemical Release, Final Rept)
- ML20153G209 + (PRA of Various Test Methods & Design Options Concerning Specific Containment Penetrations)