ML24311A185

From kanterella
Jump to navigation Jump to search
PRA Counterparts - Pcc Update - 8 NOV 2024
ML24311A185
Person / Time
Issue date: 11/07/2024
From: Antonios Zoulis
NRC/NRR/DRA/APOB
To:
References
Download: ML24311A185 (7)


Text

PRA Counterparts Meeting PRA Configuration Control (PCC) Insights November 7 - 8, 2024 Antonios Zoulis Office of Nuclear Reactor Regulation Division of Risk Assessment

2 Agenda

  • Milestones
  • Recent Activity
  • 2024 Operating Experience Smart Sample (OpESS) Summary

3 Issued Reports on Tabletops and Conducted public meetings with Industry Stakeholders Mar/Jun 2023 Developed Working Group recommendations for near-term path forward and Obtained NRC Mgt.

Alignment on Proposal Feb/Jun 2023 PCC Project Milestones Issued Memo to Establish Cross-Regional Review Panels and SDP Guidance Jun 2024 Started OpESS Gather Data June 2024 Ongoing Public meetings on PCC SDP and gathered feedback from Industry Stakeholders Mar/Apr and Jun 2024 Conducted Regional KM Session on OpESS Jan 2024 Issue near-term oversight guidance (OpESS)

Jan 2024 Revise OpESS as necessary/

if needed 2026 Develop long-term PCC oversight process 2026 / 2027

4 Recent Activity

Significance Determination Process (SDP) Guidance (Enclosure 2)

Minor / More-than-Minor Examples (ML24152A029)

  • Issued Publicly Available Redacted Cross Regional Panel (CRP) Forms:

Formal CRP: Fire Protection Team Inspection (FPTI) - Minor, (ML24308A001)

Modified CRP: Resident Problem Identification and Resolution (PI&R) -

No Performance Deficiency (PD), Observation documented, (ML24308A002)

5 OpESS - 2024 Summary Performed 6 times total:

5 - Team Inspections across 3 Regions (CETI, FPTI)

1 - Resident Quarterly Inspection (PI&R)

APOB Tracking use and general comments/assessments So far, generally good assessments:

Reasonable programs in place (proceduralized, tracking databases, etc.)

Some minor program gaps, with proceduralized links between PRA and Mods/Operations procedures.

Performed 2 Cross Regional Panels:

Minor issue (FPTI), initially proposed as Green

Modified Panel for an Observation documented in a report (no PD)

6 OpESS Status and Future Minimal remaining opportunities remaining in 2024.

2025 will see a lot of team inspection activity, Potentially 18 or more opportunities (which will be informed by approved risk-informed initiatives), plus any resident samples.

Currently no proposed OpESS changes for 2025, however, will reassess for 2026.x

7 Discussion and Q&A