PRA Counterparts Meeting PRA Configuration Control (PCC) Insights November 7 - 8, 2024 Antonios Zoulis Office of Nuclear Reactor Regulation Division of Risk Assessment
2 Agenda
- Milestones
- Recent Activity
- 2024 Operating Experience Smart Sample (OpESS) Summary
- OpESS Status and Future
3 Issued Reports on Tabletops and Conducted public meetings with Industry Stakeholders Mar/Jun 2023 Developed Working Group recommendations for near-term path forward and Obtained NRC Mgt.
Alignment on Proposal Feb/Jun 2023 PCC Project Milestones Issued Memo to Establish Cross-Regional Review Panels and SDP Guidance Jun 2024 Started OpESS Gather Data June 2024 Ongoing Public meetings on PCC SDP and gathered feedback from Industry Stakeholders Mar/Apr and Jun 2024 Conducted Regional KM Session on OpESS Jan 2024 Issue near-term oversight guidance (OpESS)
Jan 2024 Revise OpESS as necessary/
if needed 2026 Develop long-term PCC oversight process 2026 / 2027
4 Recent Activity
- Issued OpESS for PCC (ML23255A006)
- Issued PCC Cross Regional Panel Charter (ML24081A131):
Significance Determination Process (SDP) Guidance (Enclosure 2)
Minor / More-than-Minor Examples (ML24152A029)
- Issued Publicly Available Redacted Cross Regional Panel (CRP) Forms:
Formal CRP: Fire Protection Team Inspection (FPTI) - Minor, (ML24308A001)
Modified CRP: Resident Problem Identification and Resolution (PI&R) -
No Performance Deficiency (PD), Observation documented, (ML24308A002)
5 OpESS - 2024 Summary Performed 6 times total:
5 - Team Inspections across 3 Regions (CETI, FPTI)
1 - Resident Quarterly Inspection (PI&R)
APOB Tracking use and general comments/assessments So far, generally good assessments:
Reasonable programs in place (proceduralized, tracking databases, etc.)
Some minor program gaps, with proceduralized links between PRA and Mods/Operations procedures.
Performed 2 Cross Regional Panels:
Minor issue (FPTI), initially proposed as Green
Modified Panel for an Observation documented in a report (no PD)
6 OpESS Status and Future Minimal remaining opportunities remaining in 2024.
2025 will see a lot of team inspection activity, Potentially 18 or more opportunities (which will be informed by approved risk-informed initiatives), plus any resident samples.
Currently no proposed OpESS changes for 2025, however, will reassess for 2026.x
7 Discussion and Q&A