Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20239A056 + (Operating Procedure OP-17-60-016-0, Ultrasonic Thickness Measurement Piping Using Swri Thickness Data Acquisition Sys)
- ML20115H511 + (Operating Procedure OP-402 FPC Crystal River Unit 3 Makeup & Purification Sys, Rev 75)
- ML18081A884 + (Operating Procedure PD-15.7.016, Securing Demineralizer Operations & Dewatering, Revision 0)
- ML13308B644 + (Operating Procedure S-3-5.27,Revision 7, Earthquake)
- ML19250C056 + (Operating Procedure SI-400,Revision 1:surveillance Instruction Re Radioactive Liquid Waste Effluent - Batch Release)
- ML19250C057 + (Operating Procedure SI-401,Revision 1:surveillance Instruction Re Radioactive Liquid Waste Effluent - Continuous Releases - Steam Generator Blowdown)
- ML19250C065 + (Operating Procedure SI-410,Revision 2:surveillance Instruction Re Containment (Upper,Lower,Hot Instrument Room) Purge,Waste Gas Decay Tank Release or Operation of ABGTS or EGTS)
- ML19250C067 + (Operating Procedure SI-417:surveillance Instructions Re Radiation Monitor Setpoint Evaluation - Noble Gases - Gaseous Effluents)
- ML19250C051 + (Operating Procedure TI-18,Revision 1:technical Instruction Re Radiation Monitoring)
- ML19211A143 + (Operating Procedure for Auxiliary Feedwater Sys)
- ML18051A545 + (Operating Procedures Review)
- ML19296C817 + (Operating Procedures for Process Control Program)
- ML20028H115 + (Operating Procedures for Use of GE 8500 (USA/6697/B() Cask)
- ML19249F118 + (Operating QA Plan for Nuclear Generating Stations,Revision 3)
- ULNRC-06562, Operating Quality Assurance Manual (Oqam) Interim Revision 34a + (Operating Quality Assurance Manual (Oqam) Interim Revision 34a)
- EPID:L-2020-LLQ-0000 + (Operating Quality Assurance Manual (Oqam) Interim Revision 34a)
- ULNRC-05852, Operating Quality Assurance Manual (Oqam) Revision 29 + (Operating Quality Assurance Manual (Oqam) Revision 29)
- ML13303B686 + (Operating Quality Assurance Manual (Oqam) Revision 30)
- ULNRC-06327, Operating Quality Assurance Manual (Oqam) Revision 32 + (Operating Quality Assurance Manual (Oqam) Revision 32)
- ML22327A206 + (Operating Quality Assurance Manual (Oqam) Revision 36)
- ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 36 + (Operating Quality Assurance Manual (Oqam) Revision 36)
- ULNRC-05615, Operating Quality Assurance Manual (Oqam), Rev. 026 + (Operating Quality Assurance Manual (Oqam), Rev. 026)
- ML091540099 + (Operating Quality Assurance Manual (Oqam), Rev. 027)
- ULNRC-05328, Operating Quality Assurance Manual (Oqam), Revision 25 + (Operating Quality Assurance Manual (Oqam), Revision 25)
- ML063120132 + (Operating Quality Assurance Manual (Oqam), Revision 25)
- ULNRC-05473, Operating Quality Assurance Manual (Oqam), Revision 26 + (Operating Quality Assurance Manual (Oqam), Revision 26)
- ML091540095 + (Operating Quality Assurance Manual (Oqam), Revision 27)
- ML19302G427 + (Operating Quality Assurance Manual (Oqam) Revision 33a Mark-up, Identifying Changes Through the Use of Strikeovers and Inserts)
- ULNRC-06254, Operating Quality Assurance Manual (Oqam) Revision 31, Oqam Change Notice 15-002 + (Operating Quality Assurance Manual (Oqam) Revision 31, Oqam Change Notice 15-002)
- ML20216A681 + (Operating Quality Assurance Manual Change Revision 34B (EPID L-2020-LLQ-0004 (COVID-19)))
- ML20141L745 + (Operating Quality Assurance Manual Change Revision 34A)
- ULNRC-06177, Operating Quality Assurance Manual Revision 31 + (Operating Quality Assurance Manual Revision 31)
- ULNRC-06340, Operating Quality Assurance Manual Revision 32 Correction + (Operating Quality Assurance Manual Revision 32 Correction)
- ML15035A273 + (Operating Quality Assurance Manual, Rev. 030c)
- ML15035A274 + (Operating Quality Assurance Manual, Rev. 031)
- ULNRC-04844, Operating Quality Assurance Manual, Revision 23 + (Operating Quality Assurance Manual, Revision 23)
- ULNRC-06539, Operating Quality Assurance Manual, Revision 34 + (Operating Quality Assurance Manual, Revision 34)
- ML19302G421 + (Operating Quality Assurance Manual, Revision 34)
- ML20065U275 + (Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1) for Cooper Nuclear Station, Final Technical Evaluation Rept)
- ML20062B299 + (Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2)
- ML22075A083 + (Operating Reactor Business Line Fee Estimates)
- ML19338D906 + (Operating Reactor Event Memo 80-10,forwarding List of LERs Re Events Which Result in Containment Floor Flooding & Diagram of Rcs.Water on Containment Floor Is Only Significant During Major LOCA)
- ML16138A447 + (Operating Reactor Event Memo 80-18.Ultrasonic Test Technique Recommended for Use Instead of ASME Section 5 for Future Bolts & Studs Examinations)
- ML19240B431 + (Operating Reactor Event Memo 81-31:on 810102,plant Equipment Operator Inadvertently Opened Dc Main Feeder Breaker Causing Loss of One Redundant Dc Emergency Sys.Procedures Re Loss of Main Dc Bus Have Been Revised to Reflect New Info)
- ML19330C166 + (Operating Reactor Event Memorandum 80-03 Re Possible Cracks in 6-inch to 5-inch Eccentric Reducers in Core Spray Sys 2. Operation Permitted for One Full Cycle.Pipe Indications Will Be Inspected During Refueling Outage)
- ML011280163 + (Operating Reactor Licensing Action Estimates, Dated April 2, 2001)
- ML20053E769 + (Operating Reactor Licensing Actions Summary.Data as of April 30,1982.(Orange Book))
- ML22087A403 + (Operating Reactor Licensing Resource Estimator - Data Sheet)
- ML20077B854 + (Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept)
- ML17255A937 + (Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements,Westinghouse Owners Group,WCAP-9804, Technical Evaluation Rept)
- ML20076M335 + (Operating Reactor PORV Repts (F-37),TMI Action Plan Requirements,C-E Owners Group (CEN-145), Technical Evaluation Rept)