Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 2020-04, Operating Experience Regarding Failure of Buried Fire Protection Main Yard Piping + (Operating Experience Regarding Failure of Buried Fire Protection Main Yard Piping)
- Information Notice 2018-03, Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions + (Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions)
- Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities + (Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities)
- Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities + (Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities)
- Information Notice 2023-04, Operating Experience Related to Fire Events at Decommissioning Nuclear Power Plants in the United States + (Operating Experience Related to Fire Events at Decommissioning Nuclear Power Plants in the United States)
- Information Notice 2021-03, Operating Experience Related to the Duane Arnold Energy Center Derecho Event on August 10, 2020 + (Operating Experience Related to the Duane Arnold Energy Center Derecho Event on August 10, 2020)
- Information Notice 2022-02, Operating Experience Related to the Unexpected Loss of Operating Security Power Due to Inadequate Testing and Maintenance + (Operating Experience Related to the Unexpected Loss of Operating Security Power Due to Inadequate Testing and Maintenance)
- ML18176A188 + (Operating Experience Request for Additional Information for Electric Power Research Institute Topical Report MRP-227, Revision 1 (CAC No. MF7223; EPID L-2016-TOP-0001))
- ML20236X131 + (Operating Experience Review of Failures of Power Operated Relief Valves and Block Valves in Nuclear Power Plants)
- ML102250279 + (Operating Experience Smart Sample (OpESS) FY2010-01 Recent Inspection Experience for Components Installed Beyond Vendor Recommended Service Life)
- ML102250302 + (Operating Experience Smart Sample (OpESS) FY2010-02 Sample Selections for Reviewing Licensed Operator Examinations and Training Conducted on the Plant-Referenced Simulator)
- ML20235R789 + (Operating Experience Summary Rept for 1986)
- ML050840064 + (Operating Experience Table)
- ML19257B066 + (Operating Experience W/Bwr Control Rod Drive Collet Retainer Tubes)
- ML20215L712 + (Operating Experience and AGING-SEISMIC Assessment of Battery Chargers and Inverters)
- ML20138R506 + (Operating Experience and AGING-SEISMIC Assessment of Electric Motors)
- ML20205N888 + (Operating Experience and Aging Assessment of Component Cooling Water Systems in Pressurized Water Reactors)
- ML20195H846 + (Operating Experience and Aging Assessment of Motor Control Centers)
- ML20058J373 + (Operating Experience of Atomic Power Plant Units in 1987, Unscheduled Shutdowns & Load Shedding of Units. Pages 3 & 7 Missing)
- ML14219A476 + (Operating Experience on Initial Test Program)
- ML19305A290 + (Operating Experience:Irradiated Fuel Storage)
- ML20150B626 + (Operating Experiences W/Snubbers)
- ML20262F544 + (Operating Floor - Intermediate Building Elev 355 Ft Section A-P)
- ML20262F539 + (Operating Floor - Turbine Building - Elev 355 Ft)
- ML20038A640 + (Operating Guidelines for High Point Vents During Small Break Transients)
- ML19323F173 + (Operating Guidelines for Once-Through Steam Generator Rupture. Steam Generator Overfill Guidelines & Assessment of Licensed Operator Errors Encl)
- ML20024B415 + (Operating Guidelines for Small Breaks)
- ML19210E367 + (Operating Guidelines for Small Breaks)
- ML20024B374 + (Operating Guidelines for Small Breaks for Oconee 1,2 & 3, TMI-1 & TMI-2,Crystal River 3 & Rancho Seco I)
- 3F0506-06, Operating Highlights, Electric and ISP Operations + (Operating Highlights, Electric and ISP Operations)
- 05000247/FIN-2013011-01 + (Operating IP Units 2 and 3 in violation of site TS requirements after the Chemistry manager identified that the fuel oil in the 22 FOST and the RFOST exceeded limits)
- ML20058J252 + (Operating Indicators of NPP Characterizing Operating Safety & Use of Indicators of Wao Npp)
- 05000331/FIN-2011002-01 + (Operating Instruction did not Include Adequate Criteria Prior to Removing Plant Process Computer from Service)
- ML20085A533 + (Operating Instruction for stuck-open Porv,Per IE Bulletin 79-05)
- ML11242A082 + (Operating Instruction, Revision 34)
- ML11242A233 + (Operating Instruction, Revision 47)
- ML13323A260 + (Operating Instructions for SSH-3/FBA-13 Seismic Scram & Trip Sys)
- ML16221A553 + (Operating JPMs)
- ML16217A310 + (Operating JPMs)
- ML070100446 + (Operating License & Technical Specification/Licensee Controlled Specification, Amd 206/198 & Amd 207/199 B06-07)
- ML063320186 + (Operating License & Technical Specifications/Licensee Controlled Specifications)
- ML081550421 + (Operating License & Technical Specification/Licensee Controlled Specifications, Change L08-006, List of Effective Pages)
- ML080370596 + (Operating License & Technical Specification/License Controlled Specification Units 2 & 3 TS & LCS Loep with Ndms Rev. 0)
- ML16293A200 + (Operating License Amendment 251 Changed Pages)
- ML20209A126 + (Operating License Amendment Index)
- ML020300317 + (Operating License Amendment Request Involving the Post-LOCA Containment Hydrogen Monitoring System)
- 2CAN110204, Operating License Amendment Request to Modify Steam Generator Tube Inspection Frequency. Corrected Copy + (Operating License Amendment Request to Modify Steam Generator Tube Inspection Frequency. Corrected Copy)
- GNRO-2009/00059, Operating License Amendment Request, Cyber Security Plan and Implementation Schedule + (Operating License Amendment Request, Cyber Security Plan and Implementation Schedule)
- GNRO-2010/00047, Operating License Amendment Withdrawal and Request, Cyber Security Plan + (Operating License Amendment Withdrawal and Request, Cyber Security Plan)
- ML19283B795 + (Operating License Antitrust Review Info & Amend 1 to CPPR-83)
- ULNRC-04765, Operating License Appendix B Report Unanticipated Cooling Tower Basin Ph Excursion + (Operating License Appendix B Report Unanticipated Cooling Tower Basin Ph Excursion)
- ML092440217 + (Operating License Application Review - Environmental Scoping)