Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19205A505 + (NER035 - U.S. Department of Commerce, National Bureau of Standards, Nbs Special Publication 577, Development of a Probability Based Load Criterion for American National Standard A58 (1980))
- ML19205A508 + (NER038 - Gocevski, V., Pathologies/Degradation Mechanisms Experienced by Hydro-Quebec During the Evaluation of Gentilly-2 NPP, Report Submitted to Ascet, (June 2015))
- ML19205A514 + (NER043 - NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition Chapter 3 - Design of Structures and Components, Equipment, and Systems 3.7.2, Rev. 4 (Sept. 2013))
- ML19205A515 + (NER044 - Seabrook Station Unit 1, Updated Final Safety Analysis Report (UFSAR) (Rev. 19) (2.5.2.5 Only))
- ML19205A516 + (NER046 - Seabrook Mechanical Maintenance Procedure MS0517.51, Installation of Geokon Snap-Ring Borehole Extensometers, Rev. 0 (Feb. 2016) (Cover & Pages 13-19))
- ML19205A517 + (NER047 - N. Ezell Et Al., Experimental Collaboration for Thick Concrete Structures with Alkali-Silica Reaction (2018))
- ML19205A518 + (NER048 - L. Phan, Structural Performance of NPP Concrete Structures Affected by Alkali-Silica Reaction (Asr), Slides for NRC Regulatory Information Conference Session TH27 (2018))
- ML20328A301 + (NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020))
- ML20266F885 + (NES-1 Transport Package)
- ML091740445 + (NET-264-03, Revision 1, Characterization of Boraflex Panel Degradation in the Peach Bottom Unit 2 Spent Fuel Pool Projected to May 2010 (Non-Proprietary Version))
- GNRO-2011/00025, NET-287-01, Revision 1, BADGER Test Campaign at Grand Gulf Nuclear Station + (NET-287-01, Revision 1, BADGER Test Campaign at Grand Gulf Nuclear Station)
- ML081820126 + (NET-290-01, Evaluation of Nine Mile Point 1 Boraflex Spent Fuel Racks with 7x7, 8x8 and 9x9 Fuel Assemblies Taking No Credit for Boraflex for Reactivity Control, Pages 13 Through 31)
- ML15336A084 + (NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage)
- NL-14-083, NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels + (NET-300067-01, Rev. 0, Criticality Safety Analysis of the Indian Point Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels)
- ML15062A200 + (NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels. (Non-Proprietary))
- ML13038A356 + (NET-313-01P, Second BADGER Test Campaign at Palisades Nuclear Plant)
- ML102250420 + (NET-346-01, Badger Test Campaign at Turkey Point, Unit 4)
- ML062140122 + (NF-BEX-06-167-NP, Rev, 2, Dresden Unit 3 Cycle 20 Slmcpr)
- ML070230540 + (NF-BEX-06-281, Rev 0, Quad Cities, Unit 1 Cycle 20 SLMCPR, NP-Attachement)
- ML18058A942 + (NFPA 805 Amendment Application Transition License Condition)
- ML12178A030 + (NFPA 805 Conference Call Attach with Brunswick Nuclear Plant Units 1 and 2 NFPA805 Pre-Application Call with NRC)
- ML18180A260 + (NFPA 805 FAQ 10-0059 - NFPA 805 Monitoring)
- ML18208A450 + (NFPA 805 FAQ 10-0059 - NFPA 805 Monitoring July 24)
- ML18208A409 + (NFPA 805 FAQ 10-0059 Closure)
- ML18102B464 + (NFPA 805 FY2017 Additional Information)
- ML25311A107 + (NFPA 805 Fire Protection Program Design Basis Document)
- ML24159A273 + (NFPA 805 Fire Protection Program Manual (Nfppm), Rev. 6)
- ML22340A159 + (NFPA 805 Fire Protection Program Manual (Nfppm), Revision 5)
- ML14051A388 + (NFPA 805 Fpra F&O Tables)
- ML14051A397 + (NFPA 805 IE PRA F&O Tables)
- ML121450014 + (NFPA 805 LAR Status Matrix - May 2012)
- ML13234A385 + (NFPA 805 License Amendment Request Pre-Application Meeting with NRC Staff)
- L-PI-13-093, NFPA 805 License Amendment Request- Milestone Schedule for Submittal of Supplement + (NFPA 805 License Amendment Request- Milestone Schedule for Submittal of Supplement)
- ML120260372 + (NFPA 805 Monitoring)
- ML102740257 + (NFPA 805 Non-Pilot Workshop Preliminary Topics)
- ML072610455 + (NFPA 805 Observation Visit Trip Report)
- NLS2012086, NFPA 805 Online Reference Portal + (NFPA 805 Online Reference Portal)
- ML16208A083 + (NFPA 805 PRA Update FAQ 16-0076)
- ML16208A082 + (NFPA 805 PRA Update FAQ 16-0076 7/25/16 to NEI (002))
- ML12251A010 + (NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Supplement 1 to LAR 2012-09, License Amendment Request for Revision to License Condition 3.D, Transition.)
- ML102980588 + (NFPA 805 Pilot License Amendment Request Review Schedule Update, October 2010)
- ML090840360 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, March, 2009, Revised)
- ML110210565 + (NFPA 805 Pilot License Amendment Request Review Schedule Update, January 2011)
- ML090490612 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, February, 2009)
- ML091760359 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009)
- ML100539557 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, January, 2010)
- ML102040147 + (NFPA 805 Pilot License Amendment Request Review Schedule Update, July 2010)
- ML091420129 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, May 2009)
- ML093240058 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009)
- ML103080357 + (NFPA 805 Pilot License Amendment Request Review Schedule Update, November 2010)
- ML083400181 + (NFPA 805 Pilot License Amendment Request Review and Infrastructure Update)