Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19351C942 + (Long-Range Forecast of Electric Power Needs & Requirements, Annual Suppl 1-D,1980-89, Vol 1)
- ML19351C943 + (Long-Range Forecast of Electric Power Needs & Requirements, Annual Suppl 1-D,1980-89, Vol 1)
- ML19351C944 + (Long-Range Forecast of Electric Power Needs & Requirements, Annual Suppl 1-D,1980-89, Vol 2)
- ML031010013 + (Long-Range Planning Program, Annual Update of Integrated Schedule for 2002)
- ML021580005 + (Long-Range Planning Program, Annual Update of Integrated Schedule)
- ML20098D014 + (Long-Range Projection of Power Loads & Resources for Thermal Planning,West Group Area 1973-74 Through 1992-93)
- ML14206B001 + (Long-Term Chemical Effects Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNP-CHLE-011, Revision 2)
- ML032721450 + (Long-Term Containment Analysis, Revision 2)
- ML19211D447 + (Long-Term Coolability of Partially Blocked Core, Experimental & Theoretical Results)
- ML20210Q685 + (Long-Term Cooling Analysis for South Texas Project. Related Correspondence)
- ML18166A293 + (Long-Term Core Cooling for the APR1400)
- ML20132F214 + (Long-Term Corrosion Test Program of Nuclear Steam Generator Tubing Samples from TMI-1, Vols 1 & 2)
- ML20140E644 + (Long-Term Corrosion Test Program of Nuclear Steam Generator Tubing Samples from TMI-1 to Gpu Nuclear, Second Interim Rept)
- ML19259B948 + (Long-Term Evaluation of Effects of Exposure to Dow NS-1 Solvent on Stress Corrosion Cracking of Sensitized Type 304 Stainless Steel in Simulated BWR Environ)
- ML20148E640 + (Long-Term Follow-Up After Accidental Gamma Irradiation from Co-60 Source)
- ML20118C424 + (Long-Term Initiation Time for Stress-Corrosion Cracking of Alloy 600 and Stainless Steel: Review and Analysis for Nuclear Application)
- ML20126C572 + (Long-Term Inservice Exam Plan for Class 1,Class 2 & Class 3 Sys Components, Vol 1-3,final Plan)
- ML20126C567 + (Long-Term Inservice Exam Plan for Class 1,Class 2 & Class 3 Sys Components, Vol 1-3,final Plan)
- ML20126C575 + (Long-Term Inservice Exam Plan for Class 1,Class 2 & Class 3 Sys Components, Vol 1-3,final Plan,Apps)
- ML20213F363 + (Long-Term Inservice Exam Plan for Class 1,Class 2 & Class 3 Component Supports for Clinton Power Station,Unit 1, First 10-yr Interval Final Plan)
- ML20063A477 + (Long-Term Iodine Control in Reactor Containment Bldgs Using C-E Iodine Removal Sys)
- ML090560470 + (Long-Term Monitoring Plan Position Paper)
- ML18052B466 + (Long-Term Operability Program)
- ML20116N688 + (Long-Term Pipe Support Insp & Evaluation Program Plan)
- ML20151U155 + (Long-Term Plan for Code Qualification of Seismic Class 1S Pipe Supports Cooper Nuclear Station)
- ML20073H193 + (Long-Term Program)
- ML20151S385 + (Long-Term Program:Semi-Annual Rept)
- ML19324F851 + (Long-Term Replacement Steam Dryer Inspection Plan)
- ML20212P642 + (Long-Term Seismic Program Rept on Nrc/Pg&E Geology/Seismology/Geophysics Workshop Held on 861021 & 22, San Francisco,Ca)
- ML12255A200 + (Long-Term Stability Analysis Methodology)
- ML20035F570 + (Long-Term Stability of High-Level Nuclear Waste Container Matls:I - Thermal Stability of Alloy 825)
- ML19351G513 + (Long-Term Stability of Union Carbide Tailings Piles at Uravan,Co, Final Draft)
- ML19119A120 + (Long-Term Steam Dryer Inspection Plan at EPU Conditions)
- ML20119A885 + (Long-Term Steam Dryer Inspection Plan at EPU Conditions)
- ML20154C332 + (Long-Term Surveillance & Maint Program,Long-Term Radon Mgt for Cheney Disposal Cell Operations & Maint Plan)
- RIS 2011-11, Long-Term Surveillance Charge for Conventional or Heap Leach Uranium Recovery Facilities Licensed Under 10 CFR Part 40 + (Long-Term Surveillance Charge for Conventional or Heap Leach Uranium Recovery Facilities Licensed Under 10 CFR Part 40)
- ML20059H779 + (Long-Term Surveillance Plan for Lowman,Id,Disposal Site)
- ML20035A339 + (Long-Term Surveillance Plan for Tuba City,Az Disposal Site Final. W/One Oversize Encl)
- ML20199H271 + (Long-Term Svc Program Confirmatory Analysis of San Onofre Nuclear Generating Station 1 Piping & Pipe Supports)
- ML13311A398 + (Long-Term Svc Seismic Reevaluation Program:Status Rept for All Action Items Identified from NRC)
- ML13311A400 + (Long-Term Svc Seismic Reevaluation Program:Technical Basis for Piping Strain Limits & Development of Linear,Elastic Analysis Methodology)
- ML13324A745 + (Long-Term Svc Seismic Reevaluation Program,Technical Basis of Stress- Strain Correlation)
- ML20080A333 + (Long-Term Test Program of Nuclear Steam Generator Tubing Samples from TMI-1, First Interim Rept)
- ML20149K886 + (Long-Term Testing of Supernatant Cement-Waste Form)
- ML20064J483 + (Long-term Cooling Equipment Mod,Bimonthly Status Rept for Jan-Feb 1979.Bechtel Corp Preparing Final Design Details for long-term Cooling Mods.Mods Scheduled for 1981 Refueling Outage)
- ML20262D710 + (Longitudinal Section Thru as Shipped Steam Generator)
- 05000266/FIN-2013002-12 + (Longstanding Issues Regarding Thermal Performance Testing Were Not Corrected)
- 05000275/FIN-2014007-03 + (Longstanding Uncompensated Nonconforming Condition)
- ML19246A770 + (Longview Power, LLC, Notice of Expiration of License 47-31385-01)
- ML19249C510 + (Look at Alternate Core Disruption Accidents in Lmfbrs)
- ML19318C266 + (Looking But Not Seeing Federal Nuclear Power Plant Insp Program)