Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18023A795 + (License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition)
- ML112070991 + (License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 and Make an Administrative Change to Technical Specification Surveillance Requirement 3.6.2.1)
- ML18218A173 + (License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition)
- ML18218A184 + (License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition)
- EPID:L-2018-LLA-0221 + (License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition)
- ML21356B704 + (License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition)
- LR-N09-0042, License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies + (License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies)
- AEP-NRC-2014-04, License Amendment Request to Revise the Cyber Security Implementation Schedule + (License Amendment Request to Revise the Cyber Security Implementation Schedule)
- ML092180668 + (License Amendment Request to Revise the Action Requirement for and Inoperable Control Room Envelope Boundary and to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7.)
- ML24255A096 + (License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285))
- RBG-48323, License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink + (License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink)
- NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 + (License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5)
- EPID:L-2022-LLF-0000 + (License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5)
- L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption + (License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption)
- AEP-NRC-2016-19, License Amendment Request to Revise the Cyber Security Plan Implementation Schedule + (License Amendment Request to Revise the Cyber Security Plan Implementation Schedule)
- NL-15-0441, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3 + (License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3)
- RS-18-023, License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) + (License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs))
- EPID:L-2018-LLA-0052 + (License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs))
- L-MT-17-065, License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information + (License Amendment Request to Revise the Emergency Action Level Scheme - Supplement and Response to Requests for Additional Information)
- ML23304A268 + (License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023)
- NL-20-0843, License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time for Unit 1 and Swing Emergency Diesel Generators + (License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC Sources - Operating, for One-Time Extension of Completion Time for Unit 1 and Swing Emergency Diesel Generators)
- ML14310A187 + (License Amendment Request to Revise the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds)
- NL-20-0949, License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 2 + (License Amendment Request to Revise, Technical Specifications to Adopt TSTF-541, Revision 2)
- L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 + (License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0)
- L-2015-079, License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps + (License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps)
- L-15-026, License Amendment Request to Steam Generator Technical Specifications + (License Amendment Request to Steam Generator Technical Specifications)
- ML042040177 + (License Amendment Request to Support 24-month Fuel Cycles, Drift Analysis (Instrumentation and Controls))
- ML042040175 + (License Amendment Request to Support 24-month Fuel Cycles, Drift Study Cross Reference)
- ML042040190 + (License Amendment Request to Support 24-month Fuel Cycles, Current Monticello TS Bases Pages Marked Up with Proposed Changes)
- ML042040195 + (License Amendment Request to Support 24-month Fuel Cycles, (Provided for Information Only) Revised Monticello TS Bases Pages)
- ML042040174 + (License Amendment Request to Support 24-month Fuel Cycles, NMCs Interpretation of the NRC Comments on the Staff Review of EPRI Technical Report 103335, Guidelines for Instrument Calibration Extension/Reduction..)
- ML042040187 + (License Amendment Request to Support 24-month Fuel Cycles, Revised Monticello TS Pages)
- ML042040169 + (License Amendment Request to Support 24-month Fuel Cycles, Methodology Summary and Compliance with Generic Letter 91-04)
- ML042040184 + (License Amendment Request to Support 24-month Fuel Cycles, Current Monticello Technical Specification Pages Marked Up with Proposed Changes)
- ML042040182 + (License Amendment Request to Support 24-month Fuel Cycles, Bases for Change Request for Technical Specifications and Surveillance Requirements Interval Extensions)
- L-MT-04-036, License Amendment Request to Support 24-month Fuel Cycles + (License Amendment Request to Support 24-month Fuel Cycles)
- ML042040166 + (License Amendment Request to Support 24-month Fuel Cycles)
- 2CAN070402, License Amendment Request to Support Cycle 18 Core Reload Arkansas Nuclear One, Unit 2 + (License Amendment Request to Support Cycle 18 Core Reload Arkansas Nuclear One, Unit 2)
- W3F1-2008-0061, License Amendment Request to Support Implementation of Extended In-Service Inspection Interval + (License Amendment Request to Support Implementation of Extended In-Service Inspection Interval)
- ML091950355 + (License Amendment Request to Support Plant Modifications to the Nuclear Instrumentation System)
- ML080320284 + (License Amendment Request to Support Use of M5 Alloy)
- LIC-05-0089, License Amendment Request to Support Use of M5 Fuel Cladding, and 10 CFR 50.46 and 10 CFR Appendix K Exemption Request + (License Amendment Request to Support Use of M5 Fuel Cladding, and 10 CFR 50.46 and 10 CFR Appendix K Exemption Request)
- ML053070018 + (License Amendment Request to Support Use of M5 Fuel Cladding, and 10 CFR 50.46 and 10 CFR 50 Appendix K Exemption Request)
- ML110120630 + (License Amendment Request to Support Use of Areva Nuclear Fuel, Slides from 1/12/2011 Meeting)
- 1CAN090402, License Amendment Request to Support Use of M5 Fuel Cladding and Bhtp Departure from Nucleate Boiling Correlation, and 10 CFR 50.46 and 10 CFR Appendix K Exemption Request + (License Amendment Request to Support Use of M5 Fuel Cladding and Bhtp Departure from Nucleate Boiling Correlation, and 10 CFR 50.46 and 10 CFR Appendix K Exemption Request)
- ML052770174 + (License Amendment Request to Support Use of Areva Realistic Large Break Loss of Coolant Accident Methodology)
- 1CAN070603, License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool + (License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool)
- NL-09-1861, License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report + (License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report)
- MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors + (License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors)
- ML102660031 + (License Amendment Request to Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Removal of the Superceded TS and Bases Requirements)
- GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level + (License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level)