Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095J306 + (Initial Part 21 Rept Re Defectively Installed Bolting in Emergency Diesel Generator Bldg Internal Wall Seismic Supports.Repairs to Reestablish Seismic Qualification of Walls Continuing & Emergency Buses Declared Inoperable)
- ML18010A507 + (Initial Part 21 Rept Re Deficiency in Actuator to Main Feedwater Preheater Bypass Isolation Valves.On 920107,2 H Surveillance Interval Was Commenced to Verify Actuator Components Were Functioning Properly)
- ML18100B191 + (Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability)
- ML20097H158 + (Initial Part 21 Rept Re Failure of Gh Bettis Actuators Used at Plant.Gh Bettis Has Ordered Replacement SOVs & Pilot Valves for Installation at Butterfly Valve Mfg,C&S Valve)
- ML20056E677 + (Initial Part 21 Rept Re GE AK-25 Circuit Breakers w/RMS-9 Overcurrent Trip Devices.On 930731,three Spurious Trips of Subj Breakers Experienced While in Refueling Shutdown.Addl Info Re Issue Will Be Provided within 30 Days)
- ML17263A323 + (Initial Part 21 Rept Re High Component Cooling Water Flow Results in flow-induced Vibration of HX Tubes Mfg by Atlas Industrial Mfg Co & Subsequent Tube Degradation.Tubes W/ Through Wall Indications Greater than 70% Plugged)
- ML17265A655 + (Initial Part 21 Rept Re Mfg Deficiency in Replacement Turbocharger for B EDG Supplied by Coltec Industries. Deficiency Consisted of Missing Drain Port in Intermediate Casing.Required Oil Drain Port Machined Open)
- BSEP-93-0030, Initial Part 21 Rept Re Possible Mfg Defects Associated W/ Westinghouse Type HMCP150 & Type Hfd Breakers Resulting in Possibility That Breaker Contacts May Not Open During Trip Conditions.Evaluation of Corrective Action Underway + (Initial Part 21 Rept Re Possible Mfg Defects Associated W/ Westinghouse Type HMCP150 & Type Hfd Breakers Resulting in Possibility That Breaker Contacts May Not Open During Trip Conditions.Evaluation of Corrective Action Underway)
- ML18153B060 + (Initial Part 21 Rept Re Steam Drive AFW Pump Governor Valve Mfg by Dresser-Rand.Maint Procedure to Stroke Governor Valve Stem Performed Weekly & Monitoring of Corrosion Build Up in Gland Seal Leakoff Area Performed Weekly)
- ML17309A580 + (Initial Part 21 Rept Re air-operated Butterfly Valve Mfg by Fisher Controls Co.Actuator Lever Altered)
- ML20101M892 + (Initial Part 21 Rept Re non-segregated Phase Electrical Bus Duct Mfg in 1972.Initially Reported on 920427.Detailed Calculations Being Done by FPC to Evaluate Momentary Fault Current Against Supplied Ratings of All Bus Sections)
- ML19317E792 + (Initial Prehearing Statement of Municipalities of High Point,Lexington,Monroe,Shelby,Albemarle,Drexel,Granite Falls,Landis & Lincolnton,Nc.Certificate of Svc Encl)
- IR 05000423/1985009 + (Initial Preoperational Security Program Review Insp Rept 50-423/85-09 on 850211-15.Areas Reviewed:Development of Physical Security Plan,Security Organization,Records & Repts,Testing & Maint & Physical Barriers)
- ML20134A608 + (Initial QA Audit Insp Rept 50-389/71-01 on 710929-1001.Major Areas Inspected:Qa Activities)
- ML20053E768 + (Initial Quantification of Human Error Associated with Specific Instrumentation and Control System Components in Licensed Nuclear Power Plants)
- ML19341B099 + (Initial Quantification of Human Errors Associated with Reactor Safety System Components in Licensed Nuclear Power Plants)
- ML040690107 + (Initial RO Examination 02/05/2004)
- ML020730392 + (Initial RO Examination 02/2002)
- ML021350615 + (Initial RO Examination 04/2002)
- ML041600273 + (Initial RO Examination 05/2004)
- ML032480025 + (Initial RO Examination 08/2003)
- ML033220587 + (Initial RO Examination 09/2003)
- ML032970307 + (Initial RO Examination 09/2003)
- ML040710361 + (Initial RO Examination 09/2003 (Revised))
- ML032890580 + (Initial RO Examination 09/2004)
- ML040130815 + (Initial RO Examination 12/2003)
- ML032180779 + (Initial RO Retake Examination 07/2003)
- ML060830455 + (Initial RO and SRO Written Examination)
- ML17046A604 + (Initial Re-Take Operator Licensing Operating Test Approval)
- IR 05000336/2017302 + (Initial Re-take Operator Licensing Examination Report 05000336/2017302)
- ML13088A224 + (Initial Recommendation of the PRB Riverkeeper 2.206 Petition of November 14, 2012)
- ML20308A389 + (Initial Report on Challenges, Lessons Learned and Best Practices from the 2020 Covid-19 Public Health Emergency)
- ML12269A466 + (Initial Request for Information Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000285-12-011)
- ND-20-1280, Initial Request for NRC Form 311, Quality Assurance Program for Radioactive Material Packaging + (Initial Request for NRC Form 311, Quality Assurance Program for Radioactive Material Packaging)
- ML20210C269 + (Initial Response of B&W Owners Group to Petition Filed Under 10CFR2.206 by Ucs.* Request for Immediate Suspension Should Be Summarily Denied.W/Certificate of Svc)
- ML20050C008 + (Initial Response to ASLB 820310 Memorandum & Order Approving Stipulations & Requesting Info.Info Order Should Apply to Potential Intervenors as Well as to Applicant.Certificate of Svc Encl)
- ML20052F402 + (Initial Response to Applicant 820422 Motion for Protective Order.Aslb Should Defer Ruling on Motion Until Notified of Parties Inability to Resolve Issues & State of Il Filed Substantive Response.Certificate of Svc Encl)
- ML20132E301 + (Initial Response to Applicant 850628 Current Mgt Views & Mgt Plan for Resolution of All Issues.Applicant Assessment of Current State of Record Not Accepted.Certificate of Svc Encl.Related Correspondence)
- ML082800172 + (Initial Response to NRC Generic Letter (GL) 2008-01: Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- NLS2003117, Initial Response to NRC Generic Letter 2003-01 + (Initial Response to NRC Generic Letter 2003-01)
- ML033210207 + (Initial Response to NRC Generic Letter 2003-01)
- ML081360101 + (Initial Response to NRC Generic Letter 2008-01: Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Dated January 11, 2008)
- ML053070350 + (Initial Response to NRC Generic Letter 97-01: Degradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations)
- ML18221A120 + (Initial Responses from Tribes to NRC Letter Regarding Section 106 Consultation for Proposed Honeywell License Renewal)
- ML20045D418 + (Initial Results of the Influence of Biaxial Loading on Fracture Toughness)
- IR 05000277/1993004 + (Initial Retake & Requalification Exam & Requalification Program Evaluation Repts 50-277/93-04 & 50-278/93-04 on 930225-0312.Exam Results:Eight Licensed Operators Passed 1993 Requalification Exam & Both Crews Passed in Simulator)
- ML20126E940 + (Initial Retake & Requalification Exam Rept 50-346/OL-92-02 on 921118 & Wk of 921130.Exam Results:All Five ROs & Four SROs Passed All Sections of Requalification Exams)
- ML093640753 + (Initial Retake Exam 2009-302 Draft RO Written Exam)
- ML093640778 + (Initial Retake Exam 2009-302 Final Administrative Documents)
- ML093640789 + (Initial Retake Exam 2009-302 General Correspondence)
- ML091270277 + (Initial Retake Exam Corporate Notification Letter 05000327-09-302 and 05000328-09-302)