Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18136A023 + (Forwards Requests for Relief from ASME Code Requirements Re Inservice Insp & Testing of Pumps & Valves.Oversize Drawings Available in Central Files Only)
- ML20082P284 + (Forwards Requests for Relief from ASME Code Section XI to Permit Machine Welding of Steam Generator Tube Plugs at Facility)
- ML20236G808 + (Forwards Requests for Relief from ASME Code Section XI Requirements,Including Request for Relief from Hydrostatic Testing of Groundwater Monitoring Piping Being Modified & from Hydrostatic Testing Requirements for Listed Welds)
- ML20147B359 + (Forwards Requests for Relief from ASME Section XI Exam Requirements That Would Be Conducted Per Subj Facil Insvc Inspec Prog.Rev Insvc Inspec Prog Reflecting Util Position Will Be Submitted Pending Completion of Prog Dev)
- ML20148C921 + (Forwards Requests for Relief from ASME Section XI Requirements for Plant ISI Program in Accordance W/ 10CFR50.55a(g)(5)(iii))
- B13746, Forwards Requests for Relief from ASME Section XI to Repair Svc Water Sys Components.Description of Actions Taken to Repair Leaks in Piping as Alternative to IWA-7000 Replacement,Prior to Current Outage,Discussed in Encl + (Forwards Requests for Relief from ASME Section XI to Repair Svc Water Sys Components.Description of Actions Taken to Repair Leaks in Piping as Alternative to IWA-7000 Replacement,Prior to Current Outage,Discussed in Encl)
- ML20094H580 + (Forwards Requests for Relief from ASME Section XI Requirements for Inservice Insp Program Covering Reactor Coolant Pumps B,C & D,Boron Injection Tank Upper Head to Shell Weld & SG a tubesheet-to-channel Head Weld)
- AECM-84-0335, Forwards Requests for Relief from ASME Section XI Code Requirements for Inservice Insp of 11 Items.Requests Submitted in Accordance W/Requirements of 10CFR50.55a(g)(5)(IV) + (Forwards Requests for Relief from ASME Section XI Code Requirements for Inservice Insp of 11 Items.Requests Submitted in Accordance W/Requirements of 10CFR50.55a(g)(5)(IV))
- ML20128P551 + (Forwards Requests for Relief from Certain ASME Code Inservice Insp Requirements to Complete First 10-yr Insp Interval of Plant.Approval Requested within 30 Days Due to Preoutage Planning Required for Maint/Refueling Outage)
- ML18139C200 + (Forwards Requests for Relief from Certain ASME Code Section XI Requirements During 10-yr Inservice Insp Outage)
- ML20206H428 + (Forwards Requests for Relief from Certain ASME Section XI Insp Requirements for Class 1 Pump & Valve Internals.Info Provides Code Requirements,Basis for Requesting Relief & Proposed Alternate Exams.Fee Paid)
- ML20148J090 + (Forwards Requests for Relief from Certain Requirements Delineated in Section XI of ASME Boiler & Pressure Vessel Code.First Request Concerns Case in Which Code Required N-2 Mfg Data Form Missing for Listed Component.Fee Paid)
- ML20094M555 + (Forwards Requests for Relief from Inservice Insp Program for Pumps & Valves,Per Generic Ltr 89-04.Immediate Implementation of Request Planned Since Util Lacks Installed Method to Precisely Control Flow for Affected Sys)
- AECM-88-0104, Forwards Requests for Relief from Inservice Insp Plan Requirements of ASME Section Xi,Including Rev 1 to Relief Request I-00007 Re Amount of Exam Coverage Obtainable,Rev 2 to I-00010 & Rev 0 to I-00019 + (Forwards Requests for Relief from Inservice Insp Plan Requirements of ASME Section Xi,Including Rev 1 to Relief Request I-00007 Re Amount of Exam Coverage Obtainable,Rev 2 to I-00010 & Rev 0 to I-00019)
- PY-CEI-NRR-1334, Forwards Requests for Relief from Inservice Exam Program for Class 1,Category B-J Piping Welds 4 Inches or Greater & Class 2,Category C-C integrally-welded Support Attachments for First 10-yr Inservice Insp Interval + (Forwards Requests for Relief from Inservice Exam Program for Class 1,Category B-J Piping Welds 4 Inches or Greater & Class 2,Category C-C integrally-welded Support Attachments for First 10-yr Inservice Insp Interval)
- ML20150E618 + (Forwards Requests for Relief from Listed ASME Section XI Inservice Insp Requirements for Pressurizer Surge Line & Steam Generator Nozzle Radii & Nonregenerative HX CH-E-2)
- B11935, Forwards Requests for Relief from Performing Preservice Insps on Components Listed in .Relief Not Required for Proposed Relief PR-6 Re Pressurizer safe-ends to Nozzle Welds + (Forwards Requests for Relief from Performing Preservice Insps on Components Listed in .Relief Not Required for Proposed Relief PR-6 Re Pressurizer safe-ends to Nozzle Welds)
- ML20237G032 + (Forwards Requests for Relief from Pump Flow Measurement Requirements of ASME Boiler & Pressure Code Section XI & Related Proposed ISI Program Plan Page Revs.Fee Paid)
- U-602566, Forwards Requests for Relief from Requirements of Section XI of ASME Boiler & Pressure Vessel Code,1980 Edition Through Winter 1981 Addenda,W/Re Performance of non-destructive Exam of Welds + (Forwards Requests for Relief from Requirements of Section XI of ASME Boiler & Pressure Vessel Code,1980 Edition Through Winter 1981 Addenda,W/Re Performance of non-destructive Exam of Welds)
- ML20083N037 + (Forwards Requests for Relief from Rev 1 of Inservice Insp Program for ASME Code Class 1,2 & 3 Components.Granting of Proposed Relief Requests by 830901 Requested)
- ML20199B446 + (Forwards Requests for Relief from Section XI of ASME Boiler & Pressure Vessel Code,For Second 10-yr Insp Interval, Identifying Code Requirements Determined to Be Impractical. Fee Paid)
- ML20205Q338 + (Forwards Requests for Renewal or Extension of Exemption from Requirements of 10CFR50.54(w)(i) Re Property Insurance.Fee Paid)
- ML20040A371 + (Forwards Requests for Response to Questions & Comments to Assist Div of Sys Safety in Review of BSAR-205)
- ML18043A834 + (Forwards Requests for Tech Spec Changes)
- ML17342B386 + (Forwards Requests for Temporary Exemption from App J Testing of Reactor Bldg Closed Cooling Water Valves.Exemptions Requested to Accommodate Schedule Requirements.Approval by 860219 Requested)
- ML19282C668 + (Forwards Requests for Updated Financial Info)
- ML20213C773 + (Forwards Requests for WNP-2 FSAR Chapter 13.3 Re Emergency - Planning for Transmittal to Applicant)
- ML20058B224 + (Forwards Requests of Terrebonne Parrish Consolidated Govt & Louisiana Energy & Power Authority for Reevaluation of Finding of No Signification Change)
- ML20217P491 + (Forwards Required 10CFR50.59 Annual Rept for Licenses NPF-37 & NPF-66.Rept Is Being Provided for 1997 Calendar Year & Consists of Descriptions & SE Summaries for Changes to Facility as Described in SAR)
- HL-5687, Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment + (Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment)
- ML17331B330 + (Forwards Required 15 Day Following Completion of Insp Rept on Results of Eddy Current Insp & Repairs Performed on SG Tubes During 1994 Refueling Outage)
- ML20209B934 + (Forwards Required 30 Day Event Rept 99-13 for 990528 Event Involving Liquid UF6 Handling Crane in X-330 Process Bldg Tails Withdrawal Area.Investigation Activities Continuing to Determine Root Cause & Corrective Actions for Event)
- ML20211N895 + (Forwards Required 30 Day Event Rept 99-17,for Event That Resulted from Determination That 13 Sprinkler Sys Associated with High Pressure Fire Water Sys in Process Buildings Were Not Capable of Meeting Operability Requirements)
- ML20199K950 + (Forwards Required 30 Day Written Event Rept 97-22,involving Failure of UF6 Cylinder High Pressure Autoclave Steam Shutoff Safety Sys at Portsmouth Gaseous Diffusion Plant & List of Commitments)
- ML20248M321 + (Forwards Required 30-day Event Rept (Er) 98-13 Re Partial Failure of Plant Air Sys When Two Air Compressors in Bldg C-335 Tripped)
- ML20137N961 + (Forwards Required 30-day Event Rept 97-003,involving Automatic Actuation of Autoclave Water Inventory Control Sys at C-333-A on 970305)
- ML20211H625 + (Forwards Required 30-day Event Rept 97-16 for Occurrence Involving Actuation of Autoclave Shell Steam High Pressure Shutdown Safety Sys in X-342A Bldg at Portsmouth Gaseous Duffusion Plant)
- ML20149D325 + (Forwards Required 30-day Event Rept 97-12,involving Loss of West Normetex Pump UF6 Release Detection Sys in C-310.List of Commitments Made in Rept,Encl)
- ML20211N092 + (Forwards Required 30-day Event Rept 97-17 Re Actuation of Cascade Automatic Data Processing Smoke Detection Sys in X-333 Bldg at Portsmouth Gaseous Diffusion Plant)
- ML20202F209 + (Forwards Required 30-day Event Rept 98-01,involving Actuation of Autoclave 2 East Steam Pressure Control Safety Sys in Building C-337-A on 980320.Revised Rept Targeted to Be Submitted by 980320)
- ML20198J889 + (Forwards Required 30-day Event Rept 98-15 Re Failure of Autoclave Viton O-Ring at Portsmouth Gaseous Diffusion Plant.Revised Rept Is Scheduled for 990330)
- ML20197G880 + (Forwards Required 30-day Event Rept 98-14 Re Event That Resulted from Actuation of Cascade Automatic Data Processing Smokehead in X-330 Tails Area at Portsmouth Gaseous Diffusion Plant.List of Commitments Contained in Rept,Encl)
- ML20204J171 + (Forwards Required 30-day Event Rept 99-03 Re Criticality Accident Alarm Sys Slave Nitrogen Operated Horn Unit Failure at Portsmouth Gaseous Diffusion Plant on 990219)
- ML20210L175 + (Forwards Required 30-day Event Rept 99-15 Re Event That Resulted from Declaration of Alert Emergency Classification at Portsmouth Gaseous Diffusion Plant.Encl 2 Contains List of Commitments Made by Licensee)
- ML20210G339 + (Forwards Required 30-day Event Rept 99-14 Re Actuation of Brake Sys on UF6 Handling Crane at Portsmouth Gaseous Diffusion Plant.Investigation Activities Continuing to Determine Appropriate Corrective Actions)
- ML20137Y094 + (Forwards Required 30-day Event Rept Covering Er 97-06 Re Water Flow Alarm in Central Control Facility Caused by Tool Box Rupturing Sprinkler Sys Pipe)
- ML20207A179 + (Forwards Required 30-day Event Rept ER-99-06 Re Inoperability of Process Gas Leak Detection Heads Required to Be Operational When Operating Above Atmosphere.Licensee Commitments Are Contained in Encl 2)
- ML20199A154 + (Forwards Required 30-day Event Rept ER-97-16 Re Actuations of Autoclave Steam Pressure Control Sys in C-333A. Commitments Made by Util,Encl)
- ML20205P240 + (Forwards Required 30-day Event Rept ER-99-02 Re C-746Q Power Outage Which Disabled C-746Q Criticality Accident Alarm Sys External Warning Lights)
- ML20236X903 + (Forwards Required 30-day Event Rept ER-98-22 Re C-720 Power Outage Which Disabled C-720 Criticality Accident Alarm Sys Beacons)
- ML20236V665 + (Forwards Required 30-day Event Rept ER-98-19 Re Actuation of Water Inventory Control Systems in Bldg C-337-A.List of Commitments Are Not Included in Rept,Since Event Was Isolated Incident)