ACCELERATE) DOCUIVIENTDIST$+UTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9404070253 DOC.DATE: 94/03/15 NOTARIZED: NO DOCKET g FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
(formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION I
RUSSELL,W.T.
Document Control Branch (Document Control Desk)
SUBJECT:
Constitutes required 15 day following completion of insp rept on results of eddy current insp 6 subsequent repairs performed on SG tubes during 1994 Unit 1 Refueling Outage.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES D
A RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB GG/W~
EG FIXE Ol NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACI'HEDOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 14 D
If'I.
f
Indiana Michigan~
PoNIer Company ~
P.O. Box 16631 Columbus, OH 43216 N
AEP'NRC'11660 Donald C. Cook Nuclear Plant Unit 1 Docket No. 50-315 License No.
DPR-58 STEAM GENERATOR TUBE INSPECTIONS 15 DAY REPORT U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 Attn:
W. T. Russell March 30, 1994
Dear Mr. Russell:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Technical Specifications 4.4.5.5(a) and (d),
this letter constitutes the required "15 day following completion of the inspection" report on the results of our eddy current inspection and subsequent repairs performed on the steam generator tubes during the 1994 Unit 1 Refueling Outage.
Eddy current inspection of the Unit 1 steam generator tubes began on February 28, 1994.
All tube inspections and repairs were completed on March 15, 1994.
The inspection included 100 percent of all not-previously-plugged tubes.
Attachment 1 describes the eddy current inspection program performed in each steam generator for both bobbin coil and rotating pancake coil inspection techniques.
Attachment No. 2 describes the examination results and repairs and contains a listing of applicable tubes with pertinent information (indication,
- location, and voltage) for the 2-volt Interim Plugging Criteria and M tube repair programs.
Sincerely, 8C p
E.
E. Fitzpatrick Vice President Attachments dr 9404070253 940315 iPQR),"ADOCK 05000325, i
P",
PDR p0
'1
Mr. W. T. Russell AEP:NRC:11660 cc:
A. A. Blind G. Charnoff J.
B. Martin - Region III NFEM Section Chief NRC Resident Inspector J.
R. Padgett
ATTACHMENT 1 TO AEP:NRC:11660 EDDY CURRENT INSPECTION PROGRAM
Attachment 1 to AEP:NRC:11660 Page 1
The 1994 eddy current tube (ECT) inspection program for the Cook Nuclear Plant Unit 1
steam generators was conducted pursuant to Technical Specification 4.4.5.0. It included both bobbin coil (BC) and rotating pancake coil (RPC) probe inspection of tubes.
The base inspection program consisted of a full-length BC inspection of all not-previously-plugged tubes and an RPC inspection of all not-previously-plugged or -sleeved tubes in the hot leg tubesheet region (for a distance of 3 inches above and below the tubesheet surface).
Additionally, three other inspection plans were an integral part of the base program:
a sampling of sleeves installed during the 1992 outage was inspected using cross-wound BC
- probes, a sampling of tube support plate intersections was inspected by RPC consistent with implementation of the 2-volt Interim Plugging Criteria (IPC), and RPC inspection of re-rolled tubes was performed to validate implementation of the criteria.
The number of tubes examined by each method and extent of inspection for the ECT program are summarized in the table below.
Base Program BC-FL Base Program RPC-TTS Sleeve Program CWBC IPC Program RPC-TSP IPC*
Program RPC-TSP
>1 Volt Pk Program RPC-HL Roll SG-11 SG-12 SG-13 SG-14 Total 3077 3157 3176 3190 12600 2250 2977 2717 2816 10760 24 20 68 15 22 20 48 105 10 16 43 21 17 47 Legend:
BC - Bobbin coil CWBC - Cross wound bobbin coil RPC - Rotating pancake coil TTS - Top of tubesheet TSP - Tube support plate intersection FL - Full length (hot leg tube end to cold leg tube end)
HL Roll - Partial depth tube hard roll region, hot leg
- Subset of RPC-TSP data
ATTACHMENT 2 TO AEP'NRC'11660 INSPECTION RESULTS AND TUBE REPAIRS
Attachment 2 to AEP:NRC:11660 Page 1
Table No.
1 provides the inspection results for each steam generator by degradation
- location, based upon both Technical Specification tube plugging criteria and plant administrative limits.
The administrative limits were used in the tube sheet crevice and tube sheet surface regions and required the repair of tubes wi.th confirmed signals representing possible tube wall degradation, regardless of voltage or phase angle.
Table No.
2 summarizes the tube repair information from pre-1994 activities as well as the repairs completed in 1994.
As indicated by Table No. 2, the plugging level after tube repairs is within the licensed limits of 15% in any one steam generator and no more than 10% cumulative in all four steam generators.
The RPC-IPC program inspected 109 hot leg side BC indications in 105 tubes.
Indications selected for this program included tube dent signals
>5 volts, TSP signals identified as artifact indications, typical ODSCC indications <1 volt and one non-reportable indication with an amplitude
>1 volt.
In addition, 43 TSP indications in 43 tubes with BC voltage >1 volt were RPC-inspected in accordance with our IPC program.
No unusual RPC indications were identified by these RPC inspections.
All steam generators were initially considered as candidates for implementation of the W tube repair criteria using tube re-rolling.
A total of 47 hot leg tube ends with BC indications in the hard roll transition region were inspected by RPC prior to re-rolling tubes.
However, the re-rolling program was only implemented in steam generators Nos.
11 and 13 since the number of tubes in the remaining steam generators that could be saved by re-rolling was very limited.
To qualify the use of the W re-rolling process, a special 16 tube BC and RPC sample program was performed.
This program included a BC inspection before and after re-rolling, and an RPC inspection of the tubesheet surface region before and after re-rolling.
Three of the 16 tubes selected had known degradation at the top of the tubesheet.
These three tubes were chosen to confirm that the re-rolling process would have no impact on existing degradation at the top of the tubesheet.
These tubes were plugged at the conclusion of the special sample program.
The favorable inspection results were as follows:
no tube degradation was found in the newly re-rolled regions, no change was noted to the three degraded'tubes at the top of tubesheet, and no indications were found at the top of the tubesheet regions of the remaining 13 tubes.
All W tubes returned to service were inspected by RPC and BC after the re-rolling process.
In steam generator No.
11, 15 of 17 candidate tubes were recovered.
Two tubes which did not meet re-rolling criteria were plugged.
In steam generator No. 13, all 17 candidate tubes were recovered.
During this outage, one tube in steam generator No.
11 was removed from service based on the low row tube fatigue analysis study conducted by Westinghouse as a
commitment to NRC Bulletin 88-02.
This study identified one tube, row 8-column 35, as requiring repair this refueling outage.
A dampener cable was installed and the tube was plugged with a sentinel plug on the hot leg tube end and a solid plug on the cold leg tube end.
Attachment 2 to AEP:NRC:11660 Page 2
Table No.
3 summarizes the results of the RPC inspection of the TTS region of all not-previously-plugged or sleeved tubes in each steam generator.
The results reported are the total number of circumferentially oriented indications (COI),
single axial indications (SAI), and multiple axial, indications (MAI). All tubes with these indications were plugged, and as a preventive measure, four of the COI tube indications had stabilizers installed.
The appendix to this letter contains the information required by Technical Specification 4.4.5.5.d, i.e., the listing of tubes for which the W and IPC have been applied, and the location and extent of degradation (voltage).
t
Attachment 2 to AEP:NRC:11660 Page 3
Table No.l 1994 Steam Generator Inspection Total Repaired Tubes+
Location TSP-CLT,>39%
AVB,>39%
SG11 SG12 10 SG13 SG14 Total 23 Miscellaneous TTS/CREVICE TSP-HL
(>2 Volt)
ROLL-HL TOTAL 80 17 (a) 102 58 73 21 17 (b) 44 78 89 237 42 308
- Incudes all BC and RPC results (a) 15 of 17 recovered by W re-rolling (b) 17 of 17 recovered by W re-rolling Legend:
TSP-CLT:
AVB'isc.:
TTS/Crevice:
TSP-HL:
Roll-HL:
Cold Leg Thinning at TSPs Fretting wear at Anti-Vibration Bars One tube plugged due to NRC Bulletin 88-02 and another due to an anomalous indication ODSCC at the top of tubesheet and tubesheet crevice Outside diameter stress corrosion cracking (ODSCC) at hot leg TSPs PWSCC at the tube roll transition region
Attachment 2 to AEP:NRC:11660 Page 4
Table No.
2 Steam Generator Tube Repair Summary Pre
'94 Plugged SG11 311 SG12 231 SG13 212 SG14 198 Total 952 Sleeved Equiv Plug
% Plugged
'94 Plugged CLT AVB MISCL TTS/CREVICE TSP-HL
(>2 Volt)
ROLL-HL 827 346 10.2%
80 180 239 7.1%
10 58 459 232 6.8%
21 374 214 6.
3'%8 1840 1031 7 '%
23 237 10 Total Cum.
% Plugged 12.8%
9.2%
7.6%
8.9%
9.6%
Table No.
3 RPC-TTS Indications SG-11 SG-12 SG-13 SG-14 Total COI SAI MAI 61 20 39 13 13 68 12 181 COI - Circumferentially Oriented Indications SAI Single Axial Indications MAI - Multiple Axial Indications
APPENDIX M AND INTERIM PLUGGING CRITERIA APPLICATION INFORMATION
4 COOK UNIT 1 COMPONENT SG-11 OUTAGE
- U1R094 F* TUBES WITH RE-ROLL Date 03/25/94 Page 1
Row 6
1 9
16 18 2
2 1
2 12 6
7 9
22 6
Col ll 25 37 38 39 40 45 51 55 65 68 74 74 74 75 IND DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI LOCATION TEH
- 2. 7 TEH 2.4 TEH 2.5 TEH 2.6 TEH 2.6 TEH 2.5 TEH 2.4 TEH 2.3 TEH 2.3 TEH 2
~ 4 TEH
- 2. 2 TEH 2.3 TEH 2.4 TEH 2.3 TEH 2.6 Voltage 53.96 48.53 57.52 52.93 52.57 46.88 52.45 41.77 41.34 41.23 19.60 14.56 17.40 27.05 20.11 J
Number of Tubes 15
0 COOK UNIT 1 COMPONENT SG-13 OUTAGE
- U1R094 Date 03/25/94 Page 1
F* TUBES WITH RE-ROLL Row 2
14 2
3 4
3 3
6 29 30 12 14ll 8
12, 15 9
10 Col 18 22 33 37 54 58 71 71 71 71 72
'72 73 74 74 74 75 83 IND DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI DRI LOCATION TEH 2.6 0.0 TEH 2.6 TEH 2.9 TEH 2 '
TEH 2.4 TEH 1.7 TEH 3.0 TEH 2.3 TEH 2.6 TEH 2.7 TEH 2.8 TEH 2.8 TEH 2.9 TEH 2.4 TEH 2.5 TEH 2.7 TEH 2.5 Voltage 33.93 0.00 X
46.15 41.88 18.33 45.23 64.24 55.75 53.50 49.23 53.55 59.06 51.84 48.04 48.69 59.31 54.05 50.19 Number of Tubes 18 X
Inadvertently re-rolled, had no indication
COOK UNIT 1 COMPONENT SG-11 OUTAGE U1R094 Date 03/28/94 Page 1
ODSCC Row 5
16 24 21 28 21 24 28 1
31 29 35 15 4
17 35 12 24 38 33 44 15 4
5ll 33 40 20 5
8 42 19 20 42 20 22 32 46 4
20 20 25 25 1
TUBE Col 10 11 11 12 12 15 16 16 17 19 20 21 22 24 30 32 32 35 35 36 38 38 39 40 40 41 42 42 42 43 43 43 44 44 44 44 45 45 45 45 45 46 IND PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PX PI PI PI PX PI PI PI PX PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI INDICATIONS AT SUPPORT PLATE 2H 1H 1H 1H 1H 1H 1H 2H 2H 1H 4H 1H 2H 1H 1H 1H 1H 2H 1H 1H 2H 1H 2H 1H 3H 1H 2H 1H 2H 2H 3H 1H 1H 3H 1H 2H 1H 1H 2H 1H 2H 1H 2H 1H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATION INTERSECTIONS Voltage 0.81 0.87 0.33
- l. 12 0.55 1.27 0.80 0.56 0.90 0.33 0.22 0.44 0.35 0.52 0.35 1.03 0.53 0.68 0.46 0.60 0.73 0.48 0.74 0.39 0.37 1.03 1.03 0.51 0.91 0.39 0.31 1.09 0.61 0.88 0.73 0.44 0.59 0.34 0.65 0.70 0.79 0.83 0.84 0.65
COOK UNIT 1 COMPONENT SG-11 OUTAGE U1R094 Date 03/28/94 Page 2
ODSCC Row 1
1 8
42 25 25 29 33 36 5
5 9
36 38 46 15 46 21 31 32 31 33 27 34 34 38 38 33 46 22 25 25 29 39 21 33 40 41 45 5
37 25 31 42 TUBE Col 46 46 46 46 47 47 47 47 47 48 48 48 48 48 48 49
'49 50 50 50 51 51 52 52 52 52 52 53 53 54 54 54 54 54
'55 55 56 57 58 59 59, 60 60 60 IND PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI INDICATIONS AT SUPPORT PLATE 2H 3H 1H 2H 1H 2H 1H 1H 2H 1H 2H 1H 1H 2H 3H 1H 1H 1H 1H 1H 1H 1H 1H 1H 2H 2H 4H 1H 3H 1H 1H 2H 1H 2H 1H 1H 1H 6H 1H 1H 1H 1H 1H 1H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATION INTERSECTIONS Voltage 0.83 0.54 0.55 0.47 0.69 0.64 0.68 0.55 0.41 0.61 0
F 80 0.59 0.36 0.62 0.72 1.11 0.24 0.83 0.24 0.37 0.77 0.65 0.52 1.03 0.47 0.51 0.34 0.64 0.40 0.78 0.68 0.48 0.55 0.73 0.63 0.76 0.42 0.39 0.20 0.67 0.37 0.66 0.49 0.84
COOK UNIT 1 COMPONENT SG-11 OUTAGE
- U1R094 Date 03/28/94 Page 3
ODSCC TUBE INDICATIONS AT SUPPORT PLATE INTERSECTXONS Row 44 2
29 39 43 4
4 38 2
15 2
32 15 25 26 27 8
33 33 22 30 33 36 1
5 8
27 20 28ll 14 24 35 18 22 26 14 19 30 16 10 23 27 28 Col 60 61 61 61 62 63 63 63 64 64 65 65 66 66 66 66 67 67 67 68 68 68 68 71 71 71 71 72 73 74 74 74 74 75 75 76 77 77 77 80 82 82 82 82 IND PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PX PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI 3H 1H 1H 2H 3H 1H 2H 1H 1H 2H 1H 1H 2H 1H 1H 1H 1H 1H 3H 1H 1H 1H 2H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 2H 1H 2H 1H 1H 1H 1H 1H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0'.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATION Voltage 0.46 0.73 0.73 0.82 0.58 0.96 0.69 0.63 0.48 0.87 0.95 0.82 0.44 0.94 1.03 0.95 0.44 0.47 0.36 0.81 0.42 0.57 0.93 0.45 0.56 0.49 0.52 0.18 0.44
" 0.52 0.80 0.87 0.47 0.59 1.00 0.29 0.54 0.59 0.62 0.45 0.73 0.67 0.50 0.40
COOK UNIT 1 COMPONENT SG-11 OUTAGE U1R094 Date 03/28/94 Page 4
ODSCC TUBE INDICATIONS AT SUPPORT PLATE INTERSECTIONS Row 31 6
26 28 3
10 10' 19 1
14 9
2
,2 3
7 15 10 12 12 12 10 2
Col 82 83 83 83 84 84 85 86 86 87 87 87 88 89 89 89 89 89 90 91 91 91 93 94 IND PX PI PX PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI PI TXON 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCA 1H 1H 1H 1H 1H 2H 2H 1H 1H 1H 1H 1H 1H 1H 2H 3H 1H 2H 1H 1H 3H 4H 1H 2H Voltage 0.70 1.53 0.41 0.80 0.53 0.33 0.60 0.48 0.33 0.65 0.85 0.59 0.74 0.57 0.71 0.53 0.74 0'3 0.59 0.73 0.81 0.39 0.68 0.34 Number of Tubes
1 DC Cook Unit COMPONENT SG-12 OUTAGE
- U1R094 Date 03/28/94 Page 1
ODSCC Row 3
8 3
3 6
4 4
19 8
12 12 8
9 9
9 12 4
12 8
6 8
8 8
15 23 8
23 8
8 15 4
4 13 8
8 8
20 8
18 8
8 16 18 TUBE Col 2
3 5
5 5
6 6
6 7
7 7
8 8
8 8
8 9
9 10 11 12 12 12 13 13 14 15 15 17 17 17 18 18 18 19 19 20 20 22 22 24 24 24 24 IND PX PI PI PI PI PI PI PX PI PI PI PI PX PI PI PI FI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PX PX PI PI PI PI PI PI PI INDICATIONS AT SUPPORT PLATE 1H 2H 2H 4H 1H 1H 3H 2H 2H 1H 2H 2H 1H 2H 4H 2H 2H 4H 1H 2H IH 1H 2H 1H 1H 1H 1H 1H 1H 2H 1H 1H 2H 2H 1H 2H 2H 1H 1H 1H 1H 2H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1H 0.0 1H "0. 0 LOCATION INTERSECTXONS Voltage 0.59 1.13 0.63 0.59 0.68 0.62 0.43 0.50 0.62 0.94 0.60 0.42 0.24 0'8 0.27 0.57 0.84 0.53 0.48 0.79 0.40 0.98 0.46 0.79 0.58 0'4 0.82 0.86 0.74 0.81 0.72 0.93 0.81 0.50 1.20 0.59 0.80 0.53 0.90 0.40 0.61 1.54 0.76 0.50
DC Cook Unit COMPONENT SG-12 OUTAGE U1RO94 Date 03/28/94 Page 2
ODSCC Row 20 4
24 4Q 10 37 40 11 23 38 23 12 23 8
5 38 41 23 34 45 11 46 41 29 18ll 3ll 34 3
11 43 43 4Q 44 13ll 13 11 26 8
8 2
13 TUBE Col 24 26 26 28 29 29 29 32 32 33 35 37 37 39 43 43 44 47 47 47 48 48 49 51 52 55 56 56 56 58 59 61 61 62 62 66 68 69 70 70 71 71 72 72 IND PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI PI PI PX PI PI PI PI PI PI PI PI PI INDICATIONS AT SUPPORT PLATE 1H 2H 4H 1H 4H 2H 5H 1H 1H 1H 2H 2H 3H 1H 1H 1H 2H 1H 1H 3H 2H 2H 1H 1H 1H 2H 2H 2H 1H 2H 1H 2H 3H 1H 1H 2H 1H 2H 2H 2H 2H 4H 1H 2H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 '0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATXON INTERSECTXONS Voltage 0.62 0.44 0.35 0.48 0.18 0.40 0.43 0.49 0.62 0.71 0.53 0.95 0.37 0'9 0.82 0.73 0.18 0.50 0.41 0.43 0.37 0.43 0.
33'.40 0.96 1.72 0.73 1.40 0.74 0.58 0.90 0.91 0.74 0.54 0.43 0.96 1.18 0.48 1.77 0.14 0.41 0.51 0.88 0.77
DC Cook Unit COMPONENT SG-12 OUTAGE
- U1R094 Date 03/28/94 Page 3
ODSCC TUBE INDICATIONS AT SUPPORT PLATE INTERSECTIONS Row 37 28 34 36 37 26 34 37 37 21 29 28 15 2
12 Col IND 73 PI 74 PI 74 PI 74 PI 74 PI 75 PI 75 PI 75 PI 75 PI 76 PI 77 PI 78 PI 80 PI 84 PI 93 PI LOCATION 4H 0.0 1H 0.0 1H 0.0 3H 0.0 1H 0.0 1H 0 '
5H 0.0 4H 0.0 5H 0.0 1H 0.0 1H 0.0 1H 0.0 2H 0.0 1H 0.0 2H 0.0 Voltage 0.38 0.53 1.00 0.48 0.43 0.34 0.32 0.28 0.66 1.08 0.48 0.64 0.71 0.59 0.63 Number of Tubes 90
'OOK UNIT 1 COMPONENT SG-13 OUTAGE
- U1R094 Date 03/28/94 Page 1
ODSCC TUBE INDICATIONS AT SUPPORT PLATE INTERSECTIONS Row 7
15 4
19 15 15 15 23 4
7 6
8 10 4
34 15 25 32 39 35 38 34 39 35 21 36 18 18 18 43 24 20 27 35 38 14 11ll 16 15 23 24 27 6
Col 12 13 16 16 17 18 23 23 27 28 29 29 32 34 35 36 36 38 38 48 50 50 50 50 52 53 53 53 55 57 57 57 58 IND PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI PI PX PI PI PI PI PI PI PI PX PI PI PI PI 3H 2H 3H 5H 1H 2H 3H 1H 2H 2H 1H 1H 1H 2H 2H 1H 2H 1H 2H 2H 5H 1H 1H 1H 2H 2H 1H 2H 1H 3H 1H 1H 1H 1H 1H 2H 1H 3H 3H 1H 1H 1H 1H 1H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATION Voltage 0.57 0.45 0.29 0.77 0.71 0.43
-0. 62 0.43 0.71 0.80 0.99 0.59 0.37 1.12 0.91 0.62 0.32 0.23 0.97 0.49 0.18 0.99 0.35 0.66 0.75 0.44 0.46 0.90 0.76 0.37 0.76 0.90 0.67 0.81 0.29 0.51 1.02 0.86 0.46 0.50 0.75 0.55 0.52 1.19
ODSCC Row 8
10 5
20 6
39 15 18 24 39 11 18 30 36 6
31 24 15 8
21 1
17 1
6 8
17 6
10 2
11 15 29 2
6ll 6
4 4
TUBE Col 58 58 60 61 63 63 64 65 65 65 67 69 69 71 72 72 73 75 76 76 77 78 80 80 80 81 82 83
- 8484, 84 84 85 86 86 87 88 89 94 94 XND PX PX PI PX PI PX PX PI PX PI PI PX PX PI PI PX PX PX PI PX PI PX PI PX PX PI PI PI PI PI PI PI PI PX PI PX PI PI PI PI LOCATION 1H 1H 1H 1H 1H 1H 1H lH 1H 2H 1H 1H 1H lH 1H 1H 2H 1H 1H lH 2H 1H 1H 1H 1H 1H 1H 2H 1H 1H 1H lH 2H 1H 2H lH 1H 2H 1H 2H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 '
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 COOK UNXT 1 COMPONENT SG-13 OUTAGE U1R094 INDICATIONS AT SUPPORT PLATE Date 03/28/94 Page 2
INTERSECTIONS Voltage 0.44 1.15 1.11 0.51 0.71 0.52 1.50 0.41 0.37 0.40 0.74 0.56 0.58 0.39 0.28 1.35 0.75 0.55 0.94 0.34 0.68 0.56 0.38 0.87 0.35 0.29 0.80 0.89 0.53 1.05 0.38 0.70 0.43 0.77 0.48 0.83 0.50 0.62 0.58 1.12 Number of Tubes 80
~
~ ~
COOK UNIT 1 COMPONENT SG-14 OUTAGE U1R094 Date 03/28/94 Page 1
ODSCC TUBE INDICATIONS AT SUPPORT PLATE INTERSECTIONS Row 5
5 5
15 16 17llll 9
17 8
11 16 ll 20 9
16 25 9
28 9
8ll 11 7
8 8
8 2
8
'21 21 22 22 22 8
9 21 37 28 28 28 30 Col s 8 8
8 9
9 9
10 10 10 12 12 14 15 15 15 17 17 1'8 18 19 19 19 19 19 19 19 20 20 20 20 21 21 21 21 XND PI PI PI PI PI PI PI PI PI PI PX,,
PI PI PI PI PI PI PI PI PI PI PX PI PX PI PI PI PI PX PI PX PX PX PI PI PI PI PI PI PI PI PI PI PI 2H 2H 5H 1H 1H 3H 1H 2H 3H 2H 1H 3H 1H 2H 1H 3H 3H 2H
'1H 2H 5H 2H 1H 1H 2H 2H 2H 1H 3H 2H 3H 1H 2H 1H 2H 3H 1H 1H 1H 1H 1H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2H 0.0 3H 0.0 1H
, 0.0 LOCATION Voltage 0.40 0.51 0.31 0.62 0'1 0.55 0.76 0.37 0.28 0.48 0.68 0.39 0.75 0.27 0.74 0.31 0.31 0.76 0.60 0.28 0.62 0.34 0.70 1.38 0.51 0.27 0.38 0.62 0.84 0.92 1.14 0.57 0.68 0.71 0.27 0.59 0.76 0.51 0.50 0.50 0.27 0.83 0.43 0.40
COOK UNIT 1 COMPONENT SG-14 OUTAGE U1R094 Date 03/28/94 Page 2
ODSCC TUBE INDICATIONS AT SUPPORT PLATE INTERSECTIONS Row 38llll 28 28 28 11 8
38 21 40 5
5 5
32 28 32 8
12 40 30 30 40 43 3
29 29 32 38 38 6
45 45 29 41 25 42 23 28 29 34 38 42 18 Col 21 22 22 22 22 23 24 26 27 29 29 30 30 30 30 32 32 33 33 33 34 34 34 34 35 36 37 37 37 37 38 38 38 39 39 40 40 41 41 41 41 41 41 42 IND PI PI PI PI PI PI PI PI PI PI PI PI, PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI 1H 1H 3H 1H 2H 3H 3H 2H 1H 1H 1H 1H 2H 3H 1H 1H 1H 2H 2H 3H 1H 2H 1H 3H 1H 1H 1H 1H 1H 2H 1H 2H 3H 1H 2H 1H 2H 1H 1H 1H 1H 1H 1H 1H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATION Voltage 0.43 1
~ 52 0.99 0.93 0.53 0.53 0.43 0.61 0.84 0.36 0.42 0.66 1.32 0.85 0.56 0.36 0.83 0.65 0.80 0.54 0.39 0.58 0.68 0.41 0.97 0.91 0.87 0.64 0.33 0 '5 0.59 0.49 0.59 1.02 0.38 0.69 0.71 0.83 1.08 1.00 0.31 0.87 0.57 0.95
0
P COOK UNIT 1 COMPONENT SG-14 OUTAGE
- U1R094 Date 03/28/94 Page 4
ODSCC Row 20 25 22 31 38 3
26 31 4
38 6
30 33 30 33 33 16 29 4
30 31 33 23 26 28 10 4
24 26 1ll 1
26 5
18 19 21 4
2 2
TUBE Col 66 66 68 70 70 71 71 71 72 72 73 73 73 74 74 74 75 75 76 76 76 76 78 78 78 79 80 81 81 82 82 86 86 87 87 89 89 92 94 94 IND PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PI PX PI PI PI PI PI INDICATIONS AT SUPPORT PLATE 1H 1H 1H 1H 1H 2H 3H 1H 2H 2H 2H 1H 1H 1H 1H 2H 2H 1H 2H 1H 3H 1H 3H 2H 2H 1H 2H 2H 1H 2H 2H 4H 2H 2H 3H 2H
- 3H 2H 2H 4H 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOCATXON INTERSECTIONS Voltage 1.03 0.97 0.64 0.75 0.62 0.58 0.32 0.75 0.67 0.58 0.90 0.68 0.88 0.84 0.71 0.64 0.66 0.62 0.93 0.35 0.63 0.86 0.76 0.59 0.52 0.54 1.08 0.96 0.81 0.70 0.59 0.42 1.03 1.06 0.63 0.93 0.39 0.46 0.45 0.32 Number of Tubes 149
ll I
0
~ 'tj W