Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19256F833 + (Forwards Comments on Draft City of Brownsville,Tx Example of Radiological Emergency Response Plan for Nuclear Facility Accident.Plan Not Consistent w/NUREG-75/111)
- ML19281D580 + (Forwards Comments on Draft Commission Paper Re NRC Enforcement Program.No Addl Comments Will Be Submitted)
- ML20057F552 + (Forwards Comments on Draft Commission Paper on Regulatory Treatment of Non-Safety Sys Per 930910 Request.Comments Reflect Process to Arrive at Position Re non-safety Sys in Alwr Designs)
- L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 + (Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2)
- ML20235V558 + (Forwards Comments on Draft Decommissioning Plan for Maxey Flats Disposal Site,Task 1 Re Performance Stds)
- ML20236M496 + (Forwards Comments on Draft Decommissioning Plan for Maxey Flats Disposal Site,Task 3:Evaluation of Alternatives. Document Gives Minimal Technical Info to Permit Assessments of Design Options.Lists Options W/Insufficient Review)
- ML20215J596 + (Forwards Comments on Draft Documents Re Riverton Remedial Action,Per 870320 Request.No Mechanisms for Transferring Responsibility for Riverton Tailings from DOE to NRC Identified During 870317 Meeting.Doe Responsible for Action)
- ML20003D428 + (Forwards Comments on Draft EIS Re Proposed Exemption from Licensing Requirements for Smelted Alloys Containing Tc-99 & Low Enriched U.Opposes NUREG)
- ML19340B306 + (Forwards Comments on Draft EIS for Mill Tailings Expansion Project.Inadequacies Include Lack of Required Environ Analysis,Failure to Discuss Installation of Drainage Sys, under-pond Drain Sys & Hyperlon Liner)
- ML20246E261 + (Forwards Comments on Draft EIS, Decommissioning of Eight Surplus Production Reactors at Hanford Site,Richland,Wa/, in Response to 54FR18325)
- ML19206A233 + (Forwards Comments on Draft ETS (Nonradiological))
- ML20203C413 + (Forwards Comments on Draft Emergency Planning Requirements Part P,For Suggested State Regulations.Comments Provided on 970319 Have Not Been Resolved.Nmss Especially Concerned)
- ML20137B188 + (Forwards Comments on Draft Emergency Planning Requirements)
- ML20195H294 + (Forwards Comments on Draft Environ Assessment & Preliminary Design for Spook,Wy Umtrap in Area of Groundwater Hydrology & Geotechnical Engineering.Doe Has Not Demonstrated Compliance W/Proposed EPA Groundwater Protection Stds)
- ML20126J348 + (Forwards Comments on Draft Environ Assessment & Remedial Action Plan for Lakeview,Or Umtrap Site.Doe Will Incorporate Comments Into Environ Assessment Addendum)
- ML19224D095 + (Forwards Comments on Draft Environ Impact Statement,Ref Concerns in Emergency Response Operations,Reactor Operational Experience & Availability of Cooling Water)
- ML17297B824 + (Forwards Comments on Draft Environ Protection Plan.Nrc Should Accept Other Federal Agency Findings W/O Further Review)
- ML13317A710 + (Forwards Comments on Draft Evaluation for SEP Topic III.3.C, Inservice Insp of Water Control Structures)
- ML18046A638 + (Forwards Comments on Draft Evaluation of SEP Topic V-11.B, RHR Interlock Requirements. Disagrees W/Nrc Recommendations Re Interlocks for Motor Operated LPSI & Shutdown Cooling Valves)
- ML18043A617 + (Forwards Comments on Draft Evaluation of Systematic Evaluation Program Topics XV-17,XV-18 & Portion of XV-12)
- ML18046A792 + (Forwards Comments on Draft Evaluations of SEP Topics VI-2.D Re Mass & Energy Release for Possible Pipe Break Inside Containment & VI-3 Re Containment Pressure & Heat Removal Capability,Per NRC)
- ML20086J249 + (Forwards Comments on Draft Facility Attachment Re Us/Iaea Safeguards Agreement for Application of IAEA Safeguards. Responses to IAEA Design Info Questionnaire Items 38 & 45 Also Encl)
- ML20125E206 + (Forwards Comments on Draft Final Rule Re Rev of Fee schedules,100% Fee recovery,FY92)
- ML20137N189 + (Forwards Comments on Draft Final Rule to Conform NRC Mill Tailings Requirements to EPA Environmental Stds)
- ML20059C061 + (Forwards Comments on Draft Final SER & Provides Views Re Future Changes to Alwr Util Requirements Document (Urd) as Requested in Transmittal Ltr for SER of 930831)
- ML20235J400 + (Forwards Comments on Draft Fire Protection SER)
- ML20127J302 + (Forwards Comments on Draft Full Power License NPF-19, Including Proposed Changes to Listed License Conditions Re Reactor Core Power Levels,Pump & Valve Inservice Testing Program,Fire Protection Program & Generic Ltr 83-28)
- PY-CEI-NRR-0518, Forwards Comments on Draft Full Power Ol,Per 860609 Request. License Condition 2.C.(10) Re Salem ATWS Events,Generic Ltr 83-28 & License Condition 2.C.(11) Re FSAR App 1B Commitments Will Not Be Included in Full License + (Forwards Comments on Draft Full Power Ol,Per 860609 Request. License Condition 2.C.(10) Re Salem ATWS Events,Generic Ltr 83-28 & License Condition 2.C.(11) Re FSAR App 1B Commitments Will Not Be Included in Full License)
- ML19207A892 + (Forwards Comments on Draft GEIS on U Milling)
- IA-87-655, Forwards Comments on Draft Gao Rept on NRC Safety Stds & Insp & Enforcement Efforts.Comments Directed at Conclusions Provided on Pages 16,18 & 36 of Rept.W/O Encl + (Forwards Comments on Draft Gao Rept on NRC Safety Stds & Insp & Enforcement Efforts.Comments Directed at Conclusions Provided on Pages 16,18 & 36 of Rept.W/O Encl)
- ML20245B333 + (Forwards Comments on Draft Gao Rept on NRC Safety Stds & Insp & Enforcement Efforts.Comments Directed at Conclusions Provided on Pages 16,18 & 36 of Rept.W/O Encl)
- ML20211A180 + (Forwards Comments on Draft Geig Re NUREG-1437)
- ML20056E068 + (Forwards Comments on Draft Generic Communication Re BWR Stability & Long Term Solutions for Thermal Hydraulic Instabilities)
- ML19347F324 + (Forwards Comments on Draft Generic EIS Re Decommissioning of Nuclear Facilities.Residual Radioactivity Discussions Fail to Address Release Criteria for Recycled Matls)
- ML20064H829 + (Forwards Comments on Draft Generic Ltr 82-32, Potential Steam Generator Related Generic Requirements. Matters W/O Impact on Public Risk Should Not Become Regulatory Requirements)
- ML20062B008 + (Forwards Comments on Draft Generic Ltr 88-20,Suppl 4 & NUREG-1407.NUMARC Comments on Documents Endorsed)
- ML20064E633 + (Forwards Comments on Draft Generic Ltr, Guidance for Mod of TSs to Reflect Revs to 10CFR20, Stds for Protection Against Radiation & 10CFR50.36a, TSs on Effluents from Nuclear Power Reactor, Related Current Industry Initiatives..)
- ML20203N295 + (Forwards Comments on Draft Generic Ltr, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping & Rev 2 to Draft NUREG-0313, Technical Rept on Matl.... Proposed 25% Limit to Control IGSCC in BWR Piping Unnecessary)
- ML20215P005 + (Forwards Comments on Draft Generic Position on Groundwater Travel Time. Recommends Proceeding W/Recommendations, Acceptance & Actual Utilization Until Such Time as Further Understanding & Progress Shows That Mods Needed)
- ML20137K295 + (Forwards Comments on Draft Generic Technical Position on Licensing Assessment Methodology for High Level Waste Geologic Repositories.Definition of Reliability Vs Level of Confidence,Per 850417 Meeting,Discussed in Encl)
- ML20214J982 + (Forwards Comments on Draft Generic Technical Positions, Including Items & Activities in High Level Geologic Repository Program Subj to 10CFR60 QA Requirements,Per)
- ML20214K063 + (Forwards Comments on Draft Generic Technical Position on Items & Activities in High Level Waste Geologic Repository Program Subj to 10CFR60 QA Requirements)
- ML20214J857 + (Forwards Comments on Draft Generic Technical Positions, Qualification of Existing Data for High Level Nuclear Waste Repositories & Peer Review of High Level Nuclear Waste Repositories)
- ML20140B327 + (Forwards Comments on Draft Generic Technical Position on Insitu Testing During Site Characterization for High Level Nuclear Waste Repositories.Inclusion of Discussion in Plan on Data from Long Duration Tests Supported)
- ML20140B216 + (Forwards Comments on Draft Generic Technical Position:Waste Package Reliability. Mechanism Needed to Assure That Containment of High Level Waste Substantially Complete for 300-1,000 Yrs After Permanent Closure)
- ML20214S349 + (Forwards Comments on Draft Generic Technical Position Papers Qualification of Existing Data for High Level Waste Repositories & Peer Review for High Level Waste Repositories)
- ML20140B234 + (Forwards Comments on Draft Generic Technical Position on Licensing Assessment Methodology for High Level Waste Geologic Repositories.Technical Position & Guidance Appropriate.Problems W/Implementation Possible)
- ML20137K302 + (Forwards Comments on Draft Generic Technical Position on Licensing Assessment Methodology for High Level Waste Geologic Repositories)
- ML19308A458 + (Forwards Comments on Draft Guidance for Licensee Implementation of short-term Actions Recommended by the Lessons Learned Task Force,Section 2.1.8.a, Improved Post- Accident Sampling Capability. W/O Encl)
- ML20011D522 + (Forwards Comments on Draft Guidelines for Weekly Doe/Nrc Telcon on Umtrap Project Status.Recommends Sentence Be Added to Guideline 8)
- ML20197F451 + (Forwards Comments on Draft IAEA Consultative Document, Application of Principles of Radiation Protection to Sources of Potential Exposutowards Unified Approach to Radiation Safety)