Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Comments on Draft Fire Protection SER". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19256F833  + (Forwards Comments on Draft City of Brownsville,Tx Example of Radiological Emergency Response Plan for Nuclear Facility Accident.Plan Not Consistent w/NUREG-75/111)
  • ML19281D580  + (Forwards Comments on Draft Commission Paper Re NRC Enforcement Program.No Addl Comments Will Be Submitted)
  • ML20057F552  + (Forwards Comments on Draft Commission Paper on Regulatory Treatment of Non-Safety Sys Per 930910 Request.Comments Reflect Process to Arrive at Position Re non-safety Sys in Alwr Designs)
  • L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2  + (Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2)
  • ML20235V558  + (Forwards Comments on Draft Decommissioning Plan for Maxey Flats Disposal Site,Task 1 Re Performance Stds)
  • ML20236M496  + (Forwards Comments on Draft Decommissioning Plan for Maxey Flats Disposal Site,Task 3:Evaluation of Alternatives. Document Gives Minimal Technical Info to Permit Assessments of Design Options.Lists Options W/Insufficient Review)
  • ML20215J596  + (Forwards Comments on Draft Documents Re Riverton Remedial Action,Per 870320 Request.No Mechanisms for Transferring Responsibility for Riverton Tailings from DOE to NRC Identified During 870317 Meeting.Doe Responsible for Action)
  • ML20003D428  + (Forwards Comments on Draft EIS Re Proposed Exemption from Licensing Requirements for Smelted Alloys Containing Tc-99 & Low Enriched U.Opposes NUREG)
  • ML19340B306  + (Forwards Comments on Draft EIS for Mill Tailings Expansion Project.Inadequacies Include Lack of Required Environ Analysis,Failure to Discuss Installation of Drainage Sys, under-pond Drain Sys & Hyperlon Liner)
  • ML20246E261  + (Forwards Comments on Draft EIS, Decommissioning of Eight Surplus Production Reactors at Hanford Site,Richland,Wa/, in Response to 54FR18325)
  • ML19206A233  + (Forwards Comments on Draft ETS (Nonradiological))
  • ML20203C413  + (Forwards Comments on Draft Emergency Planning Requirements Part P,For Suggested State Regulations.Comments Provided on 970319 Have Not Been Resolved.Nmss Especially Concerned)
  • ML20137B188  + (Forwards Comments on Draft Emergency Planning Requirements)
  • ML20195H294  + (Forwards Comments on Draft Environ Assessment & Preliminary Design for Spook,Wy Umtrap in Area of Groundwater Hydrology & Geotechnical Engineering.Doe Has Not Demonstrated Compliance W/Proposed EPA Groundwater Protection Stds)
  • ML20126J348  + (Forwards Comments on Draft Environ Assessment & Remedial Action Plan for Lakeview,Or Umtrap Site.Doe Will Incorporate Comments Into Environ Assessment Addendum)
  • ML19224D095  + (Forwards Comments on Draft Environ Impact Statement,Ref Concerns in Emergency Response Operations,Reactor Operational Experience & Availability of Cooling Water)
  • ML17297B824  + (Forwards Comments on Draft Environ Protection Plan.Nrc Should Accept Other Federal Agency Findings W/O Further Review)
  • ML13317A710  + (Forwards Comments on Draft Evaluation for SEP Topic III.3.C, Inservice Insp of Water Control Structures)
  • ML18046A638  + (Forwards Comments on Draft Evaluation of SEP Topic V-11.B, RHR Interlock Requirements. Disagrees W/Nrc Recommendations Re Interlocks for Motor Operated LPSI & Shutdown Cooling Valves)
  • ML18043A617  + (Forwards Comments on Draft Evaluation of Systematic Evaluation Program Topics XV-17,XV-18 & Portion of XV-12)
  • ML18046A792  + (Forwards Comments on Draft Evaluations of SEP Topics VI-2.D Re Mass & Energy Release for Possible Pipe Break Inside Containment & VI-3 Re Containment Pressure & Heat Removal Capability,Per NRC)
  • ML20086J249  + (Forwards Comments on Draft Facility Attachment Re Us/Iaea Safeguards Agreement for Application of IAEA Safeguards. Responses to IAEA Design Info Questionnaire Items 38 & 45 Also Encl)
  • ML20125E206  + (Forwards Comments on Draft Final Rule Re Rev of Fee schedules,100% Fee recovery,FY92)
  • ML20137N189  + (Forwards Comments on Draft Final Rule to Conform NRC Mill Tailings Requirements to EPA Environmental Stds)
  • ML20059C061  + (Forwards Comments on Draft Final SER & Provides Views Re Future Changes to Alwr Util Requirements Document (Urd) as Requested in Transmittal Ltr for SER of 930831)
  • ML20235J400  + (Forwards Comments on Draft Fire Protection SER)
  • ML20127J302  + (Forwards Comments on Draft Full Power License NPF-19, Including Proposed Changes to Listed License Conditions Re Reactor Core Power Levels,Pump & Valve Inservice Testing Program,Fire Protection Program & Generic Ltr 83-28)
  • PY-CEI-NRR-0518, Forwards Comments on Draft Full Power Ol,Per 860609 Request. License Condition 2.C.(10) Re Salem ATWS Events,Generic Ltr 83-28 & License Condition 2.C.(11) Re FSAR App 1B Commitments Will Not Be Included in Full License  + (Forwards Comments on Draft Full Power Ol,Per 860609 Request. License Condition 2.C.(10) Re Salem ATWS Events,Generic Ltr 83-28 & License Condition 2.C.(11) Re FSAR App 1B Commitments Will Not Be Included in Full License)
  • ML19207A892  + (Forwards Comments on Draft GEIS on U Milling)
  • IA-87-655, Forwards Comments on Draft Gao Rept on NRC Safety Stds & Insp & Enforcement Efforts.Comments Directed at Conclusions Provided on Pages 16,18 & 36 of Rept.W/O Encl  + (Forwards Comments on Draft Gao Rept on NRC Safety Stds & Insp & Enforcement Efforts.Comments Directed at Conclusions Provided on Pages 16,18 & 36 of Rept.W/O Encl)
  • ML20245B333  + (Forwards Comments on Draft Gao Rept on NRC Safety Stds & Insp & Enforcement Efforts.Comments Directed at Conclusions Provided on Pages 16,18 & 36 of Rept.W/O Encl)
  • ML20211A180  + (Forwards Comments on Draft Geig Re NUREG-1437)
  • ML20056E068  + (Forwards Comments on Draft Generic Communication Re BWR Stability & Long Term Solutions for Thermal Hydraulic Instabilities)
  • ML19347F324  + (Forwards Comments on Draft Generic EIS Re Decommissioning of Nuclear Facilities.Residual Radioactivity Discussions Fail to Address Release Criteria for Recycled Matls)
  • ML20064H829  + (Forwards Comments on Draft Generic Ltr 82-32, Potential Steam Generator Related Generic Requirements. Matters W/O Impact on Public Risk Should Not Become Regulatory Requirements)
  • ML20062B008  + (Forwards Comments on Draft Generic Ltr 88-20,Suppl 4 & NUREG-1407.NUMARC Comments on Documents Endorsed)
  • ML20064E633  + (Forwards Comments on Draft Generic Ltr, Guidance for Mod of TSs to Reflect Revs to 10CFR20, Stds for Protection Against Radiation & 10CFR50.36a, TSs on Effluents from Nuclear Power Reactor, Related Current Industry Initiatives..)
  • ML20203N295  + (Forwards Comments on Draft Generic Ltr, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping & Rev 2 to Draft NUREG-0313, Technical Rept on Matl.... Proposed 25% Limit to Control IGSCC in BWR Piping Unnecessary)
  • ML20215P005  + (Forwards Comments on Draft Generic Position on Groundwater Travel Time. Recommends Proceeding W/Recommendations, Acceptance & Actual Utilization Until Such Time as Further Understanding & Progress Shows That Mods Needed)
  • ML20137K295  + (Forwards Comments on Draft Generic Technical Position on Licensing Assessment Methodology for High Level Waste Geologic Repositories.Definition of Reliability Vs Level of Confidence,Per 850417 Meeting,Discussed in Encl)
  • ML20214J982  + (Forwards Comments on Draft Generic Technical Positions, Including Items & Activities in High Level Geologic Repository Program Subj to 10CFR60 QA Requirements,Per)
  • ML20214K063  + (Forwards Comments on Draft Generic Technical Position on Items & Activities in High Level Waste Geologic Repository Program Subj to 10CFR60 QA Requirements)
  • ML20214J857  + (Forwards Comments on Draft Generic Technical Positions, Qualification of Existing Data for High Level Nuclear Waste Repositories & Peer Review of High Level Nuclear Waste Repositories)
  • ML20140B327  + (Forwards Comments on Draft Generic Technical Position on Insitu Testing During Site Characterization for High Level Nuclear Waste Repositories.Inclusion of Discussion in Plan on Data from Long Duration Tests Supported)
  • ML20140B216  + (Forwards Comments on Draft Generic Technical Position:Waste Package Reliability. Mechanism Needed to Assure That Containment of High Level Waste Substantially Complete for 300-1,000 Yrs After Permanent Closure)
  • ML20214S349  + (Forwards Comments on Draft Generic Technical Position Papers Qualification of Existing Data for High Level Waste Repositories & Peer Review for High Level Waste Repositories)
  • ML20140B234  + (Forwards Comments on Draft Generic Technical Position on Licensing Assessment Methodology for High Level Waste Geologic Repositories.Technical Position & Guidance Appropriate.Problems W/Implementation Possible)
  • ML20137K302  + (Forwards Comments on Draft Generic Technical Position on Licensing Assessment Methodology for High Level Waste Geologic Repositories)
  • ML19308A458  + (Forwards Comments on Draft Guidance for Licensee Implementation of short-term Actions Recommended by the Lessons Learned Task Force,Section 2.1.8.a, Improved Post- Accident Sampling Capability. W/O Encl)
  • ML20011D522  + (Forwards Comments on Draft Guidelines for Weekly Doe/Nrc Telcon on Umtrap Project Status.Recommends Sentence Be Added to Guideline 8)
  • ML20197F451  + (Forwards Comments on Draft IAEA Consultative Document, Application of Principles of Radiation Protection to Sources of Potential Exposutowards Unified Approach to Radiation Safety)