RECULATOR)
FORMATION DISTRIBUTION S EM (RIDS)
ACCESSION NBR:8212070109 DOC DATE', 82/12/02 NOTARIZED; YES
'ACIL:STlV 50"528 Palo Verde Nuclear Station, Uni t ir Arizona Publ i STN 50 529 Palo Verde ~vuclear Station~
Unit 2~ Arizona Publi STN>>SO-530 Palo Verde Nuclear Station~
Unit 3i Arizona Publi AUTH,NAME AUTHOR AFFILIATION VAN BRUNTpK,E Arizona Public Service Co.
RECIP ~ NAME RECIPIENT AFFILIATION NOVAKgT ~ MD Assistant Director for Licensing SUBJECT; Forwards comments on draft environ protection plan ~ NRC should accept other~federal agency findings w/o further
- review, DISTRIBUTION CODE:
C002S COPIES RECEIVED:LTR ENCL SIZE:,,
TITLE: Public Comment on Environmental Statement NOTES:Standardized plant.
Standardized plant.
Stanaardized plant.
DOCKET 05000528 05000529 05000530 05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR LB3 BC 06 NI e
ANL COPIES LTTR ENCL 7
7 1
RECIPIENT COPIES ID CODE/NAME LTTR ENCL NRR LB3 LA 1
1 LICITRAgE, Oi 1
1 INTERNAL: ELD/HDS3 NRR/DE/AEAB 20 NRR/DE/HGEB 21 NRR/DS I/AEB 19 NRR/DSI/RAB 17 RGN5 1
1 1
1 1
1 1
1 1
1 1
1 NRR NORRIS' NRR/DE/EEB 16 NRR/DE/SAB 18 ETB 15 04 1
1 1
1 1
1 1
"1
.1 EXTERNAL'CRS NATL LAB NSIC 21 05 6
5 5
1 1
1 1
1 1
TOTAL NUMBER OF COPIES HEUUIRED; LTTR 36 ENCL 36
t 4 ii<<1 <<'
r
) w<> <<) i<<) )>> r 1
11>><<,
i
( )Nr
')
)('.
Vr l ) ) I<<)
I, f,>>1,
)
r f<<
Il,.f f
<>)
y))V)
Mg
"<<1 r'<<1'l ) r 3
')
1" f
)') I
)lf )
l ti
)11 J<<
\\'1 Il
)r)
'Ig I 'I f
f h
I
)W)>>
))W
<<i
<<l i 1<<< )
- 1) )
I
) ()
i
)1<<W
) w'I ll WV
<<kg'),(W J )
)W 0')'"
>> Iw>>
"f)) )'1
~ I 1 1f~,1 Ivl)'t )
II'<<)
w
<<IP
<<<<1>><<) )) lif>>) g) g
>>f'wo<<a 1) j
'I h<<f<<>>
I")f)<< f)<<~ "w(i y C',)
S2i2070i09 82i202 PDR AoaCZ 05000S28 A
PDR Arizona Public Service Company P.o. BOX 21666
~
PHOENIX, ARIZONA 65036 December 2,
1982 ANPP-22439 - WFQ/TFQ Mr. T. g.
Novak Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20SSS
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos.
STN-50-528/529/530 File:
82-056-026; G.1.01.10
Reference:
Letter from J.
D. Kerrigan, NRC, to E. E.
Van Brunt,
- APS, dated September 23, 1982.
Subject:
Environmental Protec-tion Plan - Palo Verde Nuclear Generating Station
Dear Mr. Novak:
The Referenced letter transmitted a draft version of the Palo Verde Environmental Protection Plan;(EPP),
and requested that we provide comments on this draft document.
We have reviewed the document, and our comments are attached.
Please contact me if you need any further assistance on this matter.
Very truly y urs E.
E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/TFQ/sp Attachment cc:
E. Licitra L. Bernabei P. Hourihan A. Gehr CQQ ck
Decembe'r 2,
1982 ANPP-22459 - l/FQ/TFQ STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief the statements made therein are true.
~u
( n~
Edwin E. Van Srunt, Jr.
, 1982
~
My Commission expires:
g,:My;Commhston Expfres May ]9, 1989 Swore to heft're me this" Q.>>
'ey of Me.e.~Ieee-Notary Public
4 y t
989/ At' a~siqx3
~>H
~nv<a)y>>
l
- IIN,
COMMENTS ON "APPENDIX B TO LICENSE DPR-50/528/529/530 PViVGS ENVIRONMENTAL PROTECTION PLAN Section 2.2--Terrestrial Issues Although no terrestrial issues requiring environmental monitoring programs were identified in the FES-OL, the applicant feels that it is appropriate to continue the ecological monitoring program referenced in the FES-CP.
- Further, the appli-cant intends that this program be augmented to determine what, if any, effects are caused by operation of the cooling towers.
The monitoring program will be conducted on-site and off-site out to approximately 5 miles from the cooling towers.
This 5-mile distance corresponds to the max-imum distance beyond which it is.generally accepted that total, salt deposition 1
is not expected to be significant.
It will consist of airborne salt monitoring using existing continuous low-volume samplers which are a part of the PVNGS en-vironmental radioactivity monitoring program.
Filters from these samplers will be analyzed periodically in a laboratory to determine airborne salt deposition.
Further, additional monitoring will be conducted at specific locations which include natural desert and agricultural lands within,5 miles of the PVNGS cooling towers and in areas where maximum total salt deposition values are predicted to occur.. Vegetation and soil monitoring will be conducted seasonally.
This program as described above will be instituted for pre-operational baseline monitoring to determine background airborne salt deposition and salt deposition on vegetation and soils.
This program will be continued for two years after commercial operation of PVNGS Unit 3.
Section 2.3--Cultural Resources Issues It is suggested that the responsibility for cultural resource compliance be dele-gated to the Bureau of Land Management (BLl1) instead of the NRC.
For the Palo Verde-Devers transmission line construction, the NRC and Department of Interior (DOI) had a Memorandum of Agreement which designated BLM as the lead agency for the powerline.
The B01 requirements for construction and monitoring were considered to be adequate to demonstrate compliance with State and Federal archaeological re-quirements.
E.y l
1 l
In Arizona it is virtually inpossible to establish a right-of-way for electric transmission lines without crossing lines owned by the United States Government and managed by the Bureau of Land Management (BLM) or some other agency of the U. S. Department of the Interior or U. S. Department of Agriculture..
Accordingly, before a corridor for electric transmission lines can be identified such agency is obligated to comply with the federal laws designed to protect cultural resources in the same manner as the NRC is obligated so to do.
For this reason, it is suggested with respect to the proposed Palo Verde Saguaro transmission line that if in the selection of the corridor for such line, compliance with federal laws protecting cultural resources has been established by another federal
- agency, the NRC should accept the findings and conclusions of such agency without further review.