Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031D312 + (Forwards Advance Portion of App E to FSAR Re TMI Requirements.Matl Will Be Incorporated Into Next FSAR Amend)
- ML20008E209 + (Forwards Advance Premium,Std Premium & Reserve Premium Endorsements,Effective 800101.Also Forwards Amend 10 to Indemnity Agreement B-34)
- ML20246L786 + (Forwards Advance Response to Potential Restart Issues Identified by NRC During Special Electrical Team Insp 50-277/89-07 & 50-278/89-07 on 890130-0230)
- ML20125B508 + (Forwards Advance Revised FSAR Pages to Facilitate NRC Review of RCS Cooldown Time After RHR Initiation in Support of Licensing Unit 2.Changes Will Be Incorporated in CPSES FSAR Amend 87 Currently Scheduled for Dec 1992)
- ML19254C988 + (Forwards Advance Route Approval Info for Shipment to Hanford,Wa Matl Containing Irradiated Reactor Fuel.Planned Food & Fuel Stops Should Be Finalized Upon Route Approval)
- ML20196D860 + (Forwards Advance Signed & Dtd Ltr Transmitting Favorable Executive Branch Views Re Grimes Aerospace Co Application to Export Candu Reactor Parts to Argentina)
- TXX-6848, Forwards Advance Submittal of Change to Plant FSAR Sections Re Plant Fire Protection Program.Change Reflects New Computerized Format Per Util & Addresses Fire Safe Shutdown & Hazards Analyses,Organization & Design Mods + (Forwards Advance Submittal of Change to Plant FSAR Sections Re Plant Fire Protection Program.Change Reflects New Computerized Format Per Util & Addresses Fire Safe Shutdown & Hazards Analyses,Organization & Design Mods)
- ML20247K599 + (Forwards Advance Submittal of FSAR & Tech Spec Changes Re Testing of Station Svc Water Recirculation Valves.Requests Expedited Review of Changes & Informs Util of Acceptability)
- ML20246E676 + (Forwards Advance Submittal of FSAR Changes for Response to NRC Action Plan Items Re post-accident Access to Vital Spaces & post-accident Sampling Sys Capability,For Review)
- TXX-8955, Forwards Advance Submittal of FSAR Changes Re Deletion & Relocation of Certain Process Radiation Monitors + (Forwards Advance Submittal of FSAR Changes Re Deletion & Relocation of Certain Process Radiation Monitors)
- ML20246H141 + (Forwards Advance Submittal of FSAR Changes Re Tech Specs to Be Included in Future FSAR Amend)
- ML20245J103 + (Forwards Advance Submittal of FSAR Changes for Chapter 12 Re Description & Control Measures for Cs-137 Instrument Calibr Facility)
- TXX-8956, Forwards Advance Submittal of FSAR Changes Re Solid Waste Mgt Sys + (Forwards Advance Submittal of FSAR Changes Re Solid Waste Mgt Sys)
- ML20041F566 + (Forwards Advance Summary of 820309 Briefing Re Pressurized Thermal Shock)
- ML20029D316 + (Forwards Advance,Predecisional Proposed Rulemaking Package Conforming Amends to 10CFRs for U Enrichment Regulation,For Info)
- ML20065H774 + (Forwards Advanced BWR Certified Design Matl/Itaac Review Guidance)
- ML20055G191 + (Forwards Advanced BWR Control Bldg Seismic Rept, Per Request.Ge Will Amend SSAR W/Response in Future Amend)
- ML20085K037 + (Forwards Advanced BWR Control Room Design Implementation Process, Per Sept 1991 Meetings in San Jose,Ca Re Chapter 18 of Advanced BWR Std Sar.Table & Figure Withheld)
- ML20006F163 + (Forwards Advanced BWR Master Index & Amend 8 Changes,Per Request.W/O Encls)
- ML20006F164 + (Forwards Advanced BWR Master Index & Amend 8 Changes,Per Request.W/O Encls)
- ML20098D482 + (Forwards Advanced BWR PRA punch-out List)
- ML20101G581 + (Forwards Advanced BWR Punch List Delineating Tasks to Complete PRA)
- ML20101G585 + (Forwards Advanced BWR Punch List,Delineating Tasks to Complete PRA)
- ML20086T187 + (Forwards Advanced BWR SSAR Chapter 8 Status Rept & Closure Action Plan as Followup to 910916-18 Meetings in San Jose,Ca)
- ML20101G949 + (Forwards Advanced BWR Ssar,Section 18E.2, Man-Machine Interface Sys to Support Design Acceptance Criteria 3.6. BNL Will Be Providing Info as Designated in Table 18E.1.1)
- ML20101G675 + (Forwards Advanced BWR TS)
- ML20235T536 + (Forwards Advanced CESSAR-80 Review Schedule,As Submitted in Program Plan)
- ML20126G932 + (Forwards Advanced Cooperative Agreement Between DOE & State of Co.Agreement Forwarded to Co Dept of Public Health for Review & Execution Re U Mill Tailings Remedial Action Program at Durango,Co)
- ML19263C464 + (Forwards Advanced Copy Responses to NRC Requesting Addl Info.Will Respond to Remaining Questions & Positions by 790220.Contains New & Revised FSAR Pages Marked as Revision 18)
- ST-HL-AE-1944, Forwards Advanced Copy of Amend 5 to Fire Hazards Analysis Rept.Amend Includes Rev to Listed Items.Amend 5 Will Be Formally Transmitted by 870331 + (Forwards Advanced Copy of Amend 5 to Fire Hazards Analysis Rept.Amend Includes Rev to Listed Items.Amend 5 Will Be Formally Transmitted by 870331)
- ML20058B044 + (Forwards Advanced Copy of Draft Paper, Diversity in Method of Measuring RPV Level in ABWR & Sbwr, to Keep Commission Informed About Key Policy & Technical Issues Bearing on Future LWR Designs)
- AECM-81-103, Forwards Advanced Copy of Preliminary Response to Meteorological Requirements of NUREG-0654 & Reg Guide 1.23 + (Forwards Advanced Copy of Preliminary Response to Meteorological Requirements of NUREG-0654 & Reg Guide 1.23)
- ST-HL-AE-2367, Forwards Advanced Copy of Rev 6 to Emergency Plan,Per 10CFR50.54(q).Plan Effectiveness Not Decreased.Formal Rev Will Be Submitted by 871009 + (Forwards Advanced Copy of Rev 6 to Emergency Plan,Per 10CFR50.54(q).Plan Effectiveness Not Decreased.Formal Rev Will Be Submitted by 871009)
- NSD-NRC-96-4869, Forwards Advanced Copy of Revised Section 2,focused PRA Study of WCAP-13856, AP600 Implementation of Regulatory Treatment of NonSafety-Related Sys Process + (Forwards Advanced Copy of Revised Section 2,focused PRA Study of WCAP-13856, AP600 Implementation of Regulatory Treatment of NonSafety-Related Sys Process)
- ML20150D801 + (Forwards Advanced Copy of SECY-88-086, Updated Staff Action for TVA Sequoyah Unit 2 Restart, for Placement in PDR)
- IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR + (Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR)
- ML20150D566 + (Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR)
- ML20005A399 + (Forwards Advanced Copy of SER Suppl 6 Per 810624 Request. W/O Encl)
- TXX-6885, Forwards Advanced FSAR Change Correcting Errors Contained in 871002 Rev to Environ Qualification Program.Ltr Supersedes Encls to TXX-6745 + (Forwards Advanced FSAR Change Correcting Errors Contained in 871002 Rev to Environ Qualification Program.Ltr Supersedes Encls to TXX-6745)
- TXX-8963, Forwards Advanced FSAR Change Re Clarification of Radiation Monitor Parameters,Including Related Ser/Sser Pages & Index Page for Bullets + (Forwards Advanced FSAR Change Re Clarification of Radiation Monitor Parameters,Including Related Ser/Sser Pages & Index Page for Bullets)
- ML20125A841 + (Forwards Advanced FSAR Submittal,Reflecting Revised Analysis for Releases Through Containment Pressure Relief Line During Loca.Matl Will Be Incorporated in CPSES FSAR Amend 87 Currently Scheduled for Dec 1992)
- ML19347E010 + (Forwards Advanced Fuel & Spent Fuel Licensing Branch Position on Operator Certification Program.Corrects Three Typographical Errors in 10CFR72 Portion of NRC)
- ML20236C049 + (Forwards Advanced Future FSAR Amend Consisting of marked-up FSAR Pages,Providing Update to Description of Toxic Chemicals at Plants)
- ML20198C132 + (Forwards Advanced Info Re Issues for Discussion W/Nrc on 910625.NUMARC Ad Hoc Advisory Committee Formed to Address Pending Rev of 10CFR50,Appendix J, Leakage Rate Testing of Containments of Light-Water-Cooled Nuclear Power Plants)
- ML20245A007 + (Forwards Advanced LWR Requirements Document,Chapter 11 - Electric Power Sys. Util Believes Major Objectives Have Been Achieved & Concerns for Station Blackout Will Be Virtually Eliminated)
- ML19325E397 + (Forwards Advanced LWR Requirements Document,Chapter 10: Man-Machine Interface Sys)
- ML20236A725 + (Forwards Advanced LWR Requirements Document Chapter 7: `Fueling & Refueling Sys)
- ML20138B843 + (Forwards Advanced LWR Requirements Document Chapter 1, Overall Requirements, Topic Papers for Comment by 860115. NRC Approval Expected to Be Part of SER for Each Chapter)
- ML19325E395 + (Forwards Advanced LWR Requirements Document,Chapter 10: Man-Machine Interface Sys, Advanced LWR Requirements Document Topic Paper Re Chapter 4,Reactor Pressure Vessel Level Instrumentation for PWR & Forwarding Ltr)
- ML20034E697 + (Forwards Advanced LWR Requirements SER Status,Dec 1992 & Jan 1993. Substantial Progress Made Towards Charting Course for Resolution of Issues of Regulatory Treatment of Sys in Passive Designs)
- ML20055C938 + (Forwards Advanced Medical Sys,Inc Re Region III Retaliation Against Vendor.Assistance in Preventing Further Harassment & Compensation for Financial Damage by NRC Against Licensee Requested)