Forwards Advance Route Approval Info for Shipment to Hanford,Wa Matl Containing Irradiated Reactor Fuel.Planned Food & Fuel Stops Should Be Finalized Upon Route Approval
ML19254C988
Person / Time
Site: 07000754
Issue date: 08/15/1979
From: Young W
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 7910190236
Download: ML19254C988 (4)


Text

P6L 2 D'7I e>,

PQg SG

  • Lh S E N E R A L g.H4 CT R ! C NUCLEAR ENERGY

$ O2.

BUSINESS GROUP n.

GENERAL Ei.ECTP'C CCMP ANv 175 CUSD.E3 At/E.. St N JOSE. C1.UCCPNir. 95125 h

I x-

-ftp 9-~-

August 15, 1979 Director, Office of Nuclear Shterial Safety 5 Safeguards U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Please find enclosed infor aticn requesting route approval in accord-ance with 10CFR Part 75 for shipments of waste material centaining irradiated reactor fuel.

The material will be shipped from General Electric Vallecitos Nuclear Center to Nuclear Engineering at Hanford/Richland, Washington.

A primary and alternate routing has been submitted for your review.

It is our opinion that the planned step-overs for food and fuel be finali:ed upon an approved route. This type of information must be obtained in conjunction with the carrier after rcute approval and based on the type of equipment required to acccmplish the move.

It is our intentien to utilize Tri-State 3btor Transit for all of the shipments.

If you have any questiens regarding these shipr.ents, please contact the undersigned. 'Ihank you for your cooperation.

Sincerely, d.

' {&

..ayne cung, special'.

Hazardcus Shterials Transportation 408-925-2555 cc:

F. D. Flcwers 12003 enc 1:

C. C. Congden J. Tenorio J. Tuttle hT/sh

/' h j j %

n,,sj b 3 0

M',

j '.8 jy".,

7910190 236

.s.

~

GENERAL h ELECTB!C NUCLEAR ENERGY BUSINESS GROUP GENEA/.L ELECTRIC CCWANY.175 CU ATNEA AVE.. SAN JCSE C:C:N' A 95 25 ADVANCE R0UTE APPR0 VAL INF0RMATION I.

CARGO DESCRIPTION A. QUANTIT( AND TYPE OF Fu1 Due to the ntr.ber of shipments involved (9 or 10),

the quantities, enricF_ments and fissile grams will vary with each shipment.

It is our intention to utilize the same approved rcuting, container, and carrier for each movement; therefore, the quantities listed belcw are of the worst case situatien. No shipments will exceed the following quantities of material:

U-235 Enrich: rent 8.01%

PU Enrichment 90.6637%

Total grams fissile 200 grams B.

CASK IDENTIFICATION USA /9044/B ( ) F G. E. Model 1600 Series C.

LCADED WEIChTS Trailer weight 13,93] lbs.

Cask weight 25,950 lbs.

Truck 18,500 lbs.

II.

ANTICIPATED SCHEDULE 2,_?%

%3 A.

NUliER CF SHIPMENTS A total of 9 or 10 trips will be required.

B.

APPROXIMATE EURATION CF CC)?LETE TRANSFER: 4 3CNIES.

1181 064 Cont'a Page 1 or..a

GEN ER AL I$ ELECTRIC II.

ANTICIPATED SCHEDULE (CONT' D. )

C.

PROPCSED BEGIN AND END DATE.5 Beginning date -- Sept. 18, 1979 Dec. IS, 1979 End date Shipment intervals of everv week or every other week are planned pendin rcute approval.

III.

R0bTd RE'DFcNDATION5' A.

ORIGIN: GENERAL ELECTRIC CO.

VALLECITOS NUCLE.G CENTER VALLECITOS ROAD PLEASANTON, CALIF. 94566 DESTINATION: NUCLEAR ENGI'2ERING HANFORD/RICHLAND, KASHINGION B.

PRDLARY ROUTING CA-84 2 miles I-680 51 miles I-80 14 miles I-505 34 miles I-5 203 miles US-97 305 miles I-80 58 miles US-730 18 miles K\\SH-14 23 miles US-12 14 miles Total-727 miles Elapsed time, 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br />, based on an average of 35 miles per hour.

ALTERNATE RCl; TING CA-84 2 miles I-630 S rlles I-SSO 11 miles VASCO ROAD 15 miles 1187 065 WALNIR BLVD.

4 niles OAK STREET

.3 miles C.A-4 8 ciles CA-160 12 miles CA-12 23 niles Cent'd Page 2 of 3

/.x.

GEN ER AL @ ELECTRIC III.

ECLTE PICC92NDATIONS (CC.NT' D)

B.

ALTERNATE RCUTING I-80 14 miles I-505 34 miles I-5 199 miles US-97 305 niles I-80 55 niles US-730 13 miles NASH-14 23 niles US-12 14 miles Total-753 miles Elapsed time, 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br />, based en an average of 35 miles per hour.

C.

LOCATION OF PLANNED SIDP-0 VERS FOR FOOD AND FUEL STOPS It is our opinion it is in the best interest of the NRC and General Electric that planned stops be finalized once a route is approved.