Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035H789 + (Final, Risk of PWR Inadvertent Criticality During Shutdown & Refueling EPRI Outage Risk Assessment & Mgt (Oram) Program)
- ML20091H033 + (Final, Technical Evaluation Rept,Mcguire Nuclear Station, Station Blackout Evaluation)
- ML18096A388 + (Final, Technical Evaluation Rept,Salem Generating Station, Station Blackout Evaluation)
- ML20094D248 + (Final, Technical Evaluation Rept,San Onofre Nuclear Generating Station,Units 2 & 3,Station Blackout Evaluation)
- ML20210B877 + (Final,Typed TS (Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by)
- ML23115A104 + (Final- NRC Doc Request - BWXT IR 2023-002 - (Public))
- ML22325A107 + (Final- NRC Response to BWXT Closed Pec Transcripts Final NLO Version)
- ML070990501 + (Final- Section C Operating Exam (Folder 3))
- ML21078A127 + (Final-LIC-504 Closure Memo - 03/30/2021)
- ML23055A187 + (Final-NRC Doc Request - WEC FP IR 2023-001)
- ML25084A181 + (Final-Y-90 Me Sc Draft Report-Spring 2025)
- AECM-83-0386, Final/Interim Deficiency Rept PRD-82/14 for Units 1/2, Respectively Re Sheared Bolts on Rear Crankcase Cover of Delaval Diesel Generators.Unit 1 Bolts Not Defective.Unit 2 Rept Due on 850130.Also Reportable Per Part 21 + (Final/Interim Deficiency Rept PRD-82/14 for Units 1/2, Respectively Re Sheared Bolts on Rear Crankcase Cover of Delaval Diesel Generators.Unit 1 Bolts Not Defective.Unit 2 Rept Due on 850130.Also Reportable Per Part 21)
- ML20094H029 + (Final: Dresden, Units 2 & 3 LAR Request for Additional Information to Modify Technical Specifications to Main Steam Isolation Valve Leakage Requirements)
- ML25317A596 + (Final_Draft_Report_UpdateToNUREG_7021_resubmitted_toNRC_9_30_2025v2)
- ML22306A214 + (Finalized Caoa)
- ML22306A212 + (Finalized Caoa)
- ML22306A209 + (Finalized Caoa)
- ML22306A201 + (Finalized Caoa)
- ML22306A189 + (Finalized Caoa)
- ML22306A184 + (Finalized Caoa)
- ML22304A135 + (Finalized Caoa)
- ML22304A127 + (Finalized Caoa)
- ML22304A124 + (Finalized Caoa)
- ML22304A117 + (Finalized Caoa)
- ML22304A114 + (Finalized Caoa)
- ML20141K974 + (Finalized Graded QA Program Operations QA Plan)
- ML14276A197 + (Finally the Cement Studies Referenced in the Comments to the EA for PINGP)
- ML19308A373 + (Financial & Antitrust Review)
- ML20024G855 + (Financial & Statistical Info)
- ML13311A236 + (Financial & Statistical Rept 1979)
- ML18303A105 + (Financial Accounting and Integrated Management Information System (Faimis))
- ML24263A086 + (Financial Accounting and Integrated Management Information System (Faimis) Pia)
- ML25240A900 + (Financial Accounting and Integrated Management Information System (Faimis) Pia)
- ML20004F260 + (Financial Alternatives for Stabilization,Reclamation & Long-Term Monitoring & Maint of U Mill Tailing Piles)
- ML20117A799 + (Financial Analysis of Potential Retrospective Premium Assessments Under the PRICE-ANDERSON System)
- ML13016A178 + (Financial Assurance Costs for Decommissioning Activities)
- ML18288A141 + (Financial Assurance Documents and Financial Statements for June 30, 2018 and 2017 for the Reed Institute Dba Reed College)
- ML18288A150 + (Financial Assurance Documents and Financial Statements for June 30, 2018 and 2017 for the Reed Institute Dba Reed College)
- EPID:L-2018-LLL-0028 + (Financial Assurance Documents and Financial Statements for June 30, 2018 and 2017 for the Reed Institute Dba Reed College)
- ML22175A097 + (Financial Assurance Information for Kewaunee License Transfer)
- EPID:L-2023-LLE-0008 + (Financial Assurance Information for Kewaunee License Transfer)
- ML19288A062 + (Financial Assurance Instruments to Support the NFS Decommissioning Funding Plan)
- NL-13-1669, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1) and (2)) Response to NRC Request for Additional Information + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1) and (2)) Response to NRC Request for Additional Information)
- NL-05-0483, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (1O CFR 50.75(f)( I) + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (1O CFR 50.75(f)( I))
- NL-11-0451, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- NL-17-0434, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- NL-17-0433, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- NL-17-0432, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- NL-19-0284, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- NL-19-0285, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)
- NL-19-0283, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors + (Financial Assurance Requirements for Decommissioning Nuclear Power Reactors)