MONTHYEARML24009A1092024-01-0909 January 2024 Acceptance of Westinghouse Electric Company, LLC Request to Exempt From10 CFR 70.50(b)(1) ML23355A1542023-12-20020 December 2023 WEC Acceptance 2023 DFP Surety Bond Change ML23184A1022023-06-30030 June 2023 Westinghouse Acceptance E-mail- Hematite Ash Part II ML23055A1872023-02-24024 February 2023 Final-NRC Doc Request - WEC FP IR 2023-001 ML23045A2042023-02-0909 February 2023 Email - RAI for Westinghouse Hematite Ash Part I EPID L-2022-LLA-0177 ML22320A0922022-11-0303 November 2022 Westinghouse Acceptance Email for Removal of Flywheel and Corrections to La ML22250A6642022-09-0707 September 2022 (External_Sender) Proposed Licenses Renewal for the Westinghouse Columbia Fuel Fabrication Facility ML22137A2752022-05-16016 May 2022 E-mail from Elizabeth Johnson, Sc SHPO - Re; Westinghouse Columbia Fuel Fabrication Facility (CFFF) Revised Draft Cultural Resources Survey Richland County ML22053A1432022-02-16016 February 2022 Email to P. Donnelly (Westinghouse) Acknowledging Receipt of 2022 ISA Summary ML21278A5242021-09-30030 September 2021 Stewart Review of Draft Environmental Assessment for Westinghouse Columbia Alternative Disposal Request ML21288A4082021-09-21021 September 2021 South Carolina State Historic Preservation Office Comments Westinghouse Columbia Fuel Fabrication Facility License Renewal Draft Environmental Impact Statement and Section 106 Review ML21288A2792021-09-20020 September 2021 Comment (15) E-mail Regarding WEC CFFF Draft EIS ML21257A4682021-09-13013 September 2021 Request for Additional Information Related to Westinghouse Electric Company, LLC, Exemption Request for Alternate Disposal of Specific Waste (Enterprise Project Identifier L 2021-Lla-0101) ML21252A0862021-09-0808 September 2021 Transmittal Email to Crow Butte Resources, Inc., Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe ML21252A0882021-09-0808 September 2021 Transmittal Email to Oglala Sioux Tribe Survey Methodology Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal ML22164A9342021-08-17017 August 2021 WEC 2021 Donnelly ML21342A0402021-08-0606 August 2021 Transmittal to U.S. Fish and Wildlife Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0412021-08-0606 August 2021 Transmittal to U.S. National Marine Fisheries Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0392021-08-0606 August 2021 Transmittal to U.S. National Park Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0382021-08-0606 August 2021 Transmittal to U.S. Environmental Protection Agency, Region 4, of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21194A1522021-07-12012 July 2021 E-mail from E. Malek, Westinghouse, to D. Tiktinksy, NRC, Westinghouse Columbia Facility Cultural Resource Survey Letter to Sc Shpo ML21166A1052021-06-14014 June 2021 Acceptance Review of Amendment/Exemption Request for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21141A1502021-03-24024 March 2021 Additional Clarifications to Cfff RAIs 03/24/2021 ML21082A0492021-03-18018 March 2021 Clarifications to EIS RAIs for Cfff ML20252A1892020-08-28028 August 2020 Email Response to Pine Hill Indian Tribe Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20226A2682020-07-31031 July 2020 NRC E-mail to M.Caldwell, Fish and Wildlife, Westinghouse Environmental Impact Statement (EIS) Scoping Process ML20226A3802020-07-31031 July 2020 NRC E-mail to Reese, Westinghouse Environmental Impact Statement Scoping Process ML20227A1152020-07-31031 July 2020 NRC E-mail to Catawba Indian Nation, Westinghouse Environmental Impact Statement Scoping Process ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20091L4452020-03-27027 March 2020 Email from K. Taylor, SCDHEC, to J.Quintero, NRC Regarding Extending Comment Period for Westinghouse Draft EA ML20014E6722020-01-14014 January 2020 1-14-20 Email Acceptance for Review of Westinghouse Electric Company Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code Paragon2 ML19322A0082019-12-19019 December 2019 Final Safety Evaluation Transmittal Email WCAP-16097, Revision 4, Common Qualified Platform Topical Report ML19343A0552019-12-0909 December 2019 12-9-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0 Updated Nexus Cross-Section Meth ML19325D7312019-11-21021 November 2019 11-21-19 Email Acceptance for Review of Westinghouse Electric Company Request to Modify Safety Evaluation Report on Wcap-12472-P-A, Beacontm Core Monitoring and Operations Support System. ML19311C5912019-11-0707 November 2019 11-07-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP 16747 P/Wcap 16747 Np, Appendices C and D, Polca T: System Analysis Code with Three Dimensional Core Mode ML19295C9792019-10-22022 October 2019 Transmittal Email Draft Proprietary Safety Evaluation for WCAP-16096, Rev 4 ML19219A2422019-07-16016 July 2019 Email to Sc Shpo/Department of Archives & History Regarding Nrc'S Preliminary Determination Regarding Historic and Cultural Resources at Westinghouse'S Columbia Fuel Fabrication Facility ML19191A0742019-07-10010 July 2019 NRC to NMFS, Update on NRC Review of Westinghouse Cfff License Renewal ML19178A0102019-06-25025 June 2019 Email to Fws Requesting Reconcurrence on ESA Findings for WEC Cfff LRA ML19038A2112019-02-0707 February 2019 NRC Acceptance of Westinghouse January 2019 Updated Integrated Safety Analysis (ISA) Summary ML19031C6572019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of Westinghouse 10 CFR 70.72 Facility Change Report Summarizing Changes Completed within 2018 ML19031C9162019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of the Fundamental Nuclear Material Control Rev. 43 and Emergency Plans Rev. 18 for Formal Review ML19077A2082019-01-29029 January 2019 Email: NRC Request for Clarification on Westinghouse Electric Company Request to Release Additional Funds from Financial Assurance for Cfff ML18352B1042018-12-21021 December 2018 Summary for Pre-Application Call with Westinghouse Cfff for Removal of the Administration Building from the Controlled Access Area ML18323A0992018-11-14014 November 2018 Westinghouse Pre-Application Meeting Request for Proposed Change to the Controlled Access Area ML18138A2302018-05-0909 May 2018 Email to Westinghouse - License Transfer FRN ML18117A1302018-04-27027 April 2018 Email from SCDHEC Dated 042718 Regarding Comments on the Draft EA for Cfff License Renewal ML18025A3182018-01-24024 January 2018 NRC Email to Furtak NMFS 012418 ML17356A2232017-12-13013 December 2017 Enclosure 3 - Email with NRC Consultation Examples ML18338A2842017-07-10010 July 2017 Email to Close the Review of Non-Substantive Revision to Sppp Submitted by Letter GLE-2017-0015 Dated March 6, 2017 2024-01-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23055A1872023-02-24024 February 2023 Final-NRC Doc Request - WEC FP IR 2023-001 ML23045A2052023-02-0909 February 2023 RAIs WEC Ash Part 1 ML22049A3022022-02-18018 February 2022 Westinghouse Columbia Fuel Fabrication Facility - Request for Additional Information - LRA ML21257A4682021-09-13013 September 2021 Request for Additional Information Related to Westinghouse Electric Company, LLC, Exemption Request for Alternate Disposal of Specific Waste (Enterprise Project Identifier L 2021-Lla-0101) ML21082A0492021-03-18018 March 2021 Clarifications to EIS RAIs for Cfff ML20275A2512020-11-0303 November 2020 Letter to Westinghouse with RAIs Regarding Environmental Review for Proposed Renewal of Cfff License ML20294A2162020-10-20020 October 2020 Document Request for NRC Inspection at Westinghouse Columbia Fuel Fabrication Facility, Inspection Report 2020004 ML20230A0202020-09-0404 September 2020 Letter to E. Malek: RAI - WEC Request for Alternate Disposal Approval of Specified Low-Activity Radioactive Materials ML20120A5382020-04-30030 April 2020 Request for Additional Information Westinghouse Electric Company Topical Report Quality Management System (Qms), Revision 8.0 ML19108A1402019-05-14014 May 2019 Non-Prop Enclosure 1 Request for Additional Information Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML18308A0092019-01-18018 January 2019 Enclosure - 2nd Round Nepa RAIs for the Westinghouse Columbia Fuel Fabrication Facility License Renewal Application (LRA) ML18263A1972018-09-24024 September 2018 Request for Additional Information Westinghouse Electric Co. WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement TR - Second Round ML18207A3592018-08-0909 August 2018 Non-Proprietary Enclosure 1 Request for Additional Information for Westinghouse Electric Company Topical Report WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate Method for Subcritical Reactivity Measurement ML18018A0052018-02-26026 February 2018 RAIs for WCAP-16096-P/NP, Revision 5 Software Program Manual ML17352A0142018-01-16016 January 2018 Request for Additional Information Westinghouse Electric Company WCAP-18032-P, Revision 0 and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio Topical Report (Enclosure 1/Non-Prop) 2023-02-09
[Table view] |
Text
Joel Rivera Ortiz
From: Joel Rivera Ortiz Sent: Thursday, February 16, 2023 2:54 PM To: Donnelly, Patrick Cc: Subosits, Stephen G; Leonard Pitts; Joseph Grice; Thomas Vukovinsky
Subject:
Document Request - NRC Inspection on March 13, 2023 Attachments: NRC Doc Request - WEC FP IR 2023-001.pdf
Dear Patrick Donnelly,
The NRC will conduct a routine inspection at the Columbia Fuel Fabrication Facility on March 13, 2023. The inspection will implement the followi ng NRC inspection procedure(s) (IP):
IP 88055 - Fire Protection (Inspector: Joel Rivera-Ortiz, Leonard Pitts, Joseph Grice (In-Training ))
This email requests a number of documents that we would like to obtain for our preparation activities ( see attachment).If practical, we would like to have the documents at least a week prior to the inspection to facilitate our preparation and be able to conduct a productive inspection. In the attachment, we also specify additional documents and support needed for the on-site portion of the inspection.
If you have any questions or concerns regarding this request, please contact me to discuss.
Best Regards, Joel Rivera-Ortiz Sr. Fuel Facility Inspector U.S. Nuclear Regulatory Commission/Region-II Division of Fuel Facility Inspection Projects Branch 1
404-997-4825 Joel.Rivera-Ortiz@nrc.gov
1 ML23055A187 U.S. Nuclear Regulatory Commission - Region II 245 Peachtree Center Ave. N.E.
Atlanta, GA 30303-1200
February 16, 2023
INSPECTION DOCUMENT REQUEST
Licensee: Westinghouse Electric Company, LLC
Facility: Columbia Fuel Fabrication Facility (Columbia, SC)
Docket Number: 07001151
License Number: SNM-1107
Inspection Report Number: 2023-001
Enterprise Number: EPID: I-2023-001-0054
Inspection Dates: March 13 - 16, 2023
Inspection IP 88055 - Fire Protection Procedure(s):
Inspector(s): Joel Rivera-Ortiz (Team Leader) P: 404-997-4825 Sr. Fuel Facility Inspector E: Joel.Rivera-Ortiz@nrc.gov U.S. Nuclear Regulatory Commission Region-II Office
Leonard Pitts P: 404-997-4708 Sr. Fuel Facility Inspector E: Leonard.Pitts@nrc.gov U.S. Nuclear Regulatory Commission Region-II Office
Joseph Grice Fuel Facility Inspector (In-Training) P: 404-997-4657 U.S. Nuclear Regulatory Commission E: Joseph.Grice@nrc.gov Region-II Office Inspection Document Request for NRC Inspection at Nuclear Fuel Services, Inc.
The following is a request of documents the U.S. Nuclear Regulatory Commission (NRC) inspectors are interested in reviewing prior to the on-site inspection visit consistent with the guidance in NRC Inspection Manual Chapter 0620, Inspection Documents and Records. The documents provided in response to this request should contain enough information to facilitate the selection of specific inspection samples. Please provide the current version of these documents unless specified otherwise. If any of the information requested below does not apply to the facility, please specify in your response. The licensee is not required to provide documents that are already available in ADAMS. Electronic media is preferred for receiving the information, if readily available (preferably Microsoft Word format or searchable.pdf files). The NRC can establish a secure cloud-based file storage service to facilitate document sharing as needed. If there are any questions or concerns regarding the information requested, please contact the NRC inspection team lead.
INSPECTION PROCEDURE 88055 - FIRE PROTECTION
Documents Requested for In-Office Preparation
- 1) Organization chart for the fire protection organization, including names and contact information of licensee personnel expected to support this inspection
- 2) Fire protection program document and asso ciated implementing procedures, including procedures for:
- a. control of transient combustibles, ignition sources, and inert atmospheres
- b. storage and handling of combustible and flammable materials
- c. fire brigade response
- d. inspection, testing, and maintenance of fire protection systems including
- 1. fire and gas detection and alarm systems
- 2. fire dampers
- 3. fire barriers, including penetration seals
- 4. suppression systems
- 5. fire-fighting equipment
- 6. passive fire protection systems
- 7. emergency lightning
- 8. communication equipment
- 3) Description of changes to fire-related IROFS since the last NRC inspection in this area
2
- 4) List and brief description of corrective action program entries related to fire protection since the last NRC inspection in this area
- 5) Copy of corrective action program entries related to fire protection since the last NRC inspection in this area that resulted in a root cause, apparent cause, or extent of condition evaluation
- 6) Description of fire protection issues sinc e the last NRC inspection in this area that resulted in compensatory measures
- 7) Copy of most recent audits or self-assessments related to fire protection
- 8) List of plant areas with the potential to have intermediate or high consequence events as a result of a fire.
- 9) Description of any fire-related surveillance or testing scheduled for the week of the NRCs inspection
- 10) Description of any fire brigade drills scheduled for the week of the NRCs inspection
- 11) List of NFPA Codes and respective editions incorporated into the facilitys fire protection program based on Chapter 8, Fire Safety Program, of the license application
- 12) List of NFPA equivalency justifications approved by the Authority Having Jurisdiction
Documents/Support Requested for Onsite Inspection
- 1) Site support for plant tours of process areas and demonstration of fire protection equipment availability and functionality
- 2) Site support to coordinate interviews with fire-fighting representatives
- 3) Any updates to the Fire Protection Program that have occurred since this inspection information request
- 4) Complete records of selected surveillance tests for fire protection equipment including passive components (e.g., fire area boundaries, fire barriers, penetration seals, work area inspections, etc.) and active components (e.g., detection devices, water-based suppression, fire water pumps flow/pressure tests, fire water tanks, gaseous suppression, fire extinguishers, etc.)
- 5) Records confirming that training and qualifications for fire brigade personnel have been maintained
- 6) Copy of pre-fire plan(s) for selected process areas
- 7) Copy of the Fire Hazard Analysis or Fire Safety Analysis for selected process areas with the potential to have intermediate or high consequence events
3
- 8) Copy of fire safety training given to employees and operators, including operator training to recognize exothermic reactions
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009)
Office of Management and Budget, Washington, DC 20503.