Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24149A268 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 13, Conduct of Operations)
- ML24149A250 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 2, Site Characteristics)
- ML24149A289 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, List of Content of Tables)
- ML24149A266 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 16, Technical Requirements)
- ML24149A284 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 17, Quality Assurance)
- ML24149A249 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 7, Instrumentation and Controls)
- ML24149A283 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 19, License Renewal Supplement)
- ML24149A281 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Index to NRC Questions and Responses)
- ML24149A255 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 6, Engineered Safety Features)
- ML24149A254 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 3, Design of Structures Components Equipment and Systems)
- ML24149A271 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 9, Auxiliary Systems)
- ML24149A278 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, List of Figures)
- ML24149A262 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 14, Initial Test Program)
- ML24149A280 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 18, Response to NUREG-0737, Clarification of TMI Action Plan Requirements)
- ML24149A251 + (Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25, Chapter 4, Reactor)
- ML17072A015 + (Final Safety Analysis Report Text, Revision OL-22, Chapter 4, Reactor)
- ML100320678 + (Final Safety Analysis Report Update - Revision 28)
- ML11123A168 + (Final Safety Analysis Report Update - Revision 29)
- ML16013A418 + (Final Safety Analysis Report Update Rev. 30 Cover Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes)
- ML25078A352 + (Final Safety Analysis Report Update Revision 37)
- ML25078A351 + (Final Safety Analysis Report Update Revision 37)
- ML11145A034 + (Final Safety Analysis Report Update, 2.5 Geology and Seismology Through Figure 2.5-32 Free Field Spectra Vertical Hosgri 7.5M/NEWMARK Rev. 11)
- ML11145A035 + (Final Safety Analysis Report Update, 3.7 Seismic Design Through Figure 3.7-29, Derivation of Design Response Spectra for a Typical Piping System)
- ML16120A325 + (Final Safety Analysis Report Update, Revision 32, Chapter 1 - Introduction and General Description on Plant - References)
- ML16120A420 + (Final Safety Analysis Report Update, Revision 32, Chapter 6 - Engineered Safeguards Systems - Sections)
- DCL-00-078, Final Safety Analysis Report Update, Revision 18 and Technical Specification Bases, Revision 5 + (Final Safety Analysis Report Update, Revision 18 and Technical Specification Bases, Revision 5)
- ML16120A382 + (Final Safety Analysis Report Update, Revision 32, Chapter 4 - Primary Coolant System - Tables)
- ML16120A361 + (Final Safety Analysis Report Update, Revision 32, Chapter 3 - Reactor - Sections)
- ML16123A316 + (Final Safety Analysis Report Update, Revision 32, Chapter 13 - Initial Tests and Operations - Sections)
- ML16120A327 + (Final Safety Analysis Report Update, Revision 32, Chapter 1 - Introduction and General Description on Plant - Tables)
- ML16120A345 + (Final Safety Analysis Report Update, Revision 32, Chapter 2 - Site and Environment - References)
- ML16123A329 + (Final Safety Analysis Report Update, Revision 32, List of Effective Pages)
- ML16123A328 + (Final Safety Analysis Report Update, Revision 32, Chapter 15 - Quality Assurance Program - Sections)
- ML16120A573 + (Final Safety Analysis Report Update, Revision 32, Chapter 7 - Instrumentation and Controls - References)
- ML16120A359 + (Final Safety Analysis Report Update, Revision 32, Chapter 3 - Reactor - Figures)
- ML16120A597 + (Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Sections)
- ML16120A603 + (Final Safety Analysis Report Update, Revision 32, Chapter 10 - Steam and Power Conversion System - Sections)
- ML16120A589 + (Final Safety Analysis Report Update, Revision 32, Chapter 8 - Electrical Systems - References)
- ML16120A590 + (Final Safety Analysis Report Update, Revision 32, Chapter 8 - Electrical Systems - Sections)
- ML16120A602 + (Final Safety Analysis Report Update, Revision 32, Chapter 10 - Steam and Power Conversion System - Figures)
- ML16120A417 + (Final Safety Analysis Report Update, Revision 32, Chapter 5 - Design of Structures, Systems and Components - Tables)
- ML16120A571 + (Final Safety Analysis Report Update, Revision 32, Chapter 7 - Instrumentation and Controls - Appendices)
- ML16123A315 + (Final Safety Analysis Report Update, Revision 32, Chapter 12 - Conduct of Operations - Sections)
- ML16120A344 + (Final Safety Analysis Report Update, Revision 32, Chapter 2 - Site and Environment - Figures)
- ML16120A347 + (Final Safety Analysis Report Update, Revision 32, Chapter 2 - Site and Environment - Tables)