Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000364/FIN-2010005-01 + (Failure to Follow Station Guidance on Use of Extension Cords and Placement of Equipment in Safety-Related Cable Trays)
- 05000458/FIN-2016002-01 + (Failure to Follow Station Guidance on Use of Temporary Power Cables and Control of Transient Combustibles)
- 05000313/FIN-2009003-02 + (Failure to Follow Station Planning Procedure Results in an Inadequate Work Instructions)
- 05000298/FIN-2012002-08 + (Failure to Follow Station Procedure Results in Inadequate Work Instructions)
- 05000482/FIN-2013003-01 + (Failure to Follow Station Procedures)
- 05000313/FIN-2008003-03 + (Failure to Follow Station Procedures While Troubleshooting)
- 05000461/FIN-2015004-03 + (Failure to Follow Station Procedures for Plant Activities)
- 05000361/FIN-2011002-01 + (Failure to Follow Station Procedures for Seasonal Readiness)
- 05000361/FIN-2010003-11 + (Failure to Follow Station Procedures on Written Instruction Use and Adherence)
- 05000528/FIN-2014007-02 + (Failure to Follow Station Process for Root Cause Evaluation)
- 05000313/FIN-2010004-04 + (Failure to Follow Station Work Control Procedure Results in Unavailable Equipment)
- 05000397/FIN-2011008-02 + (Failure to Follow Suppression Pool Cooling Procedure)
- 05000389/FIN-2017004-02 + (Failure to Follow Surveillance Maintenance Procedure Resulting in a Condition Prohibited by Technical Specifications)
- 05000254/FIN-2012005-02 + (Failure to Follow Surveillance Procedure)
- 05000298/FIN-2009005-01 + (Failure to Follow Surveillance Procedure Causes Near Toxic Gas Release)
- 05000298/FIN-2012004-10 + (Failure to Follow Surveillance Procedures for Reactor Equipment Cooling)
- 05000331/FIN-2009005-02 + (Failure to Follow Surveillance Test Procedure Results in Automatic Reactor Scram)
- 05000528/FIN-2013009-04 + (Failure to Follow Surveillance Testing Procedure)
- 05000237/FIN-2011002-06 + (Failure to Follow TS 5.5.2 Implementing Procedures)
- 05000440/FIN-2011003-02 + (Failure to Follow TS Bases)
- 05000458/FIN-2014003-01 + (Failure to Follow Tagging Clearance Instructions)
- 05000298/FIN-2014002-04 + (Failure to Follow Tagout Procedure)
- 05000382/FIN-2009004-01 + (Failure to Follow Technical Specification Requirements for Reactor Protective Instrumentation)
- 05000237/FIN-2009004-05 + (Failure to Follow Technical Specification 5.5.2 Implementing Procedures)
- 05000237/FIN-2010002-02 + (Failure to Follow Technical Specification 5.5.4 Implementing Procedure)
- 05000331/FIN-2015004-04 + (Failure to Follow Temporary Configuration Control Procedure)
- 05000266/FIN-2010002-03 + (Failure to Follow Temporary Modification Procedure)
- 05000311/FIN-2017009-01 + (Failure to Follow Troubleshooting Procedure for BIT Relief Valve Leakage)
- 05000220/FIN-2011005-03 + (Failure to Follow Valve Packing Procedure)
- 05000346/FIN-2008002-01 + (Failure to Follow Welding Procedures)
- 05000373/FIN-2013005-01 + (Failure to Follow Winter Operation Preparation Procedure)
- 05000285/FIN-2013010-05 + (Failure to Follow Work Control Procedures)
- 05000361/FIN-2010003-05 + (Failure to Follow Work Control Procedures)
- 05000298/FIN-2008003-05 + (Failure to Follow Work Control Program Procedures)
- 05000456/FIN-2009005-03 + (Failure to Follow Work Instructions During Restoration of 2SX173)
- 05000416/FIN-2010002-02 + (Failure to Follow Work Instructions Results in Loss of Buss and a Plant Transient)
- 05000389/FIN-2014005-01 + (Failure to Follow Work Instructions during Installation of Unit 2 Vent Valve V3811)
- 05000298/FIN-2016002-02 + (Failure to Follow Work Instructions for Post-Maintenance Testing of Safety-Related Ventilation Systems)
- 05000254/FIN-2009002-02 + (Failure to Follow Work Instructions for 2A Core Spray Check Valve)
- 05000338/FIN-2013005-01 + (Failure to Follow Work Instructions for the Replacement of Protective Relays Causes a Unit 1 Reactor Trip Due to Loss of Station Service Bus Transformer After Start of 1C Condensate Pump)
- 05000397/FIN-2011005-01 + (Failure to Follow Work Instructions when Fabricating a Gagging Device for Main Condenser Hotwell Surge Bypass Valve)
- 05000255/FIN-2012003-03 + (Failure to Follow Work Management Process for Reactor Head Work)
- 05000255/FIN-2012004-01 + (Failure to Follow Work Management Processes)
- 05000382/FIN-2011005-05 + (Failure to Follow Work Order Instructions to Install a Swagelok Fitting on a Main Feedwater Isolation Valve Tube Connection)
- 05000445/FIN-2015001-03 + (Failure to Follow Work Planning Procedure)
- 05000317/FIN-2010005-02 + (Failure to Follow Written Procedures During Calibration of the 1A DG SR Ventilation Temperature Controller)
- 05000361/FIN-2009009-01 + (Failure to Follow a Level 1 Quality Assurance Program Affecting Human Performance Procedure)
- 05000302/FIN-2009005-01 + (Failure to Follow a Plant Procedure Resulted in an Inoperable HPI System)
- 05000416/FIN-2012003-05 + (Failure to Follow a Post-Modification Test Procedure)
- 05000275/FIN-2011004-06 + (Failure to Follow a Procedural Requirement for Reactivity Manipulation)
- 05000416/FIN-2011003-08 + (Failure to Follow a Procedure Resulting in the Inoperability of the Reactor Core Isolation Cooling System Primary Containment Isolation Valve)