- ENS 54735 + (Failed Fitness for Duty Test)
- ENS 55297 + (Failed Fitness for Duty Test)
- ENS 55649 + (Failed Fitness for Duty Test)
- ENS 55768 + (Failed Fitness for Duty Test)
- ENS 56281 + (Failed Fitness for Duty Test)
- ENS 56346 + (Failed Fitness for Duty Test)
- ENS 56367 + (Failed Fitness for Duty Test)
- ENS 56648 + (Failed Fitness for Duty Test)
- ENS 56652 + (Failed Fitness for Duty Test)
- ENS 56858 + (Failed Fitness for Duty Test)
- ENS 57616 + (Failed Fitness for Duty Test)
- ENS 57640 + (Failed Fitness for Duty Test)
- ENS 57772 + (Failed Fitness for Duty Test)
- ENS 49030 + (Failed Fitness-For-Duty Test)
- ENS 50457 + (Failed Fuel Assembly Identified During Core Off-Load)
- ML20263G709 + (Failed Fuel Container Storage Rack Details)
- 2CAN010204, Failed Fuel Percentage for Shaft Seizure Accident and Corrections to Environmental Information Regarding ANO-2 Power Uprate + (Failed Fuel Percentage for Shaft Seizure Accident and Corrections to Environmental Information Regarding ANO-2 Power Uprate)
- 05000440/LER-2018-002, Failed Fuse Leads to Loss of Safety Function + (Failed Fuse Leads to Loss of Safety Function)
- ENS 55815 + (Failed Indicator)
- ENS 43435 + (Failed Instrument Air Header Leads to Manual Reactor Trip)
- ENS 49846 + (Failed Power Supply Affecting Radiation Monitors)
- ENS 48142 + (Failed Pre-Access Fitness for Duty Test)
- ENS 54803 + (Failed Radiation Detector)
- 05000280/LER-2025-001, Failed Relay Caused Reactor Trip + (Failed Relay Caused Reactor Trip)
- ENS 44221 + (Failed Relay Causes Emergency Diesel Generator to Start)
- ENS 43498 + (Failed Relay Starts One Train of the Decay Heat River Water System)
- ENS 55171 + (Failed Shutter Handle on Nuclear Gauge)
- ENS 56994 + (Failed Source Leak Test)
- ENS 43524 + (Failed Source Shield Lock on Moisture Density Gauge)
- 05000305/FIN-2011003-03 + (Failed Standoffs Result in an Inoperable Train of Shield Building Ventilation)
- ENS 52722 + (Failed Ultrasonic Testing of Weld)
- 05000305/FIN-2012009-04 + (Failed to Consider Multiple Failures in ES-1.3, Transfer to Containment Sump Recirculation as Required by ITS, Section 5.4.1b))
- 05000331/FIN-2013008-02 + (Failed to Ensure the SBDG Power Cables Were Not Submerged)
- 05000317/FIN-2010006-05 + (Failed to Establish Adequate Procedures for Letdown Restoration)
- 05000331/FIN-2013008-01 + (Failed to Establish Measures for the Selection and Review for the Suitability of Safety-Related Cables)
- 05000333/FIN-2009002-02 + (Failed to Submit an LER For a Condition Prohibited by TX Associated With EDG Fuel Oil Supply)
- 05000286/FIN-2012002-01 + (Failed to Submit an LER for a Single Cause of Two Auxiliary Boiler Feedwater Trains Inoperable)
- 05000286/FIN-2012002-03 + (Failed to Update Operating Procedures and Licensing Basis Documents with Nitrogen Backup System Design and Support Function for AFW System Operability)
- 05000461/FIN-2017001-02 + (Failed to Verify an Appropriate Alternate Method of Decay Heat Removal)
- 05000354/FIN-2017010-01 + (Failed to follow site procedures resulting in a reactor scram)
- 05000247/FIN-2013011-02 + (Failing to initiate a condition report or otherwise report the condition such that a Licensee Event Report could be written)
- 05000261/FIN-2009003-02 + (Failre to follow procedures while performing maintenance on an emergency diesel generator.)
- 05000250/FIN-2009003-03 + (Failrue to Maintain Lighting Impedes Compensatory Measure For Failed Fire Detection)
- 05000382/FIN-2012007-02 + (Failue to Calculate Adequate Cooling Provided to Diesel Generator B within Required Time)
- 05000382/FIN-2012008-04 + (Failue to Ensure Operator Knowledge of Equipment Status)
- 05000458/FIN-2012010-04 + (Failue to Implement Effective Corrective Actions for Lockout Relay Failures)
- 05000390/FIN-2012002-02 + (Failur to Comply with Technical Specification 3.4.12 by Allowing a Safety Injection Pump to Inject Into the RCS in Mode 5)
- 05000289/FIN-2017008-01 + (Failure to Correct Deficiency in Implementing Controls for Pre-Staging Material in the Reactor Building)
- 05000261/FIN-2017001-02 + (Failure to Submit Complete and Accurate Information for a Requested License Amendment)
- 05000416/FIN-2017007-02 + (Failure to Correct Standby Diesel Generator Trip)