Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14127A480 + (Extended Power Uprate License Amendment Request - Supplement 26 Response to Request for Additional Information)
- ML13260A076 + (Extended Power Uprate License Amendment Request - Supplement 11 Response to Request for Additional Information)
- ML13240A002 + (Extended Power Uprate License Amendment Request - Supplement 9 Response to Request for Additional Information)
- L-2012-160, Extended Power Uprate License Amendment Request - Comments Pertaining to the NRCs Essential Fish Habitat Assessment + (Extended Power Uprate License Amendment Request - Comments Pertaining to the NRCs Essential Fish Habitat Assessment)
- ML14072A022 + (Extended Power Uprate License Amendment Request - Supplement 22 Response to Request for Additional Information)
- ML14031A422 + (Extended Power Uprate License Amendment Request- Supplement 18 Response to Request for Additional Information, Corrections and Clarifications - Extended Power Uprate)
- ML13308A331 + (Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information)
- ML13149A145 + (Extended Power Uprate License Amendment Request - Supplement 3 Response to Request for Additional Information - Extended Power Uprate)
- L-10-384, Extended Power Uprate Licensing Report, Attachment 6; Applications for Withholding Proprietary Information from Public Disclosure + (Extended Power Uprate Licensing Report, Attachment 6; Applications for Withholding Proprietary Information from Public Disclosure)
- ML103560451 + (Extended Power Uprate Licensing Report, Attachment 6; Applications for Withholding Proprietary Information from Public Disclosure)
- L-2010-259, Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years + (Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years)
- ML103560448 + (Extended Power Uprate Licensing Report, Attachment 5; Appendix G, WCAP-17197-NP, Revision 0, RCS Pressure and Temperature Limits and Low-Temperature Overpressure Protection Report for 54 Effective Full Power Years)
- ML103560425 + (Extended Power Uprate Licensing Report, Attachment 4; Appendix D, List of Key Acronyms)
- ML103560442 + (Extended Power Uprate Licensing Report, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Features Actuation and Control Systems)
- ML103560449 + (Extended Power Uprate Licensing Report, Attachment 5; Appendix H, Grid Stability Analysis and System Impact Study with Proposed EPU)
- ML042920317 + (Extended Power Uprate Licensing Report, Revision 0)
- L-04-125, Extended Power Uprate Licensing Report, Supplemental Information + (Extended Power Uprate Licensing Report, Supplemental Information)
- ML103560450 + (Extended Power Uprate Licensing Report, Attachment 5; Appendix I, Holtec Criticality Analysis Reports)
- ML103560434 + (Extended Power Uprate Licensing Report, Attachment 5, Appendix C, ANP-2903(NP), Revision 0, EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding)
- ML103560452 + (Extended Power Uprate Licensing Report, Attachment 7; Summary of Regulatory Commitments)
- ML103560443 + (Extended Power Uprate Licensing Report, Attachment 5; Appendix F, Caldon Ultrasonics Engineering Reports)
- ML20210J045 + (Extended Power Uprate Licensing Submittal)
- PLA-6697, Extended Power Uprate Master Procedure TP-299-010 Renewed Operating License No. NPF-022 License Condition 2.C.(20)(c) + (Extended Power Uprate Master Procedure TP-299-010 Renewed Operating License No. NPF-022 License Condition 2.C.(20)(c))
- PLA-6715, Extended Power Uprate Master Test Procedure Supplement, Renewed Operating License No. NPF-22, License Condition 2.C.(20)(c), PLA-6715 + (Extended Power Uprate Master Test Procedure Supplement, Renewed Operating License No. NPF-22, License Condition 2.C.(20)(c), PLA-6715)
- PLA-6603, Extended Power Uprate Master Test Procedure TP-199-013 + (Extended Power Uprate Master Test Procedure TP-199-013)
- W3F1-2002-0106, Extended Power Uprate Methodologies + (Extended Power Uprate Methodologies)
- ML113410172 + (Extended Power Uprate Pre-Application Meeting)
- ML082770565 + (Extended Power Uprate Pre-Application Meeting Slides)
- ML040340205 + (Extended Power Uprate Project - Environmental Assessment and Finding of Significant Impact (Fonsi))
- ML041210253 + (Extended Power Uprate Project - Environmental Assessment and Finding of No Significant Impact (Fonsi))
- CNL-18-106, Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report + (Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report)
- EPID:L-2018-LLL-0022 + (Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report)
- ML042650265 + (Extended Power Uprate Review Schedule)
- ML052630053 + (Extended Power Uprate Review Schedule and License Conditions)
- ML20211J260 + (Extended Power Uprate SAR for Edwin I Hatch Plant Units 1 & 2)
- ML20216B271 + (Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2)
- ML113560333 + (Extended Power Uprate Safety Evaluation)
- ML042640055 + (Extended Power Uprate Schedule)
- ML081010196 + (Extended Power Uprate Startup Test Plan)
- ML092430520 + (Extended Power Uprate Steam Dryer August 7, 2009, Conference Call)
- ML062900162 + (Extended Power Uprate Steam Dryer Evaluation)
- ML092240298 + (Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation (Handout 2))
- ML092190563 + (Extended Power Uprate and Alternate Source Term Review Planning Meeting Presentation)
- L-MT-12-107, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7 + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7)
- L-MT-13-036, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172 + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172)
- L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information)
- L-MT-12-082, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure + (Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure)
- L-MT-08-043, Extended Power Uprate, Acceptance Review Supplemental Information Package 6 + (Extended Power Uprate, Acceptance Review Supplemental Information Package 6)
- L-2009-208, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses + (Extended Power Uprate, Data for NRC Confirmatory EPU Analyses)
- L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses + (Extended Power Uprate, Data for NRC Confirmatory EPU Analyses)
- BSEP 05-0081, Extended Power Uprate, Phase 2 Implementation Test Report + (Extended Power Uprate, Phase 2 Implementation Test Report)