Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071P324 + (Expresses Views on Plant Emergency Preparedness in Light of Newly Submitted State of Ny Interim Plan.Conceptual Problems & Inaccuracies Identified in Plan for Implementing Compensating Measures for Rockland County)
- ML20238E385 + (Expresses Views on Use of Performance Indicators to Support Improved Performance of Us Nuclear Power Plants.Adoption of Formal Performance Indicator Program by NRC Has Potentially Adverse Consequences.Concerns Listed)
- ML19338C458 + (Expresses Willingness to Participate in Study of people- Related Problems in Nuclear Safeguards,In Response to NRC)
- ML20127L344 + (Expresses Wish to Be Intervenor in 700428 Public Hearing on NSP Plant to Be Held in Buffalo,Mn Per 10CFR82.71.4)
- ML17286A358 + (Expresses Wish to Remain on Mailing List to Receive Info Re Plant)
- ML20211J447 + (Expresses backfit-related Concerns of CRGR in Context of Final Operator Licensing Exams Rule (10CFR55),per CRGR 321st Meeting Held on 980610)
- ML20055C254 + (Expresses non-concurrence W/Current Version of Proposed Rulemaking 20.403)
- ML20248J204 + (Expressess Appreciation for 980415 Meeting & Hosted Dinner on Evening of 980418 & for Helping to Make Visit to Tarapur & Narora Atomic Power Stations Succussful.Meeting Provided Opportunity to Discuss Countries Policies)
- ML20196D818 + (Expressess Appreciation for Assistance Given by M Dunleavy)
- ML20235B062 + (Expressess Appreciation for Opportunity to Testify Before Commission on 881209 Re Opposition to Facility Restart,Until Effective Radiological Emergency Response Plans Implemented, Approved & Tested)
- ML20134L939 + (Expressess Appreciation for Thorough & Professional Insp Re Incident Involing Inadvertent Return of Vvr Assembly to Griefswald)
- ML20141H689 + (Expressess Concern & Disappointment W/Response Received from R Fonner Re Request for Assistance on 970507 w/clean-up of Private Residence in Union,Nj W/Tritium from Exit Sign Which Generally Licensed by NRC)
- ML20012B463 + (Expressess Gratitude to Staff for Effort Extended in 1989 Annual Audit)
- ML18283B856 + (Expressing Concern Re Fire at Browns Gerry & Incompetence of TVA & Requesting TVA Be Ordered to Halt Construction And/Or Operation of All of Its Nuclear Plants)
- ML18347A556 + (Expressing Thanks for Letter of 9/1/1976 Describing Confirmatory Measurements Program & Advising CPC Concluded Differences Are Acceptable)
- ML18347A553 + (Expressing Thanks for Letter of 9/1/1976 Describing Confirmatory Measurements Program & Advising CPC Concluded Differences Are Acceptable)
- ML19322A326 + (Expression Alarm & Concern Over Continuing Dangers at TMI Re Dumping of Sr-90 Into Susquehanna River & Kr-85 Into Atmosphere.Requests Documentation Re These Alleged Violations by Util)
- ML19338D804 + (Expression Concern Re Newspaper Article on Accidental Dumping of Radwaste in Chesapeake Bay.Dumping Totally Inexcusable & Will Ruin Bay)
- ML17037B983 + (Expression of Appreciation for July 5, 1972 Letter Outlining Steps Taken to Make Material Available to Public at Oswego City Library)
- ML20133E871 + (Expurgated Testimony of D Williams Re Undercover Drug Investigation at Facility.Related Correspondence)
- ML20259F002 + (Ext Door Assembly for Personnel Lock)
- ML20259D587 + (Ext Door Assembly for Personnel Lock. Rev Date Illegible)
- TSTF-254 + (Extend Frequency of Accumulated Water Checks for DG Fuel Oil)
- ML20210M930 + (Extend Invitation to Attend Emergency Exercise on 971013-16. Exercise Will Entail Enactment of Full Range of Emergency Responses Required by Prevailing Accident Scenario Prepared & Administered by Council for Nuclear Safety)
- TSTF-454 + (Extend PCIV Completion Times - NEDC-33046)
- ML17068A253 + (Extend Timeframe for the 2017 Selective Leaching of Aluminum Bronze AMP Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review)
- TSTF-099 + (Extend the Completion Time for Fq(W) Not within Limits from 2 Hours to 4 Hours)
- TSTF-030 + (Extend the Completion Time for Inoperable Isolation Valve to a Closed System to 72 Hours)
- TSTF-457 + (Extend the Frequency for Testing the Recirculation Pump Discharge Valves)
- TSTF-102 + (Extend the Periodic Verification of Inoperable MSIV and Mfiv Closure to 31 Days)
- TSTF-282 + (Extend the Time Allowed to Perform the BOC Precision RCS Flow Rate Measurement)
- ML20304A407 + (Extended Abstract Ensuring National Compatibility Across Multiple Regulatory Authorities CN279-202)
- ML24080A013 + (Extended Abstract Submitted Iwass Esrel 2024 Exploring Human Factors Considerations of Remote and Automated Operations for the Nuclear Domain)
- ML20304A435 + (Extended Abstract the Application of the Graded Approach to the Regulation of Radioactive Sources in the United States CN279-203)
- ML19332A324 + (Extended Analysis of Data from 1/5-Scale Mark I BWR Pressure Suppression Experiment)
- ML20076D016 + (Extended Blowdown Test,Evaluation of Suppression Pool Temp Measurements)
- ML20071B187 + (Extended Burnup Calculations for Operating Reactor Reload Reviews)
- ML20141C235 + (Extended Burnup Evaluation)
- ML20129D294 + (Extended Cycle 8 Rept)
- ENS 47092 + (Extended Emergency Siren Activation During Testing)
- ML20214S559 + (Extended Fatigue Life Evaluation Methods for Aged LWR Components, Second Progress Rept for Dec 1986 - Jan 1987)
- ML20214S572 + (Extended Fatigue Life Evaluation Methods for Aged LWR Components, Progress Rept for Oct-Nov 1986)
- ML20215N495 + (Extended Fuel Storage in Existing Onsite Humboldt Bay, Unit 3,Storage Pool)
- Information Notice 1990-09, Extended Interim Storage of Low-Level Radioactive Waste by Fuel Cycle and Materials Licensees + (Extended Interim Storage of Low-Level Radioactive Waste by Fuel Cycle and Materials Licensees)
- ML040700512 + (Extended Inverter Allowed Outage Time, Revised Required Action Completion Time for Proposed Risk-Informed Technical Specifications Change)
- ML20210B803 + (Extended Life Aluminide Fuel Final Rept)
- ML17053A758 + (Extended Load Line Limit Analysis,License Amend Submittal (Cycle 6))
- ML20235C487 + (Extended Operating Domain & Equipment Out-of-Svc for Quad Cities Nuclear Power Station Units 1 & 2. B Wolfe Affidavit Also Encl)
- ML20154A413 + (Extended Operating Domain/Equipment Out-of-Svc Analysis for Dresden Units 2 & 3)
- ML23058A003 + (Extended Passive Cooling LTR Completeness Review NRC 898 (3))