Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18275A276 + (Enclosure 3 - Affidavit for Enclosure 1)
- ML20302A250 + (Enclosure 3 - Affidavit for Enclosure 1)
- ML21028A474 + (Enclosure 3 - Affidavit for Enclosure 1 and Associated Electronic Media)
- ML20252A202 + (Enclosure 3 - Affidavit for Michelle P. Catts)
- ML21243A270 + (Enclosure 3 - Affidavit of James Costedio)
- ML23145A027 + (Enclosure 3 - Affidavit of Justin R. Hawkins)
- ML23142A008 + (Enclosure 3 - Affidavit of Justin R. Hawkins)
- ML23114A030 + (Enclosure 3 - Affidavit of Justin R. Hawkins)
- ML23146A185 + (Enclosure 3 - Affidavit of Kent E. Halac)
- ML21081A027 + (Enclosure 3 - Affidavit of Zachary S. Harper)
- ML17268A346 + (Enclosure 3 - Agency Information Security Continuous Monitoring (Iscm) Strategy)
- ML24290A028 + (Enclosure 3 - Amendment 22 Safety Evaluation Report)
- ML22316A008 + (Enclosure 3 - Amendment No. 3 to Trust Agreement for License Number SNM-1107 (Non-Proprietary))
- ML14107A056 + (Enclosure 3 - April 2 2014 ROP FAQ Log)
- ML13305A122 + (Enclosure 3 - Areva Document No. 32-9212003-000, Lst Considering RCS Piping and RVCH Limit for B&W Plant Designs, September 2012)
- BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395) + (Enclosure 3 - Areva Operability Assessment. (CR 2014-7395))
- ML18149A301 + (Enclosure 3 - Assessment of ERO Minimum Staff and Full-Augmented Staff Positions Removed)
- ML23045A179 + (Enclosure 3 - Attachment to License Amendment No. 148 for COL No. NPF-91)
- ML052370049 + (Enclosure 3 - Attendee List to 8/21/2005 - Ltr to F. Killar, NEI Re Public Meeting Summary)
- ML22341A216 + (Enclosure 3 - BWXT Amendment 44 SER)
- ML22278A339 + (Enclosure 3 - BWXT Nuclear Operations Group, Inc.-Lynchburg Presentation Slides (9/22/22) - Pre-decisional Enforcement Conference)
- ML051260134 + (Enclosure 3 - Beaver Valley Power Station - Units 1 & 2, Annual Radiological Environmental Operating Report Calendar Year - 2004)
- ML073470274 + (Enclosure 3 - Bibliography)
- RIS 2008-12, Enclosure 3 - Bibliography + (Enclosure 3 - Bibliography)
- RIS 2008-12, Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste + (Enclosure 3 - Bibliography)
- RIS 2008-12, Considerations for Extended Interim Storage of Low-Level Radioactive Waste By Fuel Cycle and Materials Licensees + (Enclosure 3 - Bibliography)
- ML22173A177 + (Enclosure 3 - Big Rock Point Amendment to Indemnity Agreement No. B-22 - Amendment No. 20)
- ML22356A316 + (Enclosure 3 - CR3MP Transport Package Safety Analysis Report, Revision 3)
- ML14070A343 + (Enclosure 3 - Calculation 1200895.308, Rev. 0, Hot Leg Drain Nozzle Limit Load Analyses for Flawed Nozzle-to-Hot Leg Weld)
- ML21090A188 + (Enclosure 3 - Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02)
- ML21252A135 + (Enclosure 3 - Centrus DCS License ACP Amend 14 Public)
- ML24199A240 + (Enclosure 3 - Certificate of Compliance No. 1032, Amendment 7, Appendix B)
- ML25231A285 + (Enclosure 3 - Certificate of Compliance No. 9279, Revision 12)
- ML23163A214 + (Enclosure 3 - Changed Pages for NEDO-33869, Revision 11)
- ML18053A182 + (Enclosure 3 - Clinton Power Station, Unit 1 - Evaluation of Proposed Changes)
- ML20354A003 + (Enclosure 3 - Comments and Proprietary Markings on the Draft Safety Evaluation for Westinghouse Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code PARAGON2 (Non-Proprietary))
- ML18142A237 + (Enclosure 3 - Comparison of Boiling Water Reactor and Pressurized Water Reactor Experience with Cracking of Austenitic Stainless Steel)
- ML18106A757 + (Enclosure 3 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.c (Index Number 808))
- ML18087A379 + (Enclosure 3 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.a (Index Number 806))
- ML19248C683 + (Enclosure 3 - Computational Tool to Compute Site Specific Input Parameters for the Alternative FHA Model)
- ML18087A415 + (Enclosure 3 - Consolidated November 23, 2016 RAI Responses for Organization (RAIs 1-2))
- ML15246A049 + (Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation)
- NL-15-1392, Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation + (Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation)
- ML22153A249 + (Enclosure 3 - Current Dco Organizational Chart and Staffing)
- ML23179A236 + (Enclosure 3 - Dfm Qualification Program Update Communication Plan)
- ML17097A560 + (Enclosure 3 - Document A22-1690-001, Rev. 0, Decommissioning Cost Analysis for the Callaway Energy Center, Decommissioning Alternatives, Section 2, Pages 1 of 12 - Section 3 Page 13 of 30)
- ML25163A102 + (Enclosure 3 - Dominion Energy 5-20-25 Meeting Summary)
- ML25163A116 + (Enclosure 3 - Dominion Energy 5-23-25 Meeting Summary)
- ML111030188 + (Enclosure 3 - Dose Estimates)