Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323H398 + (Econometric Study of Electricity Demand by Mfg Industries)
- ML20213H173 + (Economic Benefits of Nuclear Phase Out)
- ML19276F780 + (Economic Consequences of Accidental Releases from Fuel Fabrication & Radioisotope Processing Plants)
- ML103620080 + (Economic Consequences of Rad/Nuc Attack: Cleanup Standards Significantly Affect Cost)
- ML20029A739 + (Economic Impact Study of Proposed KPL/KG-E Merger)
- ML20012F224 + (Economic Risk of Contamination Cleanup Costs Resulting from Large Nonreactor Nuclear Material Licensee Operations)
- ML20092E511 + (Economic Risks of Nuclear Power Reactor Accidents)
- ML19321A476 + (Ecopac Solidification Sys Process Control Program, Revision 4)
- ML19309E974 + (Ecopac Sys Procedure for Onsite Solification of Low Level Radioactive Waste at Sequoyah Nuclear Plant & Addl Info Re Process Control Program)
- ML070530691 + (Ecosystem Vulnerability and Climate Change: Aquatic Ecosystems)
- ML18222A373 + (Ecs Mid-Atlantic, LLC - NRC Form 591M Part 1, Inspection Report 03037532/2018001)
- ML18194A846 + (Ecs Mid-Atlantic, LLC, Amendment No. 11, Mail Control No. 608610)
- ML18190A341 + (Ecs Mid-Atlantic, LLC; Cover Letter Dtd July 3, 2018, for License Amendment No. 8; Control No. 608462)
- ML18190A386 + (Ecs Mid-Atlantic, LLC; License Amendment No. 8; Control No. 608462)
- ML18194A842 + (Ecs Mid-Atlantic, LLC; License Amendment, Mail Control No. 608610)
- ML20261M626 + (Ecst Na Cooler a Nak Outlet Lines 4 Inches HCBD-81EPD- 0026 & 4 Inches HCBD-81EPD-0027 Fabrication Iso)
- ML20259D161 + (Ecw Blowdown Isolation Valve Logic Diagram System:R-28. Sheet 2)
- ML20260E536 + (Ecw Blowdown Isolation Valves Logic Diagram System:Ew. Actual Drawing NUMBER:5R-28-9-Z-42083 1)
- ML20259C481 + (Ecw ESF Monitoring Train B Logic Diagram System:Z-26. Sheet 1)
- ML20259C661 + (Ecw ESF Monitoring Train a Logic Diagram System:Z-26. Sheet 1)
- ML20260C880 + (Ecw ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41860 1)
- ML20260C763 + (Ecw ESF Status Monitoring Train B Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41836 1)
- ML20260C903 + (Ecw ESF Status Monitoring Train C Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41866 1)
- ML20260D026 + (Ecw ESF Status Monitoring Train C Logic:Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41887 1)
- ML20261L328 + (Ecw ESF Status Monitoring Train a Logic Diagram System: Sm)
- ML20261L800 + (Ecw ESF Status Monitoring Train a Logic Diagram System:Sm)
- ML20260C565 + (Ecw ESF Status Monitoring Train a Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41800 1)
- ML20260C742 + (Ecw ESF Status Monitoring Train a Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41830 1)
- ML20260E542 + (Ecw Essential Chiller Condenser Vlvs Logic Diagram System: Ew. Actual Drawing NUMBER:5R-28-9-Z-42084 1)
- ML20260D914 + (Ecw Intake Structure Sump Pumps Logic Diagram System Dr. Actual Drawing NUMBER:9P-20-9-Z-40380 1)
- ML20260C443 + (Ecw Pump Cub HVAC Vent Fans Intake EXH Dampers Logic Diagram System:Hz. Actual Drawing NUMBER:5V-15-9-Z-41675 1)
- ML20260C435 + (Ecw Pump Cub HVAC Ventilation Fan Logic Diagram System:Hz. Actual Drawing NUMBER:5V-15-9-Z-41674 1)
- ML20260E526 + (Ecw Pump Discharge Valves Logic Diagram System:Ew. No Rev Date. Actual Drawing NUMBER:5R-28-9-Z-42081 1)
- ML20265D235 + (Ecw Pump Discharge Valves Logic Diagram System:Ew)
- ML20261K342 + (Ecw Pump Discharge Valves Logic Diagram System:Ew)
- ML20260E511 + (Ecw Screen Wash Booster Pumps Logic Diagram System:Ew. Actual Drawing NUMBER:5R-28-9-Z-42078 1)
- ML20261K331 + (Ecw Screen Wash Booster Pumps Logic Diagram System:Ew)
- ML20259D191 + (Ecw Screen Wash Pumps Logic Diagram System:R-28. Sheet 2)
- ML20260E532 + (Ecw Screen Wash Valves Logic Diagram System:Ew. Actual Drawing NUMBER:5R-28-9-Z-42082 1)
- ML20259D168 + (Ecw Screen Wash Valves Logic Diagram System:R-28. Sheet 1)
- ML20260B301 + (Ecw Self Cleaning Strainer Logic Diagram System:Ew)
- ML20260E520 + (Ecw Self Cleaning Strainer Logic Diagram System:Ew. Actual Drawing NUMBER:5R-28-9-Z-42080 1)
- ML20259D186 + (Ecw Traveling Water Screen Logic Diagram System:R-28. Sheet 3)
- ML20260E515 + (Ecw Traveling Water Screens Logic Diagram System:Ew. Actual Drawing NUMBER:5R-28-9-Z-42079 1)
- ML071100166 + (Ed Bailey Ltr Draft Environmental Assessment Related to the License Termination Plan for the Rancho Seco Nuclear Generating Station)
- ML26023A064 + (Ed Hudson - Pump)
- ML103120712 + (Edcr 52321 Draft Scope and Intent, Unit Difference and Technical Evaluation, Enclosure 2, Attachment 1)
- ML20087M075 + (Eddleman & Joint Intervenors Interrogatories to NRC Staff (Third Set).Related Correspondence)
- ML20094N151 + (Eddleman Contentions on Emergency Plan Brochure, Safety Info for Shearon Harris Nuclear Power Plant. Certificate of Svc Encl)
- ML20087M079 + (Eddleman General Interrogatories & Interrogatories on Contentions 9,11,41,45,116 & 132(c)(2) to Applicant (Eighth Set).Certificate of Svc Encl.Related Correspondence)
- ML18256A340 + (Eddy County - Interested Party Petition - for Holtec)