Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20224A185 + (EDO Package - Holtec International Umax CoC 1040 Amendment No. 4)
- ML20206D580 + (EDO Principal Correspondence Control 0003904 Re J Rhodes to Chairman Zech Requesting Dates & Topics of Discussion of Meetings & Telcon Between Licensee Executives & NRC About Util Restart & Imposition of Fines)
- ML061800266 + (EDO Principal Correspondence Control, Braidwood Tritium Release 12/6/05 E-mail from Klementowicz to Wetzle, Green Ticket on Tritium Info Release; Question on Tritium Portions Outside the Scope of the Request)
- ML20135H531 + (EDO Procedures Manual)
- ML20129J655 + (EDO Procedures Manual)
- ML20125D264 + (EDO Procedures Manual)
- ML20203P661 + (EDO Procedures Manual)
- ML20115A904 + (EDO Procedures Manual)
- ML20088A964 + (EDO Procedures Manual)
- ML20081A057 + (EDO Procedures Manual)
- ML20093K347 + (EDO Procedures Manual)
- ML20076M864 + (EDO Procedures Manual)
- ML20107J569 + (EDO Procedures Manual)
- ML20091L832 + (EDO Procedures Manual.Revision 2,Supplement 3)
- ML20101H769 + (EDO Procedures Manual.Supplement 4,Revision 2)
- ML19219A068 + (EDO Released Set Part 1_NRC-2017-000292 (Interim 2))
- ML19219A069 + (EDO Released Set Part 2_NRC-2017-000292 (Interim 2))
- ML19066A163 + (EDO Response to ACRS Letter of September 26, 2018 on Chapters 7 and 8 of the NRC Staffs Safety Evaluation Report with Open Items Related to the Certification of the Nuscale Small Modular Reactor)
- ML16246A270 + (EDO Response to ACRS Report Dated December 12,1990 on the Preliminary Design Approval for the RESAR SP/90)
- ML19073A080 + (EDO Response to Justin Cochran, Ph.D)
- ML20070H995 + (EDS-NUTECH Interface Control Instructions, Revision 0)
- ML20082D999 + (EE580 Field Verification Final Rept Ref NRC Allegation RV-87-A-047)
- ML20082D976 + (EE580 Field Verification Suppl to Final Rept Ref NRC Allegation RV-87-A-047 for Palo Verde Nuclear Generating Station,Oct 1988)
- ML101390102 + (EEB-TI-28, Branch Technical Instruction, Setpoint Calculations)
- NRC-96-0029, EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Util Determined That Sys Design Such That Long Term Emergency Equipment Component Cooling Could Not Be Assured for All DBA Scenarios + (EECW Being in Unanalyzed Condition & Subsequent TS Required Shutdown.Util Determined That Sys Design Such That Long Term Emergency Equipment Component Cooling Could Not Be Assured for All DBA Scenarios)
- ML20084U252 + (EFIC - Main Steam Instrumentation Loop String Accuracy & Setpoints)
- ML20263T512 + (EFIC Logic 1 Steam Generator a Level Input)
- ML20263J110 + (EFIC Logic 1 Steam Generator a Level Input)
- ML20263G271 + (EFIC Logic 1 Steam Generator a Level Input)
- ML20259C048 + (EFIC Logic 1 Steam Generator a Level Input)
- ML20263T501 + (EFIC Logic 12 Steam Generator Control)
- ML20263J126 + (EFIC Logic 12 Steam Generator Control)
- ML20263G284 + (EFIC Logic 12 Steam Generator Control)
- ML20261C131 + (EFIC Logic 12 Steam Generator Control)
- ML20259C072 + (EFIC Logic 12 Steam Generator Control)
- ML20263T509 + (EFIC Logic 2 Steam Generator B Level Input)
- ML20263J114 + (EFIC Logic 2 Steam Generator B Level Input)
- ML20263G269 + (EFIC Logic 2 Steam Generator B Level Input)
- ML20259C050 + (EFIC Logic 2 Steam Generator B Level Input)
- ML20263T507 + (EFIC Logic 3 Steam Generator Pressure)
- ML20263J118 + (EFIC Logic 3 Steam Generator Pressure)
- ML20263G266 + (EFIC Logic 3 Steam Generator Pressure)
- ML20259C053 + (EFIC Logic 3 Steam Generator Pressure)
- ML20263T514 + (EFIC Logic 5 Initiate Logic)
- ML20263J129 + (EFIC Logic 5 Initiate Logic)
- ML20263G280 + (EFIC Logic 5 Initiate Logic)
- ML20259C061 + (EFIC Logic 5 Initiate Logic)
- ML20263J124 + (EFIC Logic 6 Vector Logic)
- ML20263G262 + (EFIC Logic 6 Vector Logic)
- ML20259C063 + (EFIC Logic 6 Vector Logic)