Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-94-0020, Detroit Edison 1993 Annual Rept + (Detroit Edison 1993 Annual Rept)
- NRC-95-0036, Detroit Edison 1994 Annual Rept + (Detroit Edison 1994 Annual Rept)
- NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with + (Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with)
- ML18228A632 + (Detroit Edison Co Refund Notification Letter)
- ML19225A515 + (Detroit Edison Objections to Citizens for Employment & Energy Interrogatories & Requests for Production of Documents Served on 790525.Certificate of Svc Encl)
- ML19241B677 + (Detroit Edison Responses to Intervenor Citizens for Employment & Energy 790525 Interrogatories)
- NRC-02-0048, Detroit Edison Submittal of Fermi 2 Physical Security Plan (PSP) Revision 40 + (Detroit Edison Submittal of Fermi 2 Physical Security Plan (PSP) Revision 40)
- ML033090459 + (Detroit Edison Tpept EP-29005, Rev 3, Hospital Support Request Form)
- NRC-07-0017, Detroit Edison'S 90-Day Response to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigations Systems or Cause Plant Transients. + (Detroit Edison'S 90-Day Response to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigations Systems or Cause Plant Transients.)
- ML013110179 + (Detroit Edison, Fermi 2, Revision 12 to EP-220, Personnel Monitoring and Radiological Emergency Teams)
- NRC-12-0046, Detroit Edisons 120-day Response to March 12, 2012 Information Request Regarding Seismic Walkdowns + (Detroit Edisons 120-day Response to March 12, 2012 Information Request Regarding Seismic Walkdowns)
- NRC-12-0028, Detroit Edisons 30 Day Response to March 12, 2012 Information Request + (Detroit Edisons 30 Day Response to March 12, 2012 Information Request)
- NRC-12-0032, Detroit Edisons 60 Day Response to March 12, 2012 Information Request + (Detroit Edisons 60 Day Response to March 12, 2012 Information Request)
- ML071300392 + (Detroit Edisons 90-Day Response to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigations Systems or Cause Plant Transients)
- NRC-12-0036, Detroit Edisons 90-day Response to March 12, 2012, Response to Information Request Regarding Flooding Evaluations and Walkdowns + (Detroit Edisons 90-day Response to March 12, 2012, Response to Information Request Regarding Flooding Evaluations and Walkdowns)
- NRC-12-0041, Detroit Edisons 90-day Response to March 12, 2012 Information Request Regarding Seismic Hazard Evaluations + (Detroit Edisons 90-day Response to March 12, 2012 Information Request Regarding Seismic Hazard Evaluations)
- NRC-12-0023, Detroit Edisons Answer to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Detroit Edisons Answer to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- NRC-12-0021, Detroit Edisons Answer to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (Detroit Edisons Answer to March 12, 2012 Commission Order Modifying License with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050))
- NRC-12-0022, Detroit Edisons Answer to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049) + (Detroit Edisons Answer to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049))
- NRC-12-0063, Detroit Edisons Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Detroit Edisons Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- NRC-12-0061, Detroit Edisons Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049) + (Detroit Edisons Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events (Order Number EA-12-049))
- NRC-12-0062, Detroit Edisons Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (Detroit Edisons Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050))
- NRC-12-0039, Detroit Edisons Interim Response to March 12, 2012 Information Request Regarding Emergency Preparedness Communications and Staffing + (Detroit Edisons Interim Response to March 12, 2012 Information Request Regarding Emergency Preparedness Communications and Staffing)
- NRC-12-0076, Detroit Edisons Response to March 12, 2012 Information Request Regarding Flood Protection Walkdowns + (Detroit Edisons Response to March 12, 2012 Information Request Regarding Flood Protection Walkdowns)
- NRC-02-0012, Detroit Edisons Submittal of Inservice Inspection Summary Report for Fermi 2 + (Detroit Edisons Submittal of Inservice Inspection Summary Report for Fermi 2)
- ML21243A014 + (Deuterium Final Rule)
- ML20150E084 + (Dev of Advanced Code for Thermal Hydraulics of Reactors (Thor) Covering Highlights for Oct 1978:quench Front Propagation Velocity,Instabilities in Multizone Heated Channel Module Analyzed,Sys Dev & Numerical Tests Continued)
- ML20150E097 + (Dev of Advanced Code for Thermal Hydraulics of Reactors (Thor) Covering Monthly Highlights for Aug 1978:debugging of Component Interactions W/In Thor Sys Continued,Small/ Large Core Sys Assembly & Thor Documentation Completed)
- ML20071Q139 + (Developing Adequate Hydrothermal Monitoring Program, Presented at AIF Topical Conference on Water Quality Considerations for Siting & Operating Nuclear Power Plants on 721001-04 in Washington,Dc)
- ML21244A448 + (Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Casual Alpha Factors Report INL/EXT-21-43723)
- ML21309A655 + (Developing Good Habits for Public Protection - IAEA Fukushima Conference Session)
- ML21309A557 + (Developing Good Habits for Public Protection IAEA Fukushima)
- PMNS20220217, Developing Options for a Regulatory Framework for Commercial Fusion Energy Systems + (Developing Options for a Regulatory Framework for Commercial Fusion Energy Systems)
- ML19308C086 + (Developing Regulatory Program 1954-1956, Draft)
- ML22081A057 + (Developing a Regulatory Framework for Commercial Fusion Energy Systems - NRC Public Meeting March 23, 2022)
- ML21088A294 + (Developing a Regulatory Framework for Fusion Energy Systems - Fusion Public Meeting Slides-03302021)
- ML19255J933 + (Developing a Working Relationship with Federally Recognized Indian Tribes)
- ML20102A745 + (Developing and Assessing Accident Management Plans for Nuclear Power Plants.Evaluation of a Prototype Process)
- ML20105D051 + (Developing and Assessing Accident Management Plans for Nuclear Power Plants.Development Process and Criteria)
- ML19323C482 + (Development & Analysis of Vent-Filtered Containment Conceptual Designs)
- ML20045A250 + (Development & Application of Degradation Modeling to Define Maint Practices)
- ML20010E209 + (Development & Evaluation of a Physical Protection Plan for 10 CFR 73.45 Capabilities (C),(D), & (F).Performance Capability (F))
- ML20010E310 + (Development & Evaluation of a Physical Protection Plan for 10 CFR 73.45 Capabilities (C),(D), & (F).Performance Capability (D))
- ML20038A001 + (Development & Evaluation of a Physical Protection Plan for 10 CFR 73.45 Capabilities (C),(D), & (F).Performance Capability (C))
- ML20058J761 + (Development & Implementation of Measures to Exclude Operation of Reactors of VVER-1000 Type W/Positive Coolant Temp Coefficient & Improvement of Safety Std Requirements)
- ML20150B888 + (Development & Verification of Fire Tests for Cable Sys & Sys Components, Quarterly Rept 4, Mar-May 1978)
- ML19317H196 + (Development & Verification of Fire Tests for Cable Sys & Sys Components,Quarterly Repts 2 & 3 Sept 1977-Feb 1978)
- ML20155F105 + (Development Assessment of RELAP5/MOD3.1 with SEPARATE-EFFECT and Integral Test Experiments: Model Changes and Options)
- ML20045E295 + (Development Plan for Program Architecture Support Sys (Pass)/Program Architecture Database (Padb) Sys Design Version 3.0)
- ML20070B144 + (Development and Application of Degradation Modeling to Define Maintenance Practices)
- ML20101D837 + (Development and Application of Econometric Demand and Supply Models for Selected Chesapeake Bay Seafood Products)