NRC-02-0048, Detroit Edison Submittal of Fermi 2 Physical Security Plan (PSP) Revision 40
| ML021700069 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/07/2002 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-02-0048 | |
| Download: ML021700069 (3) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison SAFEGUARDS INFORMATION June 7, 2002 NRC-02-0048 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001
Reference:
Subject:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 Submittal of Fermi 2 Physical Security Plan (PSP), Revision 40 The purpose of this letter is to submit the Fermi 2 Physical Security Plan (PSP),
Revision 40, in accordance with 10CFR50.54(p)(2).
Chapters 1, 2, 4, Figure 1-1, the Table of Contents, and the List of Tables/Figures are being submitted. A summary of the changes made in the PSP Revision 40 is also provided. Additionally, changes to the text are highlighted (shaded). Deleted text is not identified with markings. The changes made under this revision do not decrease the overall effectiveness of the PSP.
If there are questions regarding this submittal, please contact Mr. Joseph H. Korte, Manager-Nuclear Security at (734) 586-1095.
Sinc Norman K. Peterson Manager - Nuclear Licensing Enclosures cc:
J. R. Creed T. J. Kim NRC Resident Office Regional Administrator, Region III USNRC Document Control Desk (2 copies w/Enclosures)
(w/o Enclosures)
(w/o Enclosures)
(w/o Enclosures)
(3 copies w/original)
When separated from enclosures, handle this page as decontrolled SAFEGUARDS INFORMATION A DTE Energy Company
-40 I'll ý ý A
SAFEGUARDS INFORMATION Fermi 2 Physical Security Plan Revision 40, Summary Page 1 The revised text within the Physical Security Plan has been shaded.' Deleted text is not identified by markings.
Chapter 1, Revision 40:
- 1.
Revised position description for Manager - Nuclear Security in section 1.2.1, page 1-3.
- 2.
Changed title of General Supervisor, Security Operations to General Supervisor, Nuclear Security Operations and revised position description in section 1.2.2, page 1-3.
- 3.
Changed title of Supervisor, Access Authorization to Supervisor, Nuclear Security Staff and revised position description in section 1.2.3, page 1-4.
- 4.
Deleted Security Supervisor, Operations Support in section 1.2.4, page 1-4.
- 5.
Revised section numbering for Security Shift Supervisor and Response Force Leader in sections 1.2.4 and 1.2.5 page 1-4.
Chapter 2, Revision 40:
- 1.
Changed General Supervisor, Security Operations to General Supervisor, Nuclear Security Operations in sections 2.5.2 page 2-16, 2.5.3 pages 2-16 & 2-17, and sectiont2.6.2, page 2-18 and 2.7.1, page 2-19.
Chapter 4, Revision 40:
1 Changed General Supervisor, Security Operations to General Supervisor, Nuclear Security Operations in sections 4.11.1 page 4-12, and 4.11.2, page 4-13.
- 2.
Changed GSSO to GSNSO in section 4.11.2, page 4-12.
SAFEGUARDS INFORMATION When separated from enclosures, handle this page as decontrolled
SAFEGUARDS INFORMATION Fermi 2 Physical Security Plan Revision 40, Summary Page 2 Figure 1-1, Revision 40:
- 1.
Changed General Supervisor, Security Operations to General Supervisor, Nuclear Security Operations.
- 2.
Changed Security Supervisor, Access Authorization to Supervisor, Nuclear Security staff.
- 3.
Deleted Security Supervisor, Operations Support.
- 4.
Added Principal Planning Analyst, Nuclear Security.
When separated from enclosures, handle this page as decontrolled SAFEGUARDS INFORMATION