Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP 12-0085, Cycle 19 Startup Report + (Cycle 19 Startup Report)
- BSEP 09-0066, Cycle 19 Startup Report + (Cycle 19 Startup Report)
- ML20077R993 + (Cycle 19 Startup Rept)
- RA21-043, Cycle 19 Startup Test Report Summary + (Cycle 19 Startup Test Report Summary)
- WBL-25-020, Cycle 19 Steam Generator Tube Inspection Report + (Cycle 19 Steam Generator Tube Inspection Report)
- RA20-014, Cycle 19 and Cycle 18 Core Operating Limits Reports + (Cycle 19 and Cycle 18 Core Operating Limits Reports)
- L-16-253, Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report + (Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report)
- BYRON 2014-0002, Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Report for Measurement Uncertainty Recapture (MUR) Power Uprate + (Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Report for Measurement Uncertainty Recapture (MUR) Power Uprate)
- ML12104A268 + (Cycle 19, Core Operating Limits Report)
- L-15-304, Cycle 19, Core Operating Limits Report + (Cycle 19, Core Operating Limits Report)
- ML12100A086 + (Cycle 19, Core Operating Limits Report, March 2012)
- ULNRC-05831, Cycle 19, Facility Operating License NPF-30, Core Operating Limits Report + (Cycle 19, Facility Operating License NPF-30, Core Operating Limits Report)
- ML080710432 + (Cycle 19, Revision 0 Core Operating Limits Report)
- ML033010450 + (Cycle 19, Revision 1 to Core Operating Limits Report)
- ML070940684 + (Cycle 19, Revision 30 Core Operating Limits Report (COLR))
- ML19261B359 + (Cycle 1:Mid-Cycle Startup Rept)
- ML20032C778 + (Cycle 2 - Reload Rept. Tech Specs Encl)
- ML20069K367 + (Cycle 2 Core Performance Rept)
- ML19350D389 + (Cycle 2 Core Performance Rept)
- ML20112H497 + (Cycle 2 Plant Transient Analysis)
- ML17146A421 + (Cycle 2 Plant Transient Analysis)
- ML19317D651 + (Cycle 2 Power Distribution Comparison Rept)
- ML20082B745 + (Cycle 2 Radial Peaking Limit Rept)
- ML20072P811 + (Cycle 2 Refueling Outage Fuel Exam Results)
- ML17146A419 + (Cycle 2 Reload Analysis Design & Safety Analyses)
- ML20148T229 + (Cycle 2 Reload Analysis Rept)
- ML20008E686 + (Cycle 2 Reload Analysis Rept, Remaining sections.Marked-up Tech Specs Encl)
- ML19284A448 + (Cycle 2 Reload Rept)
- ML19308B519 + (Cycle 2 Reload Rept)
- ML19308B546 + (Cycle 2 Reload Rept)
- ML19319A780 + (Cycle 2 Reload Rept)
- ML19210A518 + (Cycle 2 Reload Rept (Based on Cycle 1 Burnup of 440 Plus or Minus 10 Effective Full Power Days))
- ML19322C157 + (Cycle 2 Reload Rept, Revision 1)
- ML19326C004 + (Cycle 2 Reload Rept. Nonproprietary Version)
- W3P87-0969, Cycle 2 Reload Startup Test Rept for Period Ending 870301 + (Cycle 2 Reload Startup Test Rept for Period Ending 870301)
- ML17146A417 + (Cycle 2 Reload Summary Rept)
- ML20090M615 + (Cycle 2 Scram Reactivity Considerations,Analysis & Mods)
- ML20062L928 + (Cycle 2 Startup Physics Test Rept)
- ML20248A777 + (Cycle 2 Startup Physics Test Rept)
- ML19320A770 + (Cycle 2 Startup Physics Test Rept)
- ML20150E058 + (Cycle 2 Startup Rept)
- ML20024G814 + (Cycle 2 Startup Rept)
- ML19250B592 + (Cycle 2 Startup Rept)
- ML19350A429 + (Cycle 2 Startup Rept for Facility)
- ML20032C614 + (Cycle 2 Startup Rept to NRC for Period Ending 810819)
- ML20215C641 + (Cycle 2 Startup Test Rept)
- ELV-00318, Cycle 2 Startup Test Rept + (Cycle 2 Startup Test Rept)
- ML20004E504 + (Cycle 2 Startup Test Rept)
- ML18092A210 + (Cycle 2 Startup Test Rept)
- ML18082A295 + (Cycle 2 Startup Test Rept)
- ML20091P579 + (Cycle 2 Startup Test Rept for Seabrook Station,Unit 1. W/)
- PLA-2771, Cycle 2 Startup Test Summary + (Cycle 2 Startup Test Summary)
- EPID:L-2019-LRO-0068 + (Cycle 2 Steam Generator Tube Inspection Report)
- WBL-19-041, Cycle 2 Steam Generator Tube Inspection Report + (Cycle 2 Steam Generator Tube Inspection Report)