Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262A999 + (Cooling Tower Controls EF-169 & EF-170)
- ML20263S577 + (Cooling Tower East Cable Tray Layout - Plan)
- ML20153F788 + (Cooling Tower Effects on Area Fog Events)
- ML20264E526 + (Cooling Tower Electrical Room HVAC Supply Fan)
- ML18187A030 + (Cooling Tower Retrofit Is Feasible and Cost-Effective)
- 05000331/FIN-2009002-02 + (Cooling Tower Riser Break Leads to Manual Reactor Scram)
- ML20263S456 + (Cooling Tower Ventilation and Drainage System)
- ML20263S581 + (Cooling Tower West Cable Tray Layout - Plan)
- ML082700545 + (Cooling Towers Letter from Vermont DPS)
- ML19344D891 + (Cooling Towers as Obstacles in Bird Migrations)
- ML20266A575 + (Cooling Water Aux Bldg Return A-6645)
- ML20266A523 + (Cooling Water Aux Bldg Return A-6647)
- ML20266A578 + (Cooling Water Aux Bldg Return A-6652)
- ML20266A566 + (Cooling Water Aux Bldg Supply A-6646)
- ML20070J503 + (Cooling Water Chlorination:The Kinetics of Chlorine,Bromine and Ammonia Reaction in Sea Water)
- ML19093B109 + (Cooling Water Discharge Temperature Change Rate)
- ML20262F590 + (Cooling Water Flow Diagram Industrial Cooler System)
- 05000305/LER-1983-027-03, Cooling Water HX 1A Removed from Svc to Repair Leak.Caused by Sand Erosion.Line Patch Welded & Tested.Hx Returned to Svc + (Cooling Water HX 1A Removed from Svc to Repair Leak.Caused by Sand Erosion.Line Patch Welded & Tested.Hx Returned to Svc)
- ML19270G546 + (Cooling Water Intake & Blowdown Discharge Study)
- ML20085M487 + (Cooling Water Intake Impact Rept)
- ML14091A218 + (Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286))
- ML14087A164 + (Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286))
- ML20079N380 + (Cooling Water Intake Structure 316(b) Demonstration)
- ML20085M598 + (Cooling Water Intake Studies,Nov 1980)
- ENS 48886 + (Cooling Water Makeup Pump Failed to Start During a Surveillance Test)
- ML20266A570 + (Cooling Water Piping)
- ML20266A585 + (Cooling Water Piping A-7039)
- ML20009E063 + (Cooling of Core Debris and the Impact on Containment Pressure)
- ML19220C585 + (Cooling of TMI Core Debris)
- ML041910082 + (Cooling-Water System Technology Study Request for Information - Winter Flounder Mass-Balance Model)
- ML041910513 + (Cooling-water System Technology Study, Response to DEP Comments)
- ML20207E444 + (Coomonwealth of Ma Atty General Jm Shannon Motion to File Proposed Findings of Fact & Rulings of Law on Sheltering Contentions Late.* Motion Filed Late Due to Electronic Malfunction of Wang Sys in Atty General Ofc)
- ML15027A409 + (Cooper Nuclear Station - Cancellation of NRC Examination Report 05000298/2015301)
- ML17017A485 + (Cooper Nuclear Station - NRC Emergency Preparedness Annual Inspection Report 05000298/2016501 (Cover Letter Only))
- IR 05000298/2016003 + (Cooper Nuclear Station - NRC Integrated Inspection Report 05000298/201600003)
- IR 05000298/2016000 + (Cooper Nuclear Station - NRC Integrated Inspection Report 05000298/201600003)
- ML112061836 + (Cooper Nuclear Station - NRC Physical Security Inspection Report 05000298-11-402)
- ENS 52279 + (Cooper Nuclear Station Loss of Tone Alert Radios)
- ENS 52262 + (Cooper Nuclear Station Loss of Tone Alert Radios)
- ML020280397 + (Cooper/Nebraska Public Power Company Meeting to Discuss the Performance Issues, Underlying Causes, and Corrective Actions for Two White Inspection Findings)
- ML091390040 + (Cooperating Agency Participation for the Comanche Peak Nuclear Power Plant Corridor Environmental Impact Statement-USACE 2009-00030)
- ML18338A575 + (Cooperation with States at Commercial Nuclear Power Plants and Other Nuclear Production and Utilization Facilities, Policy Statements)
- DT-17-12, Cooperation with States at Commercial Nuclear Power Plants and Other Nuclear Production or Utilization Facilities. ML18073A141 + (Cooperation with States at Commercial Nuclear Power Plants and Other Nuclear Production or Utilization Facilities. ML18073A141)
- ML20033C695 + (Cooperative Agreement Between Us DOE & State of Co)
- ML20058N954 + (Cooperative Agreement Mod 3,exercising Option to Extend Period of Performance & Providing Funds,To Maint & Operation of Lpdr)
- ML20059F493 + (Cooperative Agreement Mod 5,extending Period of Performance & Providing Funding,To Maint & Operation of Lpdr)
- ML20055H041 + (Cooperative Agreement Mod 6,providing Funding & Extending Period of Performance,To Maint & Operation of Lpdr)
- ML20134C505 + (Cooperative Agreement NRC-04-96-079, Collaborative Computing Tools to Support Natl Objectives for Future Use of Computer Technology in Government & Private Sectors, Awarded to Univ of Il,Ncsa)
- ML20237E071 + (Cooperative Agreement NRC-04-98-056, Probabilistic Assessment & Applications, Awarded to Univ of MD)
- ML20153G307 + (Cooperative Agreement NRC-27-99-001, NRC Historically Black Colleges & Univs Research Participation Program, from 981001 to 010930,awarded to Oak Ridge Associated Univs)
- ML20236Y628 + (Cooperative Agreement NRCG-33-98-181, Financial Assistance for Pdrs, Awarded to Univ of Utah,Marriot Library)