Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20259C389 + (Containment Isolation ESF Monitoring Train B Logic Diagram System:Z-26. Sheet 29)
- ML20259C379 + (Containment Isolation ESF Monitoring Train B Logic Diagram System:Z-26. Sheet 26)
- ML20259C293 + (Containment Isolation ESF Monitoring Train C Logic Diagram System:Z-26. Sheet 26)
- ML20260C995 + (Containment Isolation Phase a ESF Status Monitoring Train C Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41881 1)
- ML20260C723 + (Containment Isolation Phase a ESF Status Monitoring Train a Logic Diagram System:Sm. Actual Drawing NUMBER:7Z-26-9-Z-41824 1)
- ML20261L299 + (Containment Isolation Phase a ESF Status Monitoring Train a Logic Diagram:Sm)
- Regulatory Guide 1.141 + (Containment Isolation Provisions for Fluid Systems)
- 05000317/LER-1983-032-03, Containment Isolation Signal Logic Module B Would Not Actuate.Caused by Defective Electronic Logic Components.Module Replaced,Tested & Returned to Svc + (Containment Isolation Signal Logic Module B Would Not Actuate.Caused by Defective Electronic Logic Components.Module Replaced,Tested & Returned to Svc)
- 05000341/LER-2022-004, Containment Isolation Valve Actuator Found Disconnected from Its Bonnet Resulting in Condition Prohibited by Technical Specifications + (Containment Isolation Valve Actuator Found Disconnected from Its Bonnet Resulting in Condition Prohibited by Technical Specifications)
- 05000316/LER-2002-001, Containment Isolation Valve Alignment Error During Local Leak Rate Testing + (Containment Isolation Valve Alignment Error During Local Leak Rate Testing)
- ENS 41682 + (Containment Isolation Valve Closure)
- 05000280/LER-2000-001, Containment Isolation Valve Found with Unacceptable Leakage During Maintenance + (Containment Isolation Valve Found with Unacceptable Leakage During Maintenance)
- 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function + (Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function)
- 05000305/FIN-2009004-02 + (Containment Isolation Valve Inoperable with No Technical Specification Action Requirement Entry)
- 05000302/LER-1983-003-03, Containment Isolation Valve MUV-41 Declared Inoperable.Caused by Stripped Gear Train Due to Lack of Lubrication.Gears Replaced & Lubricated + (Containment Isolation Valve MUV-41 Declared Inoperable.Caused by Stripped Gear Train Due to Lack of Lubrication.Gears Replaced & Lubricated)
- 05000316/LER-1980-034-03, Containment Isolation Valve NCR-252 Found Not Fully Seated W/Shut Indication in Control Room During Mode 5.Cause Undetermined.Valve Stroke Adjusted + (Containment Isolation Valve NCR-252 Found Not Fully Seated W/Shut Indication in Control Room During Mode 5.Cause Undetermined.Valve Stroke Adjusted)
- 05000316/LER-1981-067-03, Containment Isolation Valve QCR-300 Blocked Open to Allow Isolation of Associated Air Header for Repair.Caused by Personnel Error.Shift Supervisor Reinstructed + (Containment Isolation Valve QCR-300 Blocked Open to Allow Isolation of Associated Air Header for Repair.Caused by Personnel Error.Shift Supervisor Reinstructed)
- 05000346/FIN-2013002-02 + (Containment Isolation Valve Rendered Inoperable by Wrong Component Operator Error)
- ML20065G697 + (Containment Isolation Valve Replacement Program Rept)
- 05000334/FIN-2009008-01 + (Containment Isolation Valve System 10 CFR 50.65 (a)(2) Performance Demonstration Not Met.)
- ML19273B444 + (Containment Isolation Valve Tests Proposed in Do Not Meet 10CFR50 App J Criteria.Exemption Application Will Require Further Justification Before Alternate Testing Method Is Approved)
- ML22140A138 + (Containment Isolation Valves)
- ML22140A136 + (Containment Isolation Valves)
- ENS 43410 + (Containment Isolation Valves Found Misaligned)
- 05000259/FIN-2009007-02 + (Containment Isolation Valves not Included in the Appendix R Separation Analysis)
- ML20260B381 + (Containment Isolation Vlvs Logic Diagram System:Ra)
- ML20038C270 + (Containment Isolation/Purge Valve Analysis for 18-Inch 2FII Butterfly Valve w/744-A-1SR Bettis-Operator & 746a-2SR Bettis-Operator)
- ML20137Q230 + (Containment Issue Isolation Transient)
- ML052930157 + (Containment Iwl Inservice Inspection Plan and Relief Requests IWL1)
- ML20263F257 + (Containment Leak Detection Radiation Monitor Seismic Modifications)
- ENS 50509 + (Containment Leak Rate Exceeds Acceptance Criteria)
- ENS 53393 + (Containment Leak Rate Greater than Tech Spec)
- ML20104A285 + (Containment Leak Rate Test Program Incorporating Updated NRC Positions)
- ML20126F715 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Sept 1983)
- ML20126F697 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Aug 1983)
- ML20126F600 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Dec 1982)
- ML20126F761 + (Containment Leak Rate Testing Investigations, Monthly Program for Dec 1983)
- ML20126F822 + (Containment Leak Rate Testing Investigations, Monthly Program for Mar 1984)
- ML20126F649 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for May 1983)
- ML20126F939 + (Containment Leak Rate Testing Investigations, Monthly Program for Apr 1984)
- ML20126F765 + (Containment Leak Rate Testing Investigations, Monthly Program for Jan 1984)
- ML20126F603 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Jan 1983)
- ML20126F780 + (Containment Leak Rate Testing Investigations, Monthly Program for Feb 1984)
- ML20126F216 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Oct 1982)
- ML20126F728 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Oct 1983)
- ML20126F628 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Apr 1983)
- ML20126E994 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982)
- ML20126F954 + (Containment Leak Rate Testing Investigations, Monthly Program for June 1984)
- ML20126F615 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl)
- ML20127A289 + (Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982)
- ML20126F752 + (Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1983)