Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3F1-2003-0089, Combined Category C-3 and 15-Day Special Report SR-03-002-00 on the 12th Refueling Outage Steam Generator Tube Inservice Inspection + (Combined Category C-3 and 15-Day Special Report SR-03-002-00 on the 12th Refueling Outage Steam Generator Tube Inservice Inspection)
- ML051460385 + (Combined Category C-3 and 15-Day Special Report SR-05-001-00 on the 13th Refueling Outage Steam Generator Tube Inservice Inspection)
- ML19268A254 + (Combined Chronology of NRC Response to TMI Incident)
- ML13098A804 + (Combined Emergency Plan Review)
- NL-02-124, Combined Emergency Plan. Changes Integrated & Upgraded Units 1 & 2 Plan with Unit 3 Plan in Combined Site Emergency Plan for Indian Point Energy Center + (Combined Emergency Plan. Changes Integrated & Upgraded Units 1 & 2 Plan with Unit 3 Plan in Combined Site Emergency Plan for Indian Point Energy Center)
- ML20210M071 + (Combined End-of-Cycle 2019 Public Meeting Slide Presentation)
- IR 05000293/1986015 + (Combined Exam & Insp Rept 50-293/86-15OL,conducted During Wk of 860505.Exam Results:Four Reactor Operator & Two Senior Reactor Operator Candidates Passed.Major Areas Inspected: Requalification Training Program)
- IR 05000387/1994015 + (Combined Exam Repts 50-387/94-15OL & 50-388/94-16OL on 940808-10.Exam Results:Applicant Passed All Portions of Exam)
- IR 05000272/1979033 + (Combined IE Insp Repts 50-272/79-33 & 50-311/79-38 on 791216-800202.Noncompliance Noted:Check Valve 1DR7,last Valve in Demineralized Water Supply to Auxiliary Feedwater Storage Tank,Was Not Designed to Seismic Requirements)
- ML18082A390 + (Combined IE Insp Repts 50-272/80-05 & 50-311/80-02 on 800203-0301.No Noncompliance Noted.Major Areas Inspected: Tours of Facility,Record Review,Review of Licensee Events, Core Physics Surveillance & Followup on Previous Insp Items)
- IR 05000289/1979021 + (Combined IE Insp Repts 50-320/79-29 & 50-289/79-21 on 791023-1127.Noncompliance Noted:Failure to Store & Control Licensed Matls in Unrestricted Areas)
- IR 05000289/1980032 + (Combined IE Mgt Meeting Repts 50-289/80-32 & 50-320/80-21 on 801217.Major Areas Discussed:Proposed Corrective Action for Items Identified in Health Physics Evaluation of Rept 50-289/80-22)
- IR 05000029/2006001 + (Combined IR 05000029-06-001 and 05000029-07-001, in 2006-2007, Yankee Atomic Electric Company, Rowe, Massachusetts)
- ML20344A057 + (Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors)
- ML20244D113 + (Combined Insp Repts 50-020/89-01 & 70-0938/89-01 on 890308-10.Violation Noted.Major Areas Inspected:Nuclear Matl Control,Accounting & Physical Security,Including Organization & Operation & Shipping & Receiving)
- ML20235V578 + (Combined Insp Repts 50-054/87-04 & 70-0687/87-05 on 870810-13.Violation Noted.Major Areas Inspected:Licensee Actions in Response to Confirmatory Action Ltr CAL-87-01 & Status of Radiological Controls Program Upgrades)
- IR 05000054/1990080 + (Combined Insp Repts 50-054/90-80 & 70-0687/90-80 on 900209- 16 & 26.Violations Noted.Major Areas Inspected:Circumstances Surrounding Pool Sys Leaks,Licensee Radiological Measurement Capability & Control of Liquid Releases)
- IR 05000220/1992011 + (Combined Insp Repts 50-220/92-11 & 50-410/92-13 on 920401- 28.No Violations Noted.Major Areas Inspected:Operations, Radiological Controls,Maint,Surveillance,Security & Safety Assessment/Quality Verification Activities)
- IR 05000272/1987018 + (Combined Insp Repts 50-272/87-18 & 50-311/87-20 on 870615-19.No Violations Noted.Major Areas Inspected: Feedwater & Condensate Sys,Including Maint,Surveillance, Design Changes,Operations & Mgt Overview)
- IR 05000272/1993004 + (Combined Insp Repts 50-272/93-04,50-311/93-04 & 50-354/93-04 on 930111-15.No Violations Noted.Major Areas Inspected:Mgt Controls,Qa Audits,Qa/Qc of Measurement Lab,Surveillance Procedures & Meteorological Monitoring Program)
- IR 05000272/1993016 + (Combined Insp Repts 50-272/93-16,50-311/93-16 & 50-354/93-13 on 930524-28 & 0601-04.No Violations Noted. Three Weaknesses Noted.Major Areas Inspected:Licensed Operator Requalification Training Program)
- IR 05000277/1990005 + (Combined Insp Repts 50-277/90-05 & 50-278/90-05 on 900122-26.No Violations or Deviations Noted.Major Areas Inspected:Transportation & Solid Radwaste Programs,Including Mgt Controls,Audits,Qa & Implementation of Programs)
- ML20134G680 + (Combined Insp Repts 50-317/96-09 & 50-318/96-09 on 960812-0906.Violation Noted.Major Areas Inspected: Engineering & Technical Support to Plant Operations & Configuration Mgt)
- IR 05000334/1989023 + (Combined Insp Repts 50-334/89-23 & 50-412/89-22 on 891118-1231.Violation Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Security, Radiological Controls,Plant Housekeeping & Fire Protection)
- IR 05000334/1990005 + (Combined Insp Repts 50-334/90-05 & 50-412/90-04 on 900129. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding Shipment of Scaffolding to Quadrex Recycle Ctr,Oak Ridge,Tn on 900110)
- 05000338/LER-1981-009-03, Combined Leakage in Excess of Allowable Limits Noted from 14 Electrical Penetrations & 23 Valves.Valve Leakage Caused by Valve Seat Deterioration or Limit Switch Drift + (Combined Leakage in Excess of Allowable Limits Noted from 14 Electrical Penetrations & 23 Valves.Valve Leakage Caused by Valve Seat Deterioration or Limit Switch Drift)
- ML17088A330 + (Combined License)
- ML17088A329 + (Combined License)
- ND-23-0690, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests + (Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests)
- ND-22-0917, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests + (Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests)
- ND-22-0937, Combined License (COL) License Condition 2 .D.(4)(d) Completion of Initial Criticality and Low-Power Tests + (Combined License (COL) License Condition 2 .D.(4)(d) Completion of Initial Criticality and Low-Power Tests)
- ND-20-0166, Combined License (COL) License Condition 2.D.(2)(c) Notification of Design-Specific Preoperational Tests + (Combined License (COL) License Condition 2.D.(2)(c) Notification of Design-Specific Preoperational Tests)
- ND-23-0693, Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests + (Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests)
- ND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests + (Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests)
- ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests + (Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests)
- ND-20-0449, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-20-0716, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-20-1384, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-22-0431, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-22-0238, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-21-0615, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections. Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections. Tests, and Analyses (ITA))
- ND-21-0742, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections. Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections. Tests, and Analyses (ITA))
- ND-22-0033, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections. Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections. Tests, and Analyses (ITA))
- ND-21-0557, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections. Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections. Tests, and Analyses (ITA))
- ND-22-0652, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-23-0540, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-23-0445, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-23-0338, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-23-0182, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-23-0098, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-23-0007, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))
- ND-22-0868, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) + (Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 4 Completion Schedule for Inspections, Tests, and Analyses (ITA))