Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16005A061 + (Comanche Peak Nuclear Power Plant, Units 1 and 2, NRC Inspection Report 05000445/2015409 and 05000446/2015409)
- IR 05000445/2015409 + (Comanche Peak Nuclear Power Plant, Units 1 and 2, NRC Inspection Report 05000445/2015409 and 05000446/2015409)
- ML17017A491 + (Comanche Peak Nuclear Power Plant, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2016501 and 05000446/2016501 (Cover Letter Only))
- ML120590933 + (Comanche Peak Nuclear Power Plant, Units 1 And 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2011501 and 05000446/2011501)
- ML13074B060 + (Comanche Peak Nuclear Power Plant, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2012501 and 05000446/2012501)
- IR 05000445/2012503 + (Comanche Peak Nuclear Power Plant, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000445/2012501 and 05000446/2012501)
- ML113400034 + (Comanche Peak Nuclear Units 1 & 2, Callaway Plant, Diablo Canyon Units 1 & 2, Diablo Generic Fundamentals Section of the Written Operator Licensing Examination)
- CP-201101065, Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases + (Comanche Peak Units 1 & 2 Final Safety Analysis Report (Fsar), Amendment 104, Technical Specifications Bases)
- CP-201101065, Comanche Peak Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 104 + (Comanche Peak Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 104)
- CPSES-200202322, Comanche Peak'S 30 Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity + (Comanche Peak'S 30 Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity)
- CP-200900615, Comanche Peak, 2008 Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008 + (Comanche Peak, 2008 Radioactive Effluent Release Report, January 1, 2008 - December 31, 2008)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 + (Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a + (Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 + (Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 + (Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20)
- CP-201300480, Comanche Peak, Unit 1, Submittal of Cycle 17 Core Operating Limits Report, Revision 0 + (Comanche Peak, Unit 1, Submittal of Cycle 17 Core Operating Limits Report, Revision 0)
- CP-201300130, Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67 + (Comanche Peak, Units 1 & 2, Technical Specification Bases, Revision 67)
- CP-201300130, Comanche Peak, Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendments 105 + (Comanche Peak, Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendments 105)
- ML16180A432 + (Comanche Peak, Units 1 and 2 - FSAR Amendment 107, Text - Chapters 3 and 4)
- CP-201300040, Comanche Peak, Units 1 and 2 - Transmittal of Year 2012 Radiological Environmental Operating Report + (Comanche Peak, Units 1 and 2 - Transmittal of Year 2012 Radiological Environmental Operating Report)
- CP-201200347, Comanche Peak, Units 1 and 2, Enclosure 1 to TXX-12061, 2011 Radioactive Effluent Release Report + (Comanche Peak, Units 1 and 2, Enclosure 1 to TXX-12061, 2011 Radioactive Effluent Release Report)
- CP-201200034, Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011 + (Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011)
- CP-201200347, Comanche Peak, Units 1 and 2, Transmittal of Year 2011 Radioactive Effluent Release Report + (Comanche Peak, Units 1 and 2, Transmittal of Year 2011 Radioactive Effluent Release Report)
- CP-200900615, Comanche Peak, Units 1 and 2, Transmittal of Year 2008 Radioactive Effluent Release Report + (Comanche Peak, Units 1 and 2, Transmittal of Year 2008 Radioactive Effluent Release Report)
- CPSES-200001350, Comanche Peak,Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu Electric + (Comanche Peak,Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu Electric)
- ML20151H624 + (Comanche Peak...Whipjet Program Rept)
- ML021710118 + (Comanche Peaks 30 Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity)
- CPSES-200201164, Comanche Response to Request for Additional Information to License Amendment Request (LAR) 01-008: Revision to Technical Specification (TS) 3.3.2, ESFAS Instrumentation and 3.3.6, Containment Ventilation Isolation Instrumentation + (Comanche Response to Request for Additional Information to License Amendment Request (LAR) 01-008: Revision to Technical Specification (TS) 3.3.2, ESFAS Instrumentation and 3.3.6, Containment Ventilation Isolation Instrumentation)
- CPSES-200200251, Comanche Units 1 & 2, Additional Information Requested During Regulatory Conference of January 23, 2002 + (Comanche Units 1 & 2, Additional Information Requested During Regulatory Conference of January 23, 2002)
- ML020870152 + (Comanche, Ltr, Security Clearance Letter)
- ML092080570 + (Comanche, Notification of Inspection (NRC Inspection Report 05000446-09-005) and Request for Information)
- CPSES-200502462, Comanche, Response to Follow-Up Request for Information License Amendment Request (LAR) 02-07 for Revision to Technical Specification 3.8.1 Surveillance Requirement Mode Restriction Notes + (Comanche, Response to Follow-Up Request for Information License Amendment Request (LAR) 02-07 for Revision to Technical Specification 3.8.1 Surveillance Requirement Mode Restriction Notes)
- CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date + (Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date)
- ML12278A090 + (Comanche, Single Positive Test Form, for Pre-Access, Collected on 10/03/2012)
- CPSES-200300792, Comanche, Units 1 & 2, Inservice Testing Plan for Pumps & Valves, Edition of ASME Code, Section XI, No Addenda, Interval Start Date: August 3, 1993 + (Comanche, Units 1 & 2, Inservice Testing Plan for Pumps & Valves, Edition of ASME Code, Section XI, No Addenda, Interval Start Date: August 3, 1993)
- TXX-1606, Comanche, Units 1 and 2 - Transmittal of Year 2015 Radiological Environmental Operating Report + (Comanche, Units 1 and 2 - Transmittal of Year 2015 Radiological Environmental Operating Report)
- ML20101M544 + (Combination of Mut Pressure & Level Errors)
- ML19038A489 + (Combine Fuels and Quality Assurance Braidwood Tvel LTA LAR Audit Plan)
- TSTF-136 + (Combine LCO 3.1.1 and 3.1.2)
- ML24108A071 + (Combined - 2023 Annual Assessment Public Meeting Slides)
- CNL-15-053, Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model + (Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model)
- ML031290160 + (Combined 2002 Annual Radioactive Effluent Release Report, Attachment 1, Table 1A Through Off Dose Calculation Manual, Revision 23)
- ML031630807 + (Combined 2002 Annual Radioactive Effluent Release Report, Section 3.0 Through Table 2.1-2)
- ML031290130 + (Combined 2002 Annual Radioactive Effluent Release Report)
- ML051260265 + (Combined 2004 Annual Radioactive Effluent Release Report)
- ML071290369 + (Combined 2006 Annual Radioactive Effluent Release Report, Including Off-Site Dose Calculation Manual Part 4, and Errata Report for the 2005 Annual Radioactive Effluent Release Report)
- ML081300410 + (Combined 2007 Annual Radioactive Effluent Release Report)
- ML091280437 + (Combined 2008 Annual Radioactive Effluent Release Report)
- TMI-10-031, Combined 2009 Annual Radioactive Effluent Release Reports + (Combined 2009 Annual Radioactive Effluent Release Reports)
- TMI-11-058, Combined 2010 Annual Radioactive Effluent Release Report + (Combined 2010 Annual Radioactive Effluent Release Report)
- TMI-13-057, Combined 2012 Annual Radioactive Effluent Release Report + (Combined 2012 Annual Radioactive Effluent Release Report)