Combined 2002 Annual Radioactive Effluent Release Report
ML031290130
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 04/30/2003
From: George Gellrich
AmerGen Energy Co
To:
Document Control Desk, NRC/FSME
References
-RFPFR, 5928-03-20051, RG-1.021
Download: ML031290130 (2)


Text

Amer@E 05an AmerGen Energy Company, H-C Telephone 717-944-7621 An Exelon/British Energy Company Three Mile Island Unit 1 Route 441 South, P0 Box 480 Middletown, PA 17057 April30, 2003 5928-03-20051 U. S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION UNIT 1 AND UNIT 2 OPERATING LICENSE NO. DPR-50 AND POSSESSION ONLY LICENSE NO.

DPR 73 DOCKET NOS. 50-289 AND 50-320 COMBINED 2002 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT The Annual Radioactive Effluent Release Report required by TMI-1 Technical Specification 6.9.4.1, TMI-2 Technical Specifications 6.8.1.2, and 6.12, and the Off-Site Dose Calculation Manual Part 4, Section 2.1 is enclosed.

Attachment 1 contains a summary of the quantities of radioactive liquid and gaseous effluents released from the site as outlined in Reg Guide 1.21, Rev. 1, with data summarized on a quarterly basis following the format of Appendix B thereof.

Attachment 2 contains information for each type of solid waste shipped offsite during the report period including the container volume, total curie quantity (specified as determined by measurement or estimate), principal radionuclides (specified as determined by measurement or estimate), type of waste, type of shipment and solidification agent(s).

Attachment 3 includes a summary of unplanned releases from the site to unrestricted areas of radioactive materials in gaseous and liquid effluents made during the reporting period.

Attachment 4 describes any changes made during 2002 to the Process Control Program (PCP) documents or to the Offsite Dose Calculation Manual (ODCM) and a listing of new locations for dose calculations and/or environmental monitoring identified by the land use census pursuant to Part 3, Section 8.2 of the ODCM.

Attachment 5 reports all instrumentation not returned to operable status within 30 days per the TMI ODCM Part 1, Sections 2.1.1.b and 2.1.2.b and Part 2, Section 2.1.2.b.

Attachment 6 is an annual summary of hourly meteorological data collected for 2002 in the form of joint frequency distribution of wind speed, wind direction and atmospheric stability.

YSD Aqct A&mDsi l

5928-03-20051 Page 2 of 2 is an assessment of the radiation doses due to the radioactive liquid and gaseous effluents released from the respective unit during 2002. is an assessment of the radiation doses from the radioactive liquid and gaseous effluents to members of the public due to their activities inside the site boundary during 2002. is an assessment of the radiation doses to the likely most exposed real individual from reactor releases and other nearby uranium fuel cycle sources including doses from primary effluent pathways and direct radiation for 2002. 0 is a summation of deviations from the sampling and analysis regime specified in the ODCM for TM I-1 and TM 1-2. is a copy of the TMI Offsite Dose Calculation Manual (ODCM), revision 23, which was current as of December 31, 2002. There was one revision made to the ODCM during 2002. Revision 23 was issued on March 19, 2002. is a copy of the procedure change request that modified the ODCM from revision 22 to 23.

Please contact Adam Miller of TMI-1 Regulatory Assurance at 717-948-8128 if you have any questions concerning this report.

Sincerely, George H. Gellrich Plant Manager GHG/awm Attachments/Enclosures cc: Region 1 Administrator TMI Senior Resident Inspector TMII-1 Senior Project Manager TMI-2 Project Manager GPU Nuclear Cognizant Officer