Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19346F971 + (CISF Env S-106 - (External_Sender) FW: Scanned from a Xerox Multifunction Device)
- ML19275F380 + (CISF Env S-106 - FW: Message from KM_C308)
- ML18130A735 + (CISF Environmental Impact Statement Federal Register Notice - Adding Additional Meetings and Extending the Comment Period)
- ML20237F387 + (CISF Letter Transmitting Final Report for Comment to Consulting Tribes-THPO)
- ML20237F377 + (CISF Letter Transmitting Final Report for Comment to Consulting Tribes-THPO)
- ML20237F360 + (CISF Letter Transmitting Final Report for Comment to Consulting Tribes-THPO)
- ML20237F347 + (CISF Letter Transmitting Final Report for Comment to Consulting Tribes-THPO)
- ML18130A895 + (CISF Public Scoping Meeting April 25, 2018, Transcript)
- ML18130A901 + (CISF Public Scoping Meeting April 30, 2018, Transcript)
- ML18130A902 + (CISF Public Scoping Meeting May 1, 2018, Transcript)
- ML18130A906 + (CISF Public Scoping Meeting May 3, 2018, Transcript)
- ML21015A035 + (CISF RAI Response Review and Follow-up Information Need)
- ML15238A900 + (CISI-1462.10.0040, Revision 0, Fourth Interval Inservice Inspection Outage Schedule, Quality Assurance Program Related)
- CNS-15-074, CISI-1462.10.0040, Revision 0, Fourth Interval Inservice Inspection Outage Schedule, Quality Assurance Program Related + (CISI-1462.10.0040, Revision 0, Fourth Interval Inservice Inspection Outage Schedule, Quality Assurance Program Related)
- ML15238A898 + (CISI-1462.10.0040-ISI, Revision 1, Fourth Interval Inservice Inspection Plan)
- ML18059A869 + (CK-ES3166 Leak Root Cause Analysis E-PAL-94-008, Rev 1)
- ML20040A473 + (CLASIX-3 Containment Response Sensitivity Analysis)
- ML090640947 + (CLI-09-05, Memorandum and Order Regarding Appeal by the Connecticut Coalition Against Millstone and Nancy Burton of an Atomic Safety and Licensing Board Order Rejecting Its Attempt to Admit Late-filed Contentions)
- ML102730779 + (CLI-10-27 Memorandum and Order Denying Interlocutory Appeals, Reverse the Board Order, and Terminate Adjudicatory Proceeding)
- ML12053A104 + (CLI-12-03, Memorandum and Order, Pilgrim Watch Petition for Review of LBP-11-23, in Which Licensing Board Denied Pilgrim Watchs Motion to Admit Two Proposed New Contentions Challenging Entergys Environmental Report Based on Recent Nuclear E)
- ML12068A173 + (CLI-12-05 Memorandum and Order Affirming in Part and Reverse in Part LBP-11-2)
- ML12313A118 + (CLI-12-20, Memorandum and Order in the Matter of San Onofre, Units 2 and 3)
- ML12341A078 + (CLI-12-21 Memorandum and Order Denying Jones River Watershed Association and Pilgrim Watch Review of LBP-12-11)
- CLI-89-08, .* Discusses Decision CLI-89-08,denying Intervenors Request for Stay Pendente Lite to Conduct Low Power Testing. W/O Stated Encl.Related Correspondence + (CLI-89-08.* Discusses Decision CLI-89-08,denying Intervenors Request for Stay Pendente Lite to Conduct Low Power Testing. W/O Stated Encl.Related Correspondence)
- ML20062B978 + (CLI-90-08 Memorandum & Order.* Concludes That NRC Need Not File Environ Assessment or EIS Re Resumed Operation of Plant.Petitions to Intervene Forwarded to ASLB for Further Proceedings.W/Certificate of Svc.Served on 901017)
- ML18074A023 + (CLOSE-OUT of Fire Probabilistic Risk Assessment Frequently Asked Question 16-0011)
- 05000424/LER-2004-002 + (CLOSURE OF CONTROL ROOM AIR DAMPER RESULTS IN TECH. SPEC. NON-COMPLIANCE)
- ML070600303 + (CM ECR A2152754 Eval of Technical Basis for ECR OC-06-00879-001, 10/24/2006; Drywell Floor/Trough/Drainage Inspections and Repairs)
- ML19324G102 + (CMO Approval of Advisory Committee on the Medical Uses of Isotopes (ACMUI) Annual Report FY2019)
- 05000316/LER-2077-035, CMO-420, West CCW Heat Exchanger Motor Operated Outlet Isolation Would Not Operate Remotely + (CMO-420, West CCW Heat Exchanger Motor Operated Outlet Isolation Would Not Operate Remotely)
- ML072070356 + (CMP-022R1 and Unit 2, CMP-023R1, Response to Request for Additional Information Weld Overlays as an Alternative Repair Technique)
- ML092530198 + (CMP-24 and CMP - Alternative to Examination Requirements for Reactor Vessel Nozzle to Safe-End Butt Welds)
- ML20246N122 + (CMS Energy 1988 Annual Rept)
- ML051400042 + (CMS Energy Annual Report)
- ML20196J380 + (CMS Energy Corp 1987 Annual Rept)
- ML100880354 + (CN -2009-09- Public Forms)
- ML062020767 + (CN 06-017, NRC Inspection Manual)
- ML21230A346 + (CN 2021-06 Draft Written Comments kdc-rev1 Final)
- ML20266C446 + (CN 4 Condensate Pump Suction Control Bldg Class IV P)
- ML071550385 + (CN-10-2005-Final-Written Exam)
- ML061180312 + (CN-10-2006-Corporate Notification Letter; Cooper NRC Initial Operator Licensing Examination Report 05000298-06-301)
- ML062900441 + (CN-10-2006-Final Reference Operating Exam with Corrections)
- ML062900043 + (CN-10/2006-Final Reference Operating Exam)
- ML071840232 + (CN-10/2006-Licensee Post Exam Comments)
- ML100880175 + (CN-2009-09-Draft Operating Test Outlines)
- ML100880239 + (CN-2009-09-Draft Outline Comments)
- ML100880256 + (CN-2009-09-Final Operating Test Jpms)
- ML100880258 + (CN-2009-09-Final Operation Test Outline)
- ML20241A250 + (CN-2020-04 Post Exam Comments)
- ML20324A037 + (CN-2020-09-DRAFT Op Test)