April 28, 2006

Randall K. Edington, Vice

President-Nuclear and CNO

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - NRC INITIAL OPERATOR LICENSING

EXAMINATION REPORT 05000298/2006-301

Dear Mr.Eddington:

In a telephone conversation on April 7, 2006, between Messrs. T. O. McKernon, Chief

Examiner, and J. Dedic, Supervisor, Operator Training, arrangements were made for the

administration of licensing examinations at your Cooper Nuclear Station during the weeks of

October 2 and 9, 2006

As agreed during the telephone conversation, the facility staff will prepare the written

examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The NRC regional office will prepare the

operating test outline and tests as agreed upon. The remainder of the operating test will be

developed by your facility staff. The NRC regional office will review and discuss with your staff

any changes that might be necessary before the examinations are administered.

The supporting reference materials identified in Attachment 2 of ES-201 and the integrated

exam outlines should be provided to the NRC by July 19, 2006. The portions of the draft

examination you are developing along with any supporting material are to be provided to us by

August 3, 2006. Any delay in receiving the required examination and reference materials, or

the submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. Additionally, an onsite validation of the examination material will be performed

during the week of September 11, 2006. Sufficient staff resources and the simulator should be

made available for the examination validation.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

Nebraska Public Power District -2-

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and any waiver requests (OMB approval number 3150-0090) at least 30 days before the first

examination date, or no later than September 6, 2006. Signed applications certifying that all

training has been completed should be submitted at least 14 days before the first examination

date, or no later than September 18, 2006. If the applications are not received at least 14 days

before the examination date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its

enclosures, and your response will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Record (PARS) component of the NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. J. Dedic has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Tom McKernon at 817-860-8153, or

myself at 817-860-8159.

Sincerely,

/RA/ GWJ for

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-298

License: DPR-46

Nebraska Public Power District -3-

cc:

Gene Mace

Nuclear Asset Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

John C. McClure, Vice President

and General Counsel

Nebraska Public Power District

P.O. Box 499

Columbus, NE 68602-0499

P. V. Fleming, Licensing Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

Michael J. Linder, Director

Nebraska Department of

Environmental Quality

P.O. Box 98922

Lincoln, NE 68509-8922

Chairman

Nemaha County Board of Commissioners

Nemaha County Courthouse

1824 N Street

Auburn, NE 68305

Julia Schmitt, Manager

Radiation Control Program

Nebraska Health & Human Services

Dept. of Regulation & Licensing

Division of Public Health Assurance

301 Centennial Mall, South

P.O. Box 95007

Lincoln, NE 68509-5007

H. Floyd Gilzow

Deputy Director for Policy

Missouri Department of Natural Resources

P. O. Box 176

Jefferson City, MO 65102-0176

Nebraska Public Power District -4-

Director, Missouri State Emergency

Management Agency

P.O. Box 116

Jefferson City, MO 65102-0116

Chief, Radiation and Asbestos

Control Section

Kansas Department of Health

and Environment

Bureau of Air and Radiation

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Daniel K. McGhee

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

Ronald D. Asche, President

and Chief Executive Officer

Nebraska Public Power District

1414 15th Street

Columbus, NE 68601

Jerry C. Roberts, Director of

Nuclear Safety Assurance

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

John F. McCann, Director, Licensing

Entergy Nuclear Northeast

Entergy Nuclear Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601-1813

Keith G. Henke, Planner

Division of Community and Public Health

Office of Emergency Coordination

930 Wildwood, P.O. Box 570

Jefferson City, MO 65102

Nebraska Public Power District -5-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (SCS)

Branch Chief, DRP/C (KMK)

Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

DRS STA (DAP)

S. O'Connor, OEDO RIV Coordinator (SCO)

ROPreports

CNS Interim Site Secretary Assistance (DVY)

SUNSI Review Completed: __Y____ ADAMS: : Yes G No Initials: _TOM_____

Publicly Available G Non-Publicly Available G Sensitive  : Non-Sensitive

SOE:OB C:OB

TOMcKernon/lmb ATGody

/RA/ /RA/ GEW for

4/17/06 4/28/06

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax